Search results

1 – 10 of over 57000
Article
Publication date: 12 May 2020

Laura Saukko, Kirsi Aaltonen and Harri Haapasalo

The purpose of this paper is to achieve an understanding of the challenges and preconditions for inter-organizational collaborative project practices in industrial engineering

1076

Abstract

Purpose

The purpose of this paper is to achieve an understanding of the challenges and preconditions for inter-organizational collaborative project practices in industrial engineering projects. A framework for identifying the challenges and preconditions for inter-organizational collaboration is presented.

Design/methodology/approach

The adopted research method is qualitative, and empirical data were collected from the industrial engineering project sector in Finland. The literature related to industrial engineering projects and inter-organizational collaborative project management practices is summarized, informing the qualitative design of the study.

Findings

By analyzing empirical data from industrial engineering projects, the challenges for inter-organizational collaboration are identified in each industrial engineering project stage. A framework of preconditions for inter-organizational collaboration is identified, in which investors are advised to pay attention when deciding on the use of collaborative project management methods.

Practical implications

The findings of this study help practitioners deal effectively with mechanisms aimed at fostering and hindering inter-organizational collaborative practices. The identified preconditions for inter-organizational collaboration provide support for decision-making in every phase of an engineering project and can be used as guidelines throughout the process.

Originality/value

Inter-organizational collaborative project management practices have recently been attracting attention in the industrial engineering project setting. This research is an attempt to identify the underlying forces supporting and preventing inter-organizational collaboration in industrial engineering projects. This study offers a framework that can help academics and project management practitioners deal with the challenges affecting inter-organizational collaboration at each project stage and consider preconditions for inter-organizational collaboration in industrial engineering project settings.

Details

International Journal of Managing Projects in Business, vol. 13 no. 5
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 1 February 1984

Eric G. Flamholtz and George Geis

This article builds on and extends previous research in the area of Human Resource Accounting (HRA). Its purpose is to present a study involving the development and application of…

Abstract

This article builds on and extends previous research in the area of Human Resource Accounting (HRA). Its purpose is to present a study involving the development and application of a model for measuring the replacement cost of people. Specifically, the study involved the development and application of a human resource replacement cost model for Industrial Engineers in the US Navy.

Details

Personnel Review, vol. 13 no. 2
Type: Research Article
ISSN: 0048-3486

Article
Publication date: 2 July 2020

Vahid Rooholelm and Abbas Sheikh Aboumasoudi

Almost all projects in the world are delayed, and sometimes even lead to the full bankruptcy of their beneficiaries. These delays can be calculated using techniques, but most…

Abstract

Purpose

Almost all projects in the world are delayed, and sometimes even lead to the full bankruptcy of their beneficiaries. These delays can be calculated using techniques, but most importantly, there must be a fair and realistic division of delays between project beneficiaries. The most valid delay calculation techniques belong to the SCL Global Protocol, but they also have significant drawbacks, such as these: (1) They do not have the capability to prevent project delays (Delay Risk Management); (2) The protocol identifies and introduces any delays in activities with a ratio of one to one as a delay (Effective Delay); (3) It also does not offer the capability to share delays between stakeholders, which is a huge weakness. Floating in the base schedule activities is one of the cost control tools of projects, but it can hide project delays. In this paper, the researchers believe that the floating ownership belongs to the project and not belong to the stakeholders. This is the main tool for analyzing and sharing delays in this research.

Design/methodology/approach

The research methodology adopted included an extensive literature review, expert interviews, use of questionnaire and designing three innovative linked together models by researchers.

Findings

In this research, an integrated technique is introduced which has the following capabilities; delay risk control, result-based delay analysis and stakeholders delay sharing. This technique with an incursive and defensive approach implements claims management principles and calculates, respectively, non-attributable and attributable delays for each beneficiary.

Originality/value

This creativity led to the introduction of the Incursive and Defensive (In-De) technique; in the SCL protocol techniques, none of these capabilities exist.

Details

International Journal of Managing Projects in Business, vol. 13 no. 6
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 8 December 2022

Rajenlall Siriram

The objective of this research is to explore integration and transition activities in large industrial projects. The purpose is to (a) obtain a better understanding of the…

1702

Abstract

Purpose

The objective of this research is to explore integration and transition activities in large industrial projects. The purpose is to (a) obtain a better understanding of the integration and transition activities between the project front-end (FE) and project initiation phases (PIPs), (b) explore what, how and when these integrations and transitions occur, and (c) explore what the integration and transition activities mean to project practitioners.

