1 – 10 of over 4000Li-zi Luo, Chao Mao, Li-yin Shen and Zheng-dao Li
An industrialized building system (IBS) is regarded as an effective residential building system that provides several benefits, including high quality, low cost, short time, good…
Abstract
Purpose
An industrialized building system (IBS) is regarded as an effective residential building system that provides several benefits, including high quality, low cost, short time, good flexibility, reduced waste, and strong environmental performance. This system is considered to be valuable in promoting sustainable practices in China, where plans for urbanization have been established. However, the adoption of IBS in China is extremely limited. Potential risks exist and affect the attitudes of practitioners toward the use of this system. The purpose of this paper is to prioritize and analyze these risks and to develop corresponding strategies for mitigating these risks in China.
Design/methodology/approach
In total, 24 risks that inhibit the implementation of IBS in China are identified through literature review and examined through interviews for consistency. A questionnaire survey is conducted to quantify the significance of these risks. Cronbach’s coefficient α is employed to measure the internal consistency among the risk factors. The survey results are further analyzed using three case studies.
Findings
The top five risks identified are “poor cooperation between multi-interface,” “inappropriate design codes and standards for industrialized buildings,” “lack of management practices and experiences,” “enormous difficulty in achieving return on high initial investment,” and “lack of a quality monitoring mechanism for the production process.” The findings emphasize the government’s leading role in promoting the new building system in its introduction and enforcement of adequate policies and regulations. Practitioners are also instrumental in establishing proper understanding and knowledge of IBS and its application.
Originality/value
This study bridges the knowledge gaps on risk identification for implementing IBS in China. The findings provide practitioners and decision makers with valuable references for adopting adequate risk management methods and policies to promote IBS in China.
Details
Keywords
Ibrahim Yahaya Wuni, Geoffrey Qiping Shen, Adedayo Johnson Ogungbile and Jonathan Zinzi Ayitey
Industrialized construction (IC) is promoted to address some of the ills associated with the processes and products of the traditional construction approach. With several…
Abstract
Purpose
Industrialized construction (IC) is promoted to address some of the ills associated with the processes and products of the traditional construction approach. With several successful projects, IC is progressively becoming a preferred alternative construction approach and spurred the interest of contractors, developers and housing authorities in the technology. Increasingly, these stakeholders are keen to ascertain the compatibility and feasibility of using IC in their projects. This paper aims to develop a knowledge-based decision support framework for implementing industrialized construction projects (ICPs) that can facilitate better and informed decision-making when deciding to implement ICPs.
Design/methodology/approach
A comprehensive literature review was implemented to recruit 40 decision support factors (DSFs) and grouped into project requirements, location and site attribute, labour considerations and organizational factors. A 3-member expert panel validated the relevance of 35 DSFs, which became candidates for a structured questionnaire survey of experts in 18 countries. Statistical techniques are used to evaluate and prioritize the DSFs, leading to the development of a conceptual framework.
Findings
Statistical analysis revealed 33 significant DSFs. The top five most significant factors that could influence the decision to implement IC in a project include a stringent requirement for project quality control, suitability of the design for IC, organizational readiness and competencies in ICPs, client receptivity to IC and the need to minimize field construction time. A framework of project requirements, location and site attributes, labour considerations and organizational factors was proposed as decision support.
Practical implications
The proposed framework may help to inform decision-making regarding the implementation of IC in a project. It has wider applicability because it includes technical, managerial and operational aspects of and the required competencies for IC, which are shared between project types and territories. The prioritized DSFs could be used as a guide when implementing IC, especially in countries where bespoke decision support systems cannot be developed.
Originality/value
The paper delineated the most important DSFs that are shared between IC project types and territories and can be used to investigate the compatibility of using IC in a proposed project. This research constitutes the first exclusive attempt at delineating, quantifying and ranking the sets of decision-making factors, drawing on international data set and contributes to the empirical checklist of DSFs for ICPs.
Details
Keywords
Ibrahim Yahaya Wuni, Geoffrey Qiping Shen and Amos Darko
Industrialized construction (IC) leverages manufacturing principles and innovative processes to improve the performance of construction projects. Though IC is gaining popularity…
Abstract
Purpose
Industrialized construction (IC) leverages manufacturing principles and innovative processes to improve the performance of construction projects. Though IC is gaining popularity in the global construction industry, studies that establish the best practices for implementing IC projects are scarce. This study aims to benchmark practical lifecycle-based best practices for implementing IC projects.
Design/methodology/approach
The study used a qualitative research design where nine IC cases from Australia, Singapore and Hong Kong were analysed to identify best practices. The methodological framework of the study followed well-established case study research cycle and guidelines, including planning, data collection, data analysis and reflection on findings.
