Search results
1 – 10 of 71Lars Stehn and Alexander Jimenez
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…
Abstract
Purpose
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.
Design/methodology/approach
Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.
Findings
According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.
Originality/value
Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.
Details
Keywords
An Thi Binh Duong, Tho Pham, Huy Truong Quang, Thinh Gia Hoang, Scott McDonald, Thu-Hang Hoang and Hai Thanh Pham
The present study is performed to identify the propagation mechanism of the ripple effect as well as examine the simultaneous impact of risks on supply chain (SC) performance.
Abstract
Purpose
The present study is performed to identify the propagation mechanism of the ripple effect as well as examine the simultaneous impact of risks on supply chain (SC) performance.
Design/methodology/approach
A theoretical framework with many hypotheses regarding the relationships between SC risk types and performance is established. The data are collected from a large-scale survey supported by a project of the Japanese government to promote sustainable socioeconomic development for the Association of Southeast Asian Nations (ASEAN) region, with the participation of 207 firms. Structural equation modeling (SEM) is used to test the hypotheses of the theoretical framework.
Findings
It is indicated that human-made risk causes operational risk, while natural risk causes both supply risk and operational risk. Furthermore, the impacts of human-made risk and natural risk on performance are amplified through operational risk.
Research limitations/implications
This study is one of the first attempts that identifies the propagation mechanism of the ripple effect and examines the simultaneous impact of risks on performance in construction SCs.
Originality/value
Although many studies on risk management in construction SCs have been carried out, they mainly focus on risk identification or quantification of risk impact. It is observed that research on the ripple effect of disruptions has been very scarce.
Details
Keywords
Buddhini Ginigaddara, Srinath Perera, Yingbin Feng, Payam Rahnamayiezekavat and Mike Kagioglou
Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive…
Abstract
Purpose
Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive modernisation. The adoption of this modern production strategy by the construction industry would redefine the position of OSC. This study aims to examine whether the existing skills are capable of satisfying the needs of different OSC types.
Design/methodology/approach
A critical literature review evaluated the impact of transformative technology on OSC skills. An existing industry standard OSC skill classification was used as the basis to develop a master list that recognises emerging and diminishing OSC skills. The master list recognises 67 OSC skills under six skill categories: managers, professionals, technicians and trade workers, clerical and administrative workers, machinery operators and drivers and labourers. The skills data was extracted from a series of 13 case studies using document reviews and semi-structured interviews with project stakeholders.
Findings
The multiple case study evaluation recognised 13 redundant skills and 16 emerging OSC skills such as architects with building information modelling and design for manufacture and assembly knowledge, architects specialised in design and logistics integration, advanced OSC technical skills, factory operators, OSC estimators, technicians for three dimensional visualisation and computer numeric control operators. Interview findings assessed the current state and future directions for OSC skills development. Findings indicate that the prevailing skills are not adequate to readily relocate construction activities from onsite to offsite.
Originality/value
To the best of the authors’ knowledge, this research is one of the first studies that recognises the major differences in skill requirements for non-volumetric and volumetric OSC types.
Details
Keywords
Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa and Aparna Samaraweera
Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities…
Abstract
Purpose
Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities around its supply chain. Hence, the purpose of this study is twofold: to identify the OC project delivery models, the limitations in their procurement approach to facilitate the resilience of the supply chain and interventions to promote supply chain resilience (SCR) and to identify the gaps in the existing procurement process and propose further research areas that implement strategies to improve SCR.
Design/methodology/approach
The study was conducted as a systematic literature review. In total, 41 peer-reviewed research papers published between 2013 and 2023 were shortlisted through the preferred reporting items for systematic reviews and meta-analysis guidelines. A descriptive analysis was conducted, followed by a thematic analysis.
Findings
The descriptive analysis reveals that the emphasis on digitising OC has shifted to transforming the business model, procurement and supply chain with a human-centric view. In thematic analysis, the predictability of the SC partners and the probabilities of evaluating the prospects are revealed as arbitrary characteristics in the current procurement strategies. Rewarding collaborative relationships among SC partners and incorporating provisions to postpone the module delivery are some interventions to promote flexibility. Drafting comprehensive and effective contracts that address transparency issues and facilitating the need for continuous development of capabilities through procurement are among the further research avenues proposed.
Originality/value
This study is a precursor demonstrating the potential of the procurement process to implement the decrees of SCR for better goal congruence of the OC supply chain.