Design/methodology/approach

A qualitative research design methodology is followed, based on interviews using open-ended questions. An expert panel is used to provide responses to questions pertaining to the integration and transition between the project FE and PIP. The research is focused on managing large projects in the South African electrical engineering industrial projects industry. A literature review combined with empirical analysis reflects the importance of integrating and transitioning in project business.

Findings

The findings provide guidance to researchers and practitioners on integration and transition mechanisms, how and when these occur. It highlights the benefits of integration and transition activities. Important lessons for researchers and practitioners are provided together with areas for future research.

Originality/value

This is an interpretative analysis of expert opinion. Expert panel members are experienced at senior decision-making level, and their expertise was accessed based on experience, education and knowledge. This extensive experience is shared in this paper providing insights into their opinions, experiences, success and failures. These inputs together with the literature review provide interesting implications for both a theoretical foundation as well as practical implications for practitioners.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 5 October 2020

Hao Qin, Hongwei Wang and Aylmer Johnson

This paper aims to explore the information needs and information-seeking behaviours of the new generation of engineering designers. A survey study is used to approach what their…

1293

Abstract

Purpose

This paper aims to explore the information needs and information-seeking behaviours of the new generation of engineering designers. A survey study is used to approach what their information needs are, how these needs change during an engineering design project and how their information-seeking behaviours have been influenced by the newly developed information technologies (ITs). Through an in-depth analysis of the survey results, the key functions have been identified for the next-generation management systems.

Design/methodology/approach

The paper first proposed four hypotheses on the information needs and information-seeking behaviours of young engineers. Then, a survey study was undertaken to understand their information usage in terms of the information needs and information-seeking behaviours during a complete engineering design process. Through analysing the survey results, several findings were obtained and on this basis, further comparisons were made to discuss and evaluate the hypotheses.

Findings

The paper has revealed that the engineering designers' information needs will evolve throughout the engineering design project; thus, they should be assisted at several different levels. Although they intend to search information and knowledge on know-what and know-how, what they really require is the know-why knowledge in order to help them complete design tasks. Also, the paper has shown how the newly developed ITs and web-based applications have influenced the engineers' information-seeking practices.

Research limitations/implications

The research subjects chosen in this study are engineering students in universities who, although not as experienced as engineers in companies, do go through a complete design process with the tasks similar to industrial scenarios. In addition, the focus of this study is to understand the information-seeking behaviours of a new generation of design engineers, so that the development of next-generation information and knowledge management systems can be well informed. In this sense, the results obtained do reveal some new knowledge about the information-seeking behaviours during a general design process.

Practical implications

This paper first identifies the information needs and information-seeking behaviours of the new generation of engineering designers. On this basis, the varied ways to meet these needs and behaviours are discussed and elaborated. This intends to provide the key characteristics for the development of the next-generation knowledge management system for engineering design projects.

Originality/value

This paper proposes a novel means of exploring the future engineers' information needs and information-seeking behaviours in a collaborative working environment. It also characterises the key features and functions for the next generation of knowledge management systems for engineering design.

Details

Aslib Journal of Information Management, vol. 72 no. 6
Type: Research Article
ISSN: 2050-3806

Keywords

Open Access
Article
Publication date: 18 April 2023

Tommi Pauna, Jere Lehtinen, Jaakko Kujala and Kirsi Aaltonen

The aim of this research was to understand how governmental stakeholder engagement facilitates the sustainability of industrial engineering (IE) projects. A model for governmental…

2117

Abstract

Purpose

The aim of this research was to understand how governmental stakeholder engagement facilitates the sustainability of industrial engineering (IE) projects. A model for governmental stakeholder engagement activities is presented.

Design/methodology/approach

The authors relied on a single-case study of a mining project in Northern Europe, where a novel collaboration and engagement approach with governmental stakeholders was piloted in the project's front-end phase. The analysis focused on the collaborative practices through which the IE project investor engaged governmental stakeholders during the project's front-end phase and how the engagement contributed to solving challenges in the early planning and permitting process and achieving project plans that balanced economic, social and environmental aspects.

Findings

The findings show how four collaborative engagement practices reduced uncertainty and equivocality related to the legal sustainability requirements, enabled the development of sustainable design solutions and overall accelerated the permitting process without compromising the quality of final project plans.

Practical implications

The findings can be used to plan governmental stakeholder engagement and understand related challenges that need to be overcome. The study highlights the need to develop established practices and guidelines for governmental stakeholder engagement.

