Search results

1 – 10 of over 10000
Article
Publication date: 12 August 2022

Sumit Shandilya, Jaskiran Arora and Vinayak Kalluri

Continued quest for business improvement in terms of enhanced productivity and cost cuts is the most valued strategic function in an organization. Towards this endeavor, there…

Abstract

Purpose

Continued quest for business improvement in terms of enhanced productivity and cost cuts is the most valued strategic function in an organization. Towards this endeavor, there have been evolutions of many problem-solving techniques like Lean, quality control (QC) tools, Six Sigma, total productive maintenance (TPM), etc. This paper introduces a different problem-solving methodology for quality improvement – prepare, measure, define, establish, control and stabilize (PMDECS) approach of Red Bin Analysis (RBA) – and presents empirical evidence of its effectiveness in eliminating the defectives at source (parts per million [PPM]) and improving the process capability (Cp).

Design/Methodology/Approach

An attempt has been made to compare RBA with the Six Sigma methodology in terms of number of defects, defectives, process capabilities, project duration, etc. Data validation with more than 2000 data points was conducted based on empirical data collected over multiple problem-solving projects conducted in six manufacturing industries of India to compare the effectiveness of both the methods. Finally, fuzzy AHP (analytical hierarchy process) model was proposed to identify the Quality Improvement Index for both the methods to address the manager’s dilemma in selecting an appropriate problem-solving method.

Findings

The paper provides empirical insights in establishing that the PMDECS approach of RBA is at par and sometimes better for problem-solving if the problem is not chronic and is at the initial stages, it requires less duration than Six Sigma projects and except casting process and it can yield better results in case of PPM rejection or Cp/Cpk improvement in other processes.

Research limitations/implications

Because of the chosen research approach, the research results may lack generalizability. This research has been specifically conducted in automotive manufacturing industries. Therefore, researchers are encouraged to test the proposed propositions further.

Practical implications

The paper includes implications for the usage of alternative problem-solving methods, like PMDECS approach of RBA.

Originality/value

This paper intends to compare how the results of six sigma projects in manufacturing industries are effective against a different methodology, PMDECS approach of RBA.

Details

The TQM Journal, vol. 35 no. 7
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 3 August 2023

Innocent Chigozie Osuizugbo, Omotayo Olugbenga Aina and Anthony Ogochukwu Onokwai

Construction industry is a vital sector for national and economic development of any country. Past studies reveal that the Nigerian construction industry is suffering from…

Abstract

Purpose

Construction industry is a vital sector for national and economic development of any country. Past studies reveal that the Nigerian construction industry is suffering from buildability problems. Buildability improvement is the duty of every key stakeholder, including designers, builders and clients. This study sets out to determine the principal roles of clients in buildability improvement in Nigerian construction projects.

Design/methodology/approach

A questionnaire survey was adopted to evaluate construction industry professionals’ views on the roles of clients in buildability improvement in Nigeria. Eighty-one questionnaires were sufficiently filled and returned, representing a return percentage of 76% which formed the basis of this study. Data elicited were analysed using descriptive and inferential statistics.

Findings

The results from factors analysis show that the roles of clients in buildability improvement can be categorised into two constructs: commitment to buildability assessment and other related practices, and adequate planning of project objectives.

Originality/value

This study contributed to more effective buildability studies by highlighting the roles of clients in buildability improvement in the construction industry. An understanding of these roles is very significant for minimising buildability problems as well as for improving and embedding buildability as a practice in the construction industry.

Details

Built Environment Project and Asset Management, vol. 13 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 13 February 2024

Jennifer Ford, David B. Isaacks and Timothy Anderson

This study demonstrates how becoming a high-reliability institution in health care is a priority, given the high-risk environment in which an error can result in harm. Literature…

Abstract

Purpose

This study demonstrates how becoming a high-reliability institution in health care is a priority, given the high-risk environment in which an error can result in harm. Literature conceptually supports the need for highly reliable health care facilities but does not show a comprehensive approach to operationalizing the concept into the daily workforce to support patients. The Veterans Health Administration closes the gap by documenting a case study that not only demonstrates specific actions and functions that create a high-reliability organization (HRO) for safety and improvement but also created a learning organization by spreading the knowledge to other facilities.