Details
Keywords
Salma Husna Zamani, Rahimi A. Rahman, Muhammad Ashraf Fauzi and Liyana Mohamed Yusof
Policymakers are developing government-level pandemic response strategies (GPRS) to assist architecture, engineering and construction (AEC) enterprises. However, the effectiveness…
Abstract
Purpose
Policymakers are developing government-level pandemic response strategies (GPRS) to assist architecture, engineering and construction (AEC) enterprises. However, the effectiveness of the GPRS has not been assessed. Therefore, this study aims to investigate the interrelationships between GPRS and AEC enterprises. To achieve that aim, the study objectives are to compare GPRS effectiveness between small-medium and large AEC enterprises, develop groupings to categorize interrelated GPRS and evaluate the effectiveness of the GPRS and interrelated constructs.
Design/methodology/approach
A systematic literature review and semi-structured interviews with 40 AEC industry professionals were carried out, generating 22 GPRS. Then, questionnaire survey data was collected among AEC professionals. In total, 114 valid survey answers were received and analyzed using the Kruskal–Wallis H test, normalized mean analysis, factor analysis and fuzzy synthetic evaluation.
Findings
Small-medium enterprises have four distinct critical GPRS: “form a special task force to provide support in maneuvering COVID-19,” “provide infrastructure investment budgets to local governments,” “develop employee assistance programs that fit all types of working groups” and “diversify existing supply chain.” Large enterprises have two distinct critical GPRS: “provide help in digitalizing existing construction projects” and “mandate COVID-19 as force majeure.” Eighteen GPRS can be categorized into the following five constructs: “market stability and financial aid,” “enterprise capability management,” “supply chain improvement,” “law and policy resources” and “information and workforce management.” The former two constructs are more effective than other GPRS constructs.
Originality/value
This is the first paper that evaluates the effectiveness of GPRS for AEC enterprises, providing new evidence to policymakers for well-informed decision-making in developing pandemic response strategies.
Details
Keywords
Khadija Echefaj, Abdelkabir Charkaoui, Anass Cherrafi, Anil Kumar and Sunil Luthra
The purpose of this study is to identify and prioritize capabilities and practices to ensure a resilient supply chain during an unexpected disruption. In addition, this study…
Abstract
Purpose
The purpose of this study is to identify and prioritize capabilities and practices to ensure a resilient supply chain during an unexpected disruption. In addition, this study ranks maturity factors that influence the main capabilities identified.
Design/methodology/approach
This paper is conducted in three stages. First, capabilities and practices are extracted through a literature review. Second, capabilities and practices are ranked using the analytical hierarchical process method. Third, a gray technique for order preference by similarity to ideal solution method is used to rank maturity factors influencing capabilities.
Findings
The findings indicate that responsiveness, readiness, flexibility and adaptability are the most important capabilities for supply chain resilience. Also, commitment and communication are the highest maturity factors influencing resilience capabilities.
Research limitations/implications
The findings provide a hierarchical vision of capabilities and practices for industries to increase resilience. Limitations of the paper are related to capabilities, practices and number of experts consulted.
Practical implications
This paper highlights the importance of high-maturity practices in resilience capability adoption. The findings of this study will encourage decisions-makers to increase maturity practices to build resilience against disruption.
Originality/value
The paper reveals that developing powerful capabilities, good practices and a high level of maturity improve supply chain resilience.
Details
Keywords
Hazwani Shafei, Rahimi A. Rahman, Yong Siang Lee and Che Khairil Izam Che Ibrahim
Amid rapid technological progress, the construction industry is embracing Construction 4.0, redefining work practices through emerging technologies. However, the implications of…
Abstract
Purpose
Amid rapid technological progress, the construction industry is embracing Construction 4.0, redefining work practices through emerging technologies. However, the implications of Construction 4.0 technologies to enhancing well-being are still poorly understood. Particularly, the challenge lies in selecting technologies that critically contribute to well-being enhancement. Therefore, this study aims to evaluate the implications of Construction 4.0 technologies to enhancing well-being.
Design/methodology/approach
A list of Construction 4.0 technologies was identified from a national strategic plan on Construction 4.0, using Malaysia as a case study. Fourteen construction industry experts were selected to evaluate the implications of Construction 4.0 technologies on well-being using fuzzy Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). The expert judgment was measured using linguistic variables that were transformed into fuzzy values. Then, the collected data was analyzed using the following analyses: fuzzy TOPSIS, Pareto, normalization, sensitivity, ranking performance and correlation.
Findings
Six Construction 4.0 technologies are critical to enhancing well-being: cloud & real-time collaboration, big data & predictive analytics, Internet of Things, building information modeling, autonomous construction and augmented reality & virtualization. In addition, artificial intelligence and advanced building materials are recommended to be implemented simultaneously as a very strong correlation exists between them.