Findings
The study identified and allocated key considerations, relevant stakeholders, best practices, typical deliverables and best indicators to the different construction lifecycle phases of IC projects. It also developed a lifecycle-based framework of the best practices for IC projects.
Practical implications
The study provides practitioners with practical insight into how best to effectively implement, manage and evaluate the performance of the IC project lifecycle phases. The proposed framework can serve as a practical diagnostic tool that enables project partners to evaluate the performance upfront progressively and objectively in each project lifecycle phase, which may inform timely corrective actions.
Originality/value
The study’s novelty lies in developing a framework that identifies and demonstrates the dynamic linkages among different sets of best practices, typical outputs and best practice indicators across the IC project lifecycle phases.
Details
Keywords
Lars Stehn and Alexander Jimenez
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…
Abstract
Purpose
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.
Design/methodology/approach
Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.
Findings
According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.
Originality/value
Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.
Details
Keywords
Ibrahim Yahaya Wuni and Geoffrey Qiping Shen
Prefabricated prefinished volumetric construction (PPVC) projects are industrialized building systems that are co-created. Thus, effective management of the involved stakeholders…
Abstract
Purpose
Prefabricated prefinished volumetric construction (PPVC) projects are industrialized building systems that are co-created. Thus, effective management of the involved stakeholders is required to ensure project success. However, knowledge of how best to manage the diverse stakeholders in PPVC projects is limited. This research identified and prioritized the success factors or key result areas (KRAs) for the effective stakeholder management (SM) in PPVC projects.
Design/methodology/approach
A quantitative research design was implemented involving a literature review and structured questionnaire survey with international PPVC experts. The research identified and statistically analysed 12 KRAs for SM in PPVC projects.
Findings
Analysis showed that the top three KRAs for SM in PPVC projects include: effective working collaboration, communication and information sharing among participants; effective coordination of the PPVC supply chain segments; and early involvement of relevant stakeholders in the PPVC project. A factor analysis clustered the 12 KRAs into stakeholder analysis and early involvement, effective communication and information sharing and stakeholder interest integration and conflict management.
Practical implications
The paper identified and prioritized the KRAs required for the effective SM in PPVC projects. To practitioners, the results may serve as decision support on the key areas to focus to ensure effective SM in PPVC projects and may guide the efficient allocation of limited resources.
Originality/value
This research constitutes the first exclusive attempt at identifying and benchmarking the generic KRAs required for effective SM in PPVC projects and contributes to the SM body of knowledge in industrialized construction.
Details
Keywords
Sherif Mostafa, Nicholas Chileshe and Tariq Abdelhamid
The purpose of this study is to systematically analyse and synthesise the existing research published on offsite manufacturing/construction. The study aims to highlight and…
Abstract
Purpose
The purpose of this study is to systematically analyse and synthesise the existing research published on offsite manufacturing/construction. The study aims to highlight and associate the core elements for adopting the offsite concept in different construction contexts. This ultimately facilitates the enhancement of the offsite uptake.
Design/methodology/approach
The research study was carried out through a systematic literature review (SLR). The SLR was conducted to identify and understand the existing themes in the offsite research landscape, evaluate contributions and compile knowledge, thereby identifying potential directions of future research. The grand electronic databases were explored to gather literature on the offsite concept, lean and agile principles and simulation. A total of 62 related articles published between 1992 and 2015 have been included in this study. The relevant literature was systematically analysed and synthesised to present the emerging offsite themes.
Findings
The descriptive and thematic analyses presented in this paper have identified related offsite research studies that have contributed to setting a firm foundation of the offsite concept in different construction contexts. Each of the 62 articles was examined for achieving the aim and objectives of this study, the method of data collection and coverage of offsite themes. The results of the analyses revealed that the articles mostly provide information on the offsite concept and its definitions (53 per cent) and offsite barriers and/or drivers (27 per cent). However, limited attention has been paid to the integration of lean and agile principles (13 per cent) and simulation (7 per cent) within the offsite concept, which are therefore more open to research within the offsite concept.
Research limitations/implications
The literature review highlights the main themes and components of the offsite construction concept. This forms a solid basis and motivation for researchers and practitioners to build on to enhance the uptake of the offsite concept in different contexts. This study also presents a research roadmap within the offsite concept, along with a recommendation for further research to be conducted using the research framework proposed in this study. The framework could lead to validation of using simulation to integrate lean and agile principles within the offsite concept.
Originality/value
This paper presents a systematic review of the literature related to offsite construction in different contexts. The emerging components, that is, offsite definitions, drivers and/or barriers, lean and agile principles and simulation have been highlighted and discussed thematically. A research framework that enables pursuit of the integration of lean and agile principles offsite through the lens of simulation has been proposed. The framework is expected to open up new opportunities on the effectiveness of offsite development in different contexts.
