Search results
1 – 10 of 63Lars Stehn and Alexander Jimenez
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…
Abstract
Purpose
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.
Design/methodology/approach
Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.
Findings
According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.
Originality/value
Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.
Details
Keywords
Wolfgang Grenzfurtner and Manfred Gronalt
A deeper understanding of what needs to be considered to improve the targeted incorporation of employees’ knowledge into continuous improvement (CI) programmes in industrialised…
Abstract
Purpose
A deeper understanding of what needs to be considered to improve the targeted incorporation of employees’ knowledge into continuous improvement (CI) programmes in industrialised housebuilding (IHB) is required. This paper aims to address the current lack of involvement and connect it to structural and corporate culture factors. To avoid misjudgements in improvement activities as well as to use the full potential of performance improvement ideas, CI tools and measures need to be adapted to facilitate this integration. Relevant factors are analysed and their influences on CI measures are assessed.
Design/methodology/approach
The research approach is built upon an explorative case study supported by a comprehensive literature review. Empirical data were collected through participant observation, guided interviews and company documents.
Findings
The influences on employee involvement within CI programmes and the corresponding suitability of important CI measures were evaluated on a set of relevant factors. These factors include unique building projects, project-based focus on order fulfilment, fragmented order fulfilment process, separation of order fulfilment activities in terms of space and time, procedural rules for dealing with on-site failures, short-term contracts with subcontractors and the practice of evaluating and monitoring performance on site.
Research limitations/implications
The research paves the way for the development of suitable tools, measures and methods to effectively involve employees from all profession within a CI programme in IHB. The empirical part of this research is based on a single case study.
Originality/value
This work extends the body of knowledge of CI application in the construction industry with an analysis of factors influencing its implementation and management.
Details
Keywords
Wolfgang Grenzfurtner and Manfred Gronalt
This paper aims to identify those factors, which will improve the collaboration between industrialised housebuilding (IHB) companies and their subcontractors within continuous…
Abstract
Purpose
This paper aims to identify those factors, which will improve the collaboration between industrialised housebuilding (IHB) companies and their subcontractors within continuous improvement (CI) programmes. These factors will enhance the supply chain (SC) efficiency and productivity, eliminating obstacles when designing, implementing and managing CI programmes within IHB SC.
Design/methodology/approach
An explorative case study with a mixed-method approach was conducted within an IHB SC. To collect data, participant observation and guided interviews were applied. A stakeholder analysis was conducted to structure their guiding principles. A causal loop diagram (CLD) analysis was used to model the effects on and relationships within a SC and their impact on the involvement of subcontractors.
Findings
The influences on the stakeholders and the guidelines under which they work are defined. Potential conflicts of interest between stakeholders are identified. A CLD is used to model a better understanding of system behaviour impacting on the relationships within the SC and on subcontractor involvement. The results provide a number of factors that need to be considered when designing, implementing and managing a CI programme.
Research limitations/implications
The research suggests better ways to use subcontractors’ specific knowledge of on-site processes such that productivity and efficiency are enhanced. Improvements within the construction supply chain (CSC) will, in the future, not be limited to small improvement gains at company level.
Originality/value
This paper extends the body of knowledge in CSC management by revealing factors important for designing, implementing and managing CI programmes, which enables the successful involvement of subcontractors in CI on SC level.
Details
Keywords
Rehan Masood, Krishanu Roy, Vicente A. González, James B.P. Lim and Abdur Rehman Nasir
Globally, prefabrication in housebuilding has evolved as an innovative approach to attain sustainability and affordability. However, the SC, including non-producers and producers…
Abstract
Purpose
Globally, prefabrication in housebuilding has evolved as an innovative approach to attain sustainability and affordability. However, the SC, including non-producers and producers, of prefabricated housebuilding projects is still not perceptually aligned, hindering innovation diffusion. This paper investigates the contemporary industry perspective on PHB for conceptualisation, market share and growth, innovation diffusion and the producer's role in the context of New Zealand.
Design/methodology/approach
An exploratory qualitative research design was chosen to learn the perceptual stance of the industry. A semi-structured survey was conducted, followed by interviews with selected supply chain participants, who were producers and non-producers and had relevant experience in the PHB industry.