Design/methodology/approach

The authors instituted a methodology consisting of assessments, training and educational simulations to measure, establish and operationalize activities that identified and prevented harmful events. Visual communication boards were created to facilitate team huddles and discuss improvement ideas. Improvements were then measured and analyzed for purposeful outcomes and return on investment (ROI).

Findings

HRO can be operationalized successfully in health care systems. Measurable outcomes verified that psychological safety was achieved through the identification and participation of 3,184 process improvement projects over a five-year period, which yielded a US$2.8m ROI. Documented processes and activities were used for educational teachings, which were disseminated to other Veteran Affairs Medical Center’s through the Truman HRO Academy.

Practical implications

This case study is limited to one hospital in the Veterans Health Administration (VHA) network. As the VHA continues to deploy the methods outlined to other hospitals, the authors will perform incremental data collection and ongoing analysis for further validation of the HRO methods and operations. Hospitalists can adapt the methods in the case study for practical application in a health care setting outside of VHA. Although the model is rooted in health care, the methods may be adapted for use in other industries.

Originality/value

This case study overcomes the limitations within literature regarding operationalizing HRO by providing actual activities and demonstrations that can be implemented by other health care facilities.

Details

The Learning Organization, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-6474

Keywords

Open Access
Article
Publication date: 24 October 2023

Mary Margaret Crowdle, Olivia McDermott and Anna Trubetskaya

This study aimed to bridge the gap between the financial measurement of process improvement ideas and Lean Six Sigma measurements. It was required to increase employee engagement…

Abstract

Purpose

This study aimed to bridge the gap between the financial measurement of process improvement ideas and Lean Six Sigma measurements. It was required to increase employee engagement in process improvement initiatives.

Design/methodology/approach

Through both a practical and theoretical application of the Design for Lean Six Sigma methodology, the researcher was able to design a process and a benefit measuring methodology that was acceptable by finance and aligns with the benefits expected from the elimination of the Lean wastes.

Findings

The project found that benefit measurement methodology is not understood by most employees, which leads to a lack of engagement in working on improvements. The result of the study was a model for employees to identify and quantify these benefits. This has resulted in a model for cost-benefit analysis aligning financial costs with non-value add waste costs and cost of poor-quality costs resulting in increased process improvement ideas and activity.

Research limitations/implications

While this study was limited to one company, applying this methodology could benefit any company experiencing the same difficulties.

Originality/value

This is one of the first studies to try and cost the benefits of LSS projects both from an organisational and generic viewpoint.

Details

The TQM Journal, vol. 35 no. 9
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 23 October 2023

Mariam Bader, Jiju Antony, Raja Jayaraman, Vikas Swarnakar, Ravindra S. Goonetilleke, Maher Maalouf, Jose Arturo Garza-Reyes and Kevin Linderman

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six…

Abstract

Purpose

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six Sigma and Agile. Proposing a mitigation framework accordingly is also an aim of this study.

Design/methodology/approach

This research undertakes a systematic literature review of 49 papers that were relevant to the scope of the study and that were published in four prominent databases, including Google Scholar, Scopus, Web of Science and EBSCO.

Findings

Further analysis identifies 39 factors that contribute to the failure of PI projects. Among these factors, significant emphasis is placed on issues such as “resistance to cultural change,” “insufficient support from top management,” “inadequate training and education,” “poor communication” and “lack of resources,” as primary causes of PI project failures. To address and overcome the PI project failures, the authors propose a framework for failure mitigation based on change management models. The authors present future research directions that aim to enhance both the theoretical understanding and practical aspects of PI project failures.

Practical implications

Through this study, researchers and project managers can benefit from well-structured guidelines and invaluable insights that will help them identify and address potential failures, leading to successful implementation and sustainable improvements within organizations.

Originality/value

To the best of the author’s knowledge, this paper is the first study of its kind to examine the CFFs of five PI methodologies and introduces a novel approach derived from change management theory as a solution to minimize the risk associated with PI failure.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 23 March 2023

Haftu Hailu Berhe, Hailekiros Sibhato Gebremichael and Kinfe Tsegay Beyene

Existing conceptual, empirical and case studies evidence suggests that manufacturing industries find the joint implementation of Kaizen philosophy initiatives. However, the…

Abstract

Purpose

Existing conceptual, empirical and case studies evidence suggests that manufacturing industries find the joint implementation of Kaizen philosophy initiatives. However, the existing practices rarely demonstrated in a single framework and implementation procedure in a structure nature. This paper, therefore, aims to develop, validate and practically test a framework and implementation procedure for the implementation of integrated Kaizen in manufacturing industries to attain long-term improvement of operational, innovation, business (financial and marketing) processes, performance and competitiveness.

Design/methodology/approach

The study primarily described the problem, extensively reviewed the current state-of-the-art literature and then identified a gap. Based on it, generic and comprehensive integrated framework and implementation procedure is developed. Besides, the study used managers, consultants and academics from various fields to validate a framework and implementation procedure for addressing business concerns. In this case, the primary data was collected through self-administered questionnaire, and 244 valid questionnaires were received and were analyzed. Furthermore, the research verified the practicability of the framework by empirically exploring the current scenario of selected manufacturing companies.

Findings

The research discovered innovative framework and six-phase implementation procedure to fill the existing conceptual gap. Furthermore, the survey-based and exploratory empirical analysis of the research demonstrated that the practice of the proposed framework based on structured procedure is valued and companies attain the middling improvements of productivity, delivery time, quality, 5S practice, waste and accident rate by 61.03, 44, 52.53, 95.19, 80.12, and 70.55% respectively. Additionally, the companies saved a total of 14933446 ETH Birr and 5,658 M2 free spaces. Even though, the practices and improvements vary from company to company, and even companies unable to practice some of the unique techniques of the identified CI initiatives considered in the proposed framework.

Research limitations/implications

All data collected in the survey came from professionals working for Ethiopian manufacturing companies, universities and government. It is important to highlight that n = 244 is high sample size, which is adequate for a preliminary survey but reinforcing still needs further survey in terms of generalization of the results since there are hundreds of manufacturing companies, consultants and academicians implementing and consulting Kaizen. Therefore, a further study on a wider Ethiopian manufacturing companies, consultants and academic scale would be informative.

Practical implications

This work is very important for Kaizen professionals in the manufacturing industry, academic and government but in particular for senior management and leadership teams. Aside from the main findings on framework development, there is some strong evidence that practice of Kaizen resulted in achieving quantitative (monetary and non-monetary) and qualitative results. Thus, senior management teams should use this research out to practice and analyze the effect of Kaizen on their own organizations. Within the academic community, this study is one of the first focusing on development, validating and practically testing and should aid further study, research and understanding of Kaizen in manufacturing industries.

Originality/value

So far, it is rare to find preceding studies proposed, validated and practically test an integrated Kaizen framework with the context of manufacturing industries. Thus, authors understand that this is the very first research focused on the development of the framework for manufacturing industries continuously to be competitive and could help managers, institutions, practitioners and academicians in Kaizen practice.

Details

International Journal of Quality & Reliability Management, vol. 40 no. 10
Type: Research Article
ISSN: 0265-671X

Keywords

Open Access
Article
Publication date: 20 March 2023

Adriano Rehder, João Valsecchi Souza, Roberto Marx and Mario Sergio Salerno

Agile methods are increasingly being applied in the contexts of innovation beyond traditional information technology (IT) and physical product development projects, such as when…

2089

Abstract

Purpose

Agile methods are increasingly being applied in the contexts of innovation beyond traditional information technology (IT) and physical product development projects, such as when process improvements are being implemented. Nevertheless, this phenomenon is still recent and little addressed in the literature, with few descriptions of empirical cases. This study aims to address this gap.

Design/methodology/approach

This multiple case study aims to present and discuss the application of Agile practices embedded in large companies’ innovation value chains, focusing on improvements of business processes. The following research question is pursued: How are large companies applying elements of Agile methods to their innovation processes when