Originality/value

This study complements prior research on stakeholder engagement and project sustainability by developing an understanding of how governmental stakeholder engagement can be a key mechanism enabling the sustainability of IE project's end product. This research contributes to stakeholder theory by elaborating on a new stakeholder role, intermediary stakeholder.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 28 November 2022

Ziyao Zhang, Guodong Ni, Han Lin, Zongbo Li and Zhipeng Zhou

This paper aims to investigate the relationships between empowering leadership, basic psychological needs satisfaction, work-related well-being, and project citizenship behavior.

1131

Abstract

Purpose

This paper aims to investigate the relationships between empowering leadership, basic psychological needs satisfaction, work-related well-being, and project citizenship behavior.

Design/methodology/approach

Drawing upon the self-determination theory (SDT), a conceptual model was developed and then empirically tested using a cross-sectional survey of 435 project members in Chinese construction projects.

Findings

The results fully support the research hypotheses proposed in the study, illustrating the positive impacts of empowering leadership on work-related well-being and project citizenship behavior, the mediating role of basic psychological needs satisfaction, and the positive association between work-related well-being and project citizenship behavior.

Practical implications

This research determines the utility of empowering leadership in the context of construction projects, especially in enhancing individual outcomes (i.e. work-related well-being and project citizenship behavior). Therefore, construction project managers can apply empowering leadership to meet the basic psychological needs of subordinates to increase project members' work-related well-being and project citizenship behavior.

Originality/value

To our knowledge, the present study first explores the micro-level impacts of empowering leadership in the construction context. Additionally, this study enriches the understanding of the mediating mechanism between empowering leadership and individual outcomes from a self-determination perspective.

Details

International Journal of Managing Projects in Business, vol. 16 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 28 September 2020

Martin Hrabal, David Tuček, Vieroslav Molnár and Gabriel Fedorko

The study proposes competence models for the roles of process owners, process analysts and industrial engineers based on qualitative research.

1523

Abstract

Purpose

The study proposes competence models for the roles of process owners, process analysts and industrial engineers based on qualitative research.

Design/methodology/approach

The research methodology is a combination of a questionnaire survey and interviewing in Czech companies, which develop the process approach. The proposed competence models can be utilized during business process management (BPM) implementation while appointing process owners, analysts and industrial engineers and their further development.

Findings

This paper emphasizes the role of human factor and presents research results concerning most important BPM roles and their competencies.

Research limitations/implications

There is lack of research (a research gap) in the field of BPM roles, what they do and what they should do.

Practical implications

A system of competence models is thus a tool for human resource management and should increase the success rate of BPM projects. Another possible utilization is in higher education in business administration.

Social implications

Another possible utilization is in higher education in business administration.

Originality/value

It proposes competence models for the roles of process owners, process analysts and industrial engineers based on qualitative research.

Details

Business Process Management Journal, vol. 27 no. 1
Type: Research Article
ISSN: 1463-7154

Keywords

Open Access
Article
Publication date: 31 May 2022

Laura Saukko, Kirsi Aaltonen and Harri Haapasalo

The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.

2076

Abstract

Purpose

The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.

Design/methodology/approach

A theoretical construct of, referred in this study as integration capability framework is elaborated following a systematic literature review. Thereafter, an integration capability self-assessment model, based on maturity thinking, is derived from the theoretical framework. The self-assessment model is further developed and tested for validity within five inter-organizational project networks in cooperation with industry practitioners, representing construction, industrial engineering, and mining sectors.

Findings

The results show that inter-organizational projects can use the developed model in self-assessing the maturity levels of various integration mechanisms, thus the state of integration capability at any point in time during inter-organizational projects.

Originality/value

This study is an attempt to identify how the integration capability dimensions can be self-assessed in inter-organizational projects, through the maturity levels of various integration mechanisms. The results offer insights for both academics and project management practitioners.

Details

International Journal of Managing Projects in Business, vol. 15 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 1 August 1976

RECENTLY we were at a garage. A customer had, during the night, left his car for repair. The instructions were stuck on the windscreen and repeated on the wing: REPLACE NEARSIDE…

Abstract

RECENTLY we were at a garage. A customer had, during the night, left his car for repair. The instructions were stuck on the windscreen and repeated on the wing: REPLACE NEARSIDE WING ONLY.

Details

Work Study, vol. 25 no. 8
Type: Research Article
ISSN: 0043-8022

1 – 10 of over 57000