Findings
This study reports the common terminologies used by supply chain members, with justification and explanation. Further, the perceived market share and growth of the PHB industry are obtained and compared with subsequent studies to determine the capability and capacity. The perception of the diffusion of PHB by type is reported to portray the overall trend of the industry. In the last, the role of producers as the suppliers of PHB projects is investigated to establish the stakeholder positional criticality.
Practical implications
This study can help researchers and practitioners gain insight into the PHB industry from a multi-dimensional perspective. This study is a potential first step to formalise the policy, programme, strategies and action plan for the uptake of the PHB in the New Zealand.
Originality/value
PHB diffusion in the supply chain perspective, considering multi-dimensional aspects, has not been considered in previous studies as government agencies produce most of the literature. This academic research establishes the theoretical linkage towards PHB diffusion and reports the current status.
Details
Keywords
Lars Stehn, Susanne Engström, Petri Uusitalo and Rita Lavikka
To further the understanding of industrialised house building (IHB) from a temporal, emergent corporate-ability perspective, this study aims to trace the build-up of corporate…
Abstract
Purpose
To further the understanding of industrialised house building (IHB) from a temporal, emergent corporate-ability perspective, this study aims to trace the build-up of corporate assets in an IHB company over time. The research draws on dynamic capabilities, acknowledging not only what assets the company have developed and currently are exploiting, but also how these assets were develop and managed (i.e. enhanced, combined, protected and potentially reconfigured) to sustain long-term competitiveness.
Design/methodology/approach
A case study design was used to form a narrative that covers the evolution of an IHB company over a 25-year period. Corporate archival material, analysis of original data from a large number of research studies during 1993-2013 and retrospective reflections of owners and managers, including crosschecking interpretations of archival material, developed and triangulated the narrative.
Findings
The study presents rich empirical findings on the build-up of corporate assets. Starting from a successive process of exploration and exploitation formation of dynamic capabilities eventually played out into an exponential dynamic capability build-up. The IHB case company displays the ability to not only continuously exploit and renew resources and competences, but also to sense, seize and reconfigure cumulative assets over time. The exponential development of dynamic capabilities resonates to literature on higher-order dynamic capabilities implying that: the accumulated and higher-order dynamic capabilities are difficult to imitate and a (any) company must possess higher-order dynamic capabilities to be able to exploit and/or take up IHB.
Originality/value
The study is complementing and potentially challenging frequent framings of the IHB concept. Previous research has addressed and characterised IHB mainly by encapsulating a moment in time and, thus, characteristics are momentary and represent static views on IHB. However, IHB has seen a strong development over the past 25 years, and the study reflects on this development from the perspective of one of the IHB-forerunner companies in Sweden. By exploring from a company perspective the developments, reconfiguration and capacity to develop/reconfigure over time in a changing environment, the study introduces an alternative understanding of IHB as dynamic capabilities.
Details
Keywords
Jerker Lessing, Lars Stehn and Anders Ekholm
– This article aims to describe the development of industrialised house-building (IHB) to increase the understanding of the field.
Abstract
Purpose
This article aims to describe the development of industrialised house-building (IHB) to increase the understanding of the field.
Design/methodology/approach
The study is based on an extensive literature study and a case study with three companies, studied between 2005 and 2013 which enabled an in-depth knowledge about the companies’ development within IHB. Interviews, observations and document studies are the main sources of information in the case studies.
Findings
IHB is a complex field, consisting of several constructs that need to be integrated and continuously developed. Development of structured technical building systems has been central to the development of IHB along with developed production methods and processes. The interest in organisational fit or adaptation to industrialisation and strategy concerning business, production and products is increasing. This implies that IHB needs to be managed strategically and not on a building project level.
Practical implications
The article gives an orientation on how leading companies have structured and organised their work within industrialisation, giving valuable advice to practitioners with interest in the field.
Originality/value
This article describes the development of IHB based on studies of literature and three Swedish IHB companies’ development. This provides an aggregated view of the field’s emergence and unique information about the studied companies’ development.
Details
Keywords
Mohammed Arif, Jack Goulding, Jeff Rankin and Farzad Pour Rahimian
Rita Lavikka, Krishna Chauhan, Antti Peltokorpi and Olli Seppänen
Systemic innovations emerge and create value in an inter-organisational context. However, innovation studies rarely investigate the role of value creation and value capture among…
Abstract
Purpose
Systemic innovations emerge and create value in an inter-organisational context. However, innovation studies rarely investigate the role of value creation and value capture among multiple organisations in successful innovation implementation. This paper aims to understand the role of value creation and value capture in the implementation of systemic innovations in construction which is by nature, an inter-organisational context.
