Search results
1 – 10 of over 89000Linda Thomas‐Mobley and Non Khuncumchoo
The purpose is to investigate the usefulness of standardized construction contracts for facilities managers.
Abstract
Purpose
The purpose is to investigate the usefulness of standardized construction contracts for facilities managers.
Design/methodology/approach
Research methodologies include comprehensive literature review, examination of standard contracts and online survey with professional facilities managers.
Findings
The study concludes that, with minor alterations and diligence, information necessary for successful management of a built facility can be obtained from the constructor.
Practical implications
This research will assist facilities managers in preparation and review of standard construction contracts, to ensure they are receiving adequate information to properly manage a facility.
Originality/value
The paper helps to guide facility owners in their preparation and review of standard construction contracts.
Details
Keywords
The major purpose of the EuroInfo Conference is to discuss information resource management. Members of the European Commission and Polish business and industry managers have…
Abstract
The major purpose of the EuroInfo Conference is to discuss information resource management. Members of the European Commission and Polish business and industry managers have expressed the need for improved information management in Poland. Improved information resource management is essential to aid quick and efficient reform and recovery of the Polish economy. Future economic growth and sustainable economic development for Poland is dependent on the efficient use and management of vast amounts of information.
Su-Ling Fan, Wei-San Ong, Chun-Tin Wu, Nuria Forcada Matheu and Hamidreza Alavi
The purpose of this paper is to address the problems of the current facilities maintenance management (FMM) system in finding necessary information, identifying defective…
Abstract
Purpose
The purpose of this paper is to address the problems of the current facilities maintenance management (FMM) system in finding necessary information, identifying defective facilities and prioritizing maintenance work orders.
Design/methodology/approach
In this paper, in conjunction with building information modeling, a system is proposed to perform a preliminary inspection of each maintenance request, provide FMM staff with the location of the faulty facility and its associated details and provide recommendations for prioritizing repair work orders. Unity and Revit are used to implement the proposed system and a case study is conducted to demonstrate its effectiveness.
Findings
An augmented reality (AR)-FMM system was developed using the AR technique in this paper. This system provides the related information even if the FMM receives a problem report without facility information from the occupant and performs a preliminary inspection so that the faulty facility and the route to it are identified. In addition, a work order sequence of pending requests was provided. The visualization of the facility using AR technology has brought great convenience and ease to FMM staff.
Originality/value
This paper addresses the problems encountered in the current facility maintenance management system concerning AR technology.
Details
Keywords
Christaline Wijekoon, Anupa Manewa and Andrew David Ross
Building information modelling (BIM) provides a robust platform for information management in built environment facilities. However, one of the consequences of the limited…
Abstract
Purpose
Building information modelling (BIM) provides a robust platform for information management in built environment facilities. However, one of the consequences of the limited application of BIM in facilities information management (FIM) is that the potential value gain through the integration of as-built information during the operations management process has had limited exploration in current practice. The purpose of this paper is to explore the potential impact of BIM to enhance the value of FIM.
Design/methodology/approach
A detailed literature review was undertaken to identify BIM application in a construction context, and to develop a framework to investigate the value of information. An interpretative approach was adopted for data collection and analysis. A total of 14 semi-structured interviews were conducted with construction industry professionals to identify how value of FIM can be enhanced through BIM integration. The interview data were analysed using open and selective coding.
Findings
The findings confirm that information exchange between the construction and facilities management (FM) phases of a project are important in terms of efficient and effective maintenance of a facility as well as optimising the design task. With these promising benefits, BIM is an efficient mechanism to facilitate construction information exchange. However, there is an uncertainty over the optimum level of information that ought to be on a BIM model for FM purposes. The relationship between different aspects of value is a starting point to filter the required information for each individual project. In contrast, limited awareness of value of information exchange and the potential of BIM enabled FIM during construction is noted.
Research limitations/implications
The information exchange considered within this investigation was limited to two key phases of the facility life cycle, namely, construction and FM (in-use).
Practical implications
The findings bring insight into an unseen aspect of FM information needs that should be given priority in upcoming BIM developments. Also, it draws attention to how value is concerned in a daily basis beyond monetary terms.
Originality/value
The investigation of value enhancement through BIM integration in particular to FIM and ongoing research with new value dimensions.
Details
Keywords
GREGORY M. PERKINSON, VICTOR E. SANVIDO and FRANCOIS GROBLER
This paper presents a conceptual framework to store, manage and retrieve facility programming information called a Facility Programming Product Model (FPPM). The FPPM represents…
Abstract
This paper presents a conceptual framework to store, manage and retrieve facility programming information called a Facility Programming Product Model (FPPM). The FPPM represents an ‘open’ information framework that members of the facility team (owner, planner, designer, constructor and operator) can utilize to satisfy their individual information needs as providers or users of the facility. The FPPM is a systematized approach to creating, organizing, and presenting facility programming information. The framework allows the owner's representative to review the programming product (the programme) for completeness by establishing a structure designed to access programming criteria at varying levels of abstraction, during any phase of the building life cycle. The result is a programme which can be used as a tool to assist decision making and to evaluate objectively performance criteria during the life of a project.