Originality/value
The novelty of this study lies in a comprehensive understanding of the implications of Construction 4.0 technologies to enhancing well-being. The findings can assist researchers, industry practitioners and policymakers in making well-informed decisions to select Construction 4.0 technologies when targeting the enhancement of the overall well-being of the local construction industry.
Details
Keywords
Ali M. Saad, Mohammed Dulaimi, Suhaib Arogundade, Sambo Lyson Zulu and Chris Gorse
The recent failures and insolvencies of organisations related to the modern methods of construction (MMC) have gained increased attention and controversy across the UK…
Abstract
Purpose
The recent failures and insolvencies of organisations related to the modern methods of construction (MMC) have gained increased attention and controversy across the UK construction sector. Such failures are linked to their inability to achieve an economy of scale and drive key clients to accept the MMC as an alternative to traditional methods. This paper aims to unravel whether a phenomenon of “innovation negativism” has manifested and is contributing to public clients' indecision towards broader MMC, whether this is only linked to past negative experiences formed after the Second World War or whether additional contributing reasons exist to influence adoption.
Design/methodology/approach
This study focusses on exploring the decision-making of the UK public construction sector; therefore, this paper adopts a qualitative approach, utilising interviews with 14 carefully selected MMC experts, government advisors and public clients. The phenomenological stance adopted herewith enables the authors to make better sense of the perceptions of the interviewees, leading to the conceptualisation of the innovation negativism phenomenon.
Findings
The paper identifies nine themes that may be argued to promote a profound understanding of the MMC negativism influencing public clients' decision-making. The study has found that more than just the previous negative perceptions formulated post Second World War are driving innovation negativism in the UK public sector. Notably, the emerging themes are incomprehension, lacking evidence, communication, relationship history, bad experiences, uncertainty, inadequate experimentation, the business case and localism.
Originality/value
This study is the first construction management research that acts as a fair departure point to conceptualise the reasoning behind innovation negativism in the construction setting. Through mirroring demand's unipolarity for traditional methods, policy and decision-makers can now rely on the conceptualised reasoning to determine practical solutions to overcome clients' indecisions towards MMC.
Details
Keywords
The existing literature has been mainly focused on local problems but without an overall framework for studying the top-level planning of intelligent construction from a…
Abstract
Purpose
The existing literature has been mainly focused on local problems but without an overall framework for studying the top-level planning of intelligent construction from a systematic perspective. The purpose of this paper is to fill this gap.
Design/methodology/approach
This research adopts a deductive research approach.
Findings
This research proposes a reference architecture and related business scenario framework for intelligent construction based on the existing theory and industrial practice.
Originality/value
The main contribution of this research is to provide a useful reference to the Chinese government and industry for formulating digital transformation strategies, as well as suggests meaningful future research directions in the construction industry.
Details
Keywords
Richard Kadan and Jan Andries Wium
Due to the uniqueness of individual construction projects, identifying the dominant risk factors is needed for risk mitigation in ongoing and future projects. This study aims to…
Abstract
Purpose
Due to the uniqueness of individual construction projects, identifying the dominant risk factors is needed for risk mitigation in ongoing and future projects. This study aims to identify the dominant construction supply chain risk (CSCR) factors, based on studies conducted between 2002 and 2022.
Design/methodology/approach
The study adopts the preferred reporting items for systematic reviews and meta-analysis (PRISMA) procedure to identify, screen and select relevant articles in order to provide a bibliography and annotation of the prevalent risks in the supply chains. A descriptive analysis of the findings then follows.
Findings
The study’s findings have highlighted the three most prevalent risks in the construction supply chain (poor communication across project teams, changes in foreign currency rate, unfavorable climate conditions) as reported in literature, that project teams need to pay closer attention to and take proactive steps to mitigate.
Research limitations/implications
Due to limitations imposed by the chosen research methodology, tools, time frame and article availability, the study was unable to examine all CSCR-related papers.
Practical implications
The results will serve as a useful roadmap for risk/supply chain managers in the construction industry to take strategically proactive steps towards allocating resources for CSCR mitigation efforts.
Social implications
Context-specific research on the impact of social and cultural risks on the construction supply chain would be beneficial, due to emerging social network risk factors and the complex socio-cultural settings.
Originality/value
There is presently no study that has reviewed extant studies to identify and compile the dominant risk factors (DRFs) associated with the supply chain of construction projects for ranking in the supply chain risk management process.
Details