Design/methodology/approach
The empirical research focused on the barriers, enablers and opportunities for value creation and value capture of the Finnish construction project parties when trying to implement mechanical, electrical and plumbing (MEP) prefabrication, which is a systemic innovation. Data were collected through interviews, observations and action workshops.
Findings
The empirical study identified interaction patterns on how social, political, technical and economic barriers lead to uneven value capturing, lack of value-based procurement and unclear value creation between MEP design and installation. They hinder the implementation of MEP prefabrication. The results point to enablers leading to fairly shared value to all parties, procurement of value and collaborative value creation, thus increasing the usage of MEP prefabrication, a systemic innovation.
Originality/value
The study adds new knowledge by demonstrating that the identification of barriers and their interaction with enablers and opportunities for value creation and capture lay a baseline for suggestions on how to implement a systemic innovation. This study stresses the importance of enabling value creation and capture for all construction project parties when implementing a systemic innovation.
Details
Keywords
Sushilawati Ismail, Carol K.H. Hon, Philip Crowther, Martin Skitmore and Fiona Lamari
Malaysia’s industrialised building system (IBS) has been increasingly adopted for sustainable development by the country’s construction industry. However, although it has been…
Abstract
Purpose
Malaysia’s industrialised building system (IBS) has been increasingly adopted for sustainable development by the country’s construction industry. However, although it has been used for commercial building projects, its application to sustainable infrastructure development has been limited to date. This study aims to examine the drivers and challenges involved.
Design/methodology/approach
A preliminary conceptual framework was initially developed based on a systematic literature review. Semi-structured interviews involving 20 participants were undertaken to gain insightful thoughts from the construction practitioners to discover the perception towards IBS application in the construction industry, the applicability of IBS, particularly in infrastructure projects, the strategies of IBS delivery and the sustainable potential of its application. A two-round Delphi study was conducted with 15 experienced and knowledgeable panellists to further identify, verify and prioritise factors developed from the literature review and interview findings. Then, the results were synthesised and triangulated to demonstrate a holistic insight.
Findings
The results show the main drivers to be better productivity, quality, environmental, safety and health, constructability design and cost, policy and requirements, with the main challenges being project planning and cost-related issues, inexperience and industry capacity.
Originality/value
The study’s main contribution is in systematically determining the practical implications involved in applying the IBS to sustainable infrastructure developments in Malaysia and other similar developing countries.
Details
Keywords
Guiwen Liu, Juma Hamisi Nzige and Kaijian Li
The purpose of this study is to discover the distribution and trends of existing Offsite construction (OSC) literature with an intention to highlight research niches and propose…
Abstract
Purpose
The purpose of this study is to discover the distribution and trends of existing Offsite construction (OSC) literature with an intention to highlight research niches and propose the future outline.
Design/methodology/approach
The paper adopted literature reviews methodology involving 1,057 relevant documents published in 2008-2017 from 15 journals. The selected documents were empirically analyzed through a topic-modeling technique. A latent Dirichlet allocation model was applied to each document to infer 50 key topics. A machine learning for language toolkit was used to get topic posterior word distribution and word composition.
Findings
This is an exploratory study, which identifies the distribution of topics and themes; the trend of topics and themes; journal distribution trends; and comparative topic, themes and journal distribution trend. The distribution and trends show an increase in researcher’s interest and the journal’s priority on OSC research. Nevertheless, OSC existing literature is faced with; under-researched topics such as building information modeling, smart construction and marketing. The under-researched themes include organizational management, supply chain and context. The authors also found an overload of similar information in prefabrication and concrete topics. Furthermore, the innovative methods and constraints themes were found to be overloaded with similar information.
Research limitations/implications
The naming of the themes was based on our own interpretation; hence, the research results may lack generalizability. Therefore, a comparative study using different data processing is proposed. The study also provides future research outline as follows: studying OSC topics from dynamic evolution perspective and identifying the new emerging topics; searching for effective strategies to enhance OSC research; identifying the contribution of countries, affiliation and funding agency; and studying the impact of these themes to the adoption of OSC.
Practical implications
This study is of values to the scholars, as it could stimulate research to under-researched areas.
Originality/value
This paper justifies a need to have a broad understanding of the nature and structure of existing OSC literature.
Details