Details
Keywords
Much has been written in criticism of the social, planning and constructional aspects of many industrial buildings of the 1960s. Government departments have been accused of…
Abstract
Much has been written in criticism of the social, planning and constructional aspects of many industrial buildings of the 1960s. Government departments have been accused of promoting buildings systems and forms of contract that were bound to lead to problems. However, high rise industrialised building systems have been with us since the last century. Why have so many relatively recent examples gone wrong; what can be done with them; and how do we avoid the pitfalls in the future, while taking advantage of industrialised techniques?
Ali Rashidi, Wei Yin Yong, Duncan Maxwell and Yihai Fang
The construction industry has actively attempted to tackle the low-productivity issues arising from inefficient construction planning. It is imperative to understand how…
Abstract
Purpose
The construction industry has actively attempted to tackle the low-productivity issues arising from inefficient construction planning. It is imperative to understand how construction practitioners perceive technology integration in construction planning in light of emerging technologies. This study intended to uncover unique experimental findings by integrating 4D-building information modelling (BIM) to virtual reality (VR) technology during construction planning among construction professionals at light steel framing (LSF) projects.
Design/methodology/approach
The building industry participants were invited to provide inputs on two different construction planning methods: conventional and innovative methods. The conventional method involved the participants using traditional platforms such as 2D computer-aided design (CAD) and physical visualisation of paper-based construction drawings for the LSF assembly process with a Gantt Chart tool to complete construction planning-related tasks for the targeted project. Comparatively, participants are required to perform the same tasks using more innovative platforms like 4D-BIM in a VR environment.
Findings
A Charrette Test Method was used to validate the findings, highlighting an improvement in usability (+10.3%), accuracy (+89.1%) and speed (+30%) using 4D BIM with VR compared to the conventional paper-based method. The findings are also validated by a paired t-test, which is supported by the rationality of the same findings. This study posits positive results for construction planning through the utilisation of modern practices and technologies. These findings are significant for the global construction industry facing low productivity issues, delays and certainty in terms of building delivery timelines due to poor construction planning.
Originality/value
This new blend of technologies—combining 4D BIM and VR in industrialised construction projects—potentially directs future initiatives to drive the efficiency of construction planning in the building lifecycle. The interactive BIM-based virtual environment would purposefully transform construction planning practices in order to deliver modern and more certain building construction methods with a focus on prefabrication processes.
Details
Keywords
Duncan Maxwell and Rachel Couper
Construction suffers from “peculiarities” that concern the temporary natures of the construction site, project teams and unique product design. Considering the digital…
Abstract
Purpose
Construction suffers from “peculiarities” that concern the temporary natures of the construction site, project teams and unique product design. Considering the digital transformation of construction, new solutions are being investigated that can provide consistent data between changing projects. One such source of data manifests in the tracking of logistics activities across the supply chain. Construction logistics is traditionally considered a site management activity focused solely on the “back end” of projects, but an expanded logistics focus can unlock new avenues of improvement. This study aims to understand the requirements and benefits of such a consistent thread of data.
Design/methodology/approach
From a research project with one of Australia’s largest contracting companies, this paper details a series of construction tracking tests as an empirical case study in using Bluetooth low energy aware tracking technology to capture data across the manufacture, delivery and assembly of a cross-laminated timber structural prototyping project.
Findings
The findings affirm the tracking of expanded logistics data can improve back-end performance in subsequent projects while also demonstrating the opportunity to inform a project’s unique front-end design phase. The case study demonstrates that as the reliability, range and battery life of tracking technologies improve, their incorporation into a broader range of construction activities provides invaluable data for improvement across projects.
Originality/value
As a live case study, this research offers unique insights into the potential of construction tracking to close the data loop from final site assembly back to the early project design phase, thus driving continual improvement from a holistic perspective.
Jerker Lessing, Lars Stehn and Anders Ekholm
– This article aims to describe the development of industrialised house-building (IHB) to increase the understanding of the field.
Abstract
Purpose
This article aims to describe the development of industrialised house-building (IHB) to increase the understanding of the field.
Design/methodology/approach
The study is based on an extensive literature study and a case study with three companies, studied between 2005 and 2013 which enabled an in-depth knowledge about the companies’ development within IHB. Interviews, observations and document studies are the main sources of information in the case studies.
Findings
IHB is a complex field, consisting of several constructs that need to be integrated and continuously developed. Development of structured technical building systems has been central to the development of IHB along with developed production methods and processes. The interest in organisational fit or adaptation to industrialisation and strategy concerning business, production and products is increasing. This implies that IHB needs to be managed strategically and not on a building project level.
Practical implications
The article gives an orientation on how leading companies have structured and organised their work within industrialisation, giving valuable advice to practitioners with interest in the field.
Originality/value
This article describes the development of IHB based on studies of literature and three Swedish IHB companies’ development. This provides an aggregated view of the field’s emergence and unique information about the studied companies’ development.
Details