Details
Keywords
The efficiency and effectiveness of hospital emergency rooms depend on the effectiveness of the information and communication system as well as on the physical facility itself…
Abstract
The efficiency and effectiveness of hospital emergency rooms depend on the effectiveness of the information and communication system as well as on the physical facility itself. Describes the role of information technology in the design of contemporary ER systems. A computerized information board is one system that can enhance the operation of an ER facility. Describes the structure of this system, as well as its integration with other computerized systems. Also describes design features that may help to reduce ER delays/frustration. Because many types of professionals are involved in the daily operations of an ER facility, their input to the design is essential. For this reason, also describes a group decision‐making process.
Details
Keywords
Nikdokht Ghadiminia, Mohammad Mayouf, Sharon Cox and Jan Krasniewicz
Building information modelling (BIM) creates a golden thread of information of the facility, which proves useful to those with the malicious intent of breaching the security of…
Abstract
Purpose
Building information modelling (BIM) creates a golden thread of information of the facility, which proves useful to those with the malicious intent of breaching the security of the facility. A cyber-attack incurs adverse implications for the facility and its managing organisation. Hence, this paper aims to unravel the impact of a cybersecurity breach, by developing a BIM-facilities management (FM) cybersecurity-risk-matrix to portray what a cybersecurity attack means for various working areas of FM.
Design/methodology/approach
This study commenced with exploring cybersecurity within various stages of a BIM project. This showcased a heightened risk of cybersecurity at the post-occupancy phase. Hence, thematic analysis of two main domains of BIM-FM and cybersecurity in the built environment led to the development of a matrix that illustrated the impact of a cybersecurity attack on a BIM-FM organisation.
Findings
Findings show that the existing approaches to the management of cybersecurity in BIM-FM are technology-dependent, resulting in an over-reliance on technology and a lack of cybersecurity awareness of aspects related to people and processes. This study sheds light on the criticality of cyber-risk at the post-occupancy phase, highlighting the FM areas which will be compromised as a result of a cyber-attack.
Originality/value
This study seeks to shift focus to the people and process aspects of cybersecurity in BIM-FM. Through discussing the interconnections between the physical and digital assets of a built facility, this study develops a cyber-risk matrix, which acts as a foundation for empirical investigations of the matter in future research.
Details
Keywords
Jennifer W. Keller and Chris Keller
Most larger companies and corporations who own or lease multiple locations face challenges in designing, tracking and managing property. The following case study examines the work…
Abstract
Most larger companies and corporations who own or lease multiple locations face challenges in designing, tracking and managing property. The following case study examines the work of the Facilities Design and Planning Group at Dow Jones & Co. The study follows the group’s efforts to improve the strategic efficacy of its operations by expanding its implementation of its computer‐aided facility management (CAFM) system and by developing some novel CAFM tools. These technologies are intended to reduce management costs by creating a central and comprehensive resource of facilities information. Both facilities professionals and those seeking facilities‐related information can then use this resource. These tools support day to day facilities operations, from master planning to project design and budgeting, from construction to lease management. Such technology increases accuracy through data validation, but remains flexible in reporting and inquiry. This paper documents both the evolution of these tools, and the decisions that guided their development. It aims to describe in detail the particular business circumstances that influenced Dow Jones’ efforts as well as expose the setbacks in using and expanding various aspects of the technology.
Details
Keywords
Javier Irizarry, Masoud Gheisari, Graceline Williams and Kathy Roper
Healthcare facility managers work in complex and dynamic environments where critical decisions are constantly made. Providing them with enhanced decision support systems would…
Abstract
Purpose
Healthcare facility managers work in complex and dynamic environments where critical decisions are constantly made. Providing them with enhanced decision support systems would result in a positive impact on the productivity and success of the projects they undertake, as well as the sustainability of critical healthcare infrastructure. The purpose of this paper is to propose a conceptual ambient intelligent environment for enhancing the decision-making process of the facility managers. This low-cost data-rich environment would use building information modeling (BIM) and mobile augmented reality (MAR) as technological bases for the natural human-computer interfaces and aerial drones as technological tools.
Design/methodology/approach
This paper presents a scenario for the integration of augmented reality (AR) and building information modeling (BIM) to build an ambient intelligent (AmI) environment for facility managers where mobile, natural, user interfaces would provide the users with required data to facilitate their critical decision-making process. The technological requirements for having such an intelligent environment are also discussed.
Findings
The proposed BIM-MAR-based approach is capable of enhancing maintenance related practices for facility managers who are mobile to integrate with their facilities' intelligent environment. This approach is also capable of providing a collaborative environment in which different stakeholders, across geographically distributed areas, could work together to solve facility management tasks.
Originality/value
In this paper ambient intelligence will be considered for the first time in the area of healthcare facility management practices to provide facility managers with an intelligent BIM-based environment to access facility information and consequently enhance their decision-making process.
Details
Keywords
Index by subjects, compiled by K.G.B. Bakewell covering the following journals: Facilities Volumes 8‐17; Journal of Property Investment & Finance Volumes 8‐17; Property Management…
Abstract
Index by subjects, compiled by K.G.B. Bakewell covering the following journals: Facilities Volumes 8‐17; Journal of Property Investment & Finance Volumes 8‐17; Property Management Volumes 8‐17; Structural Survey Volumes 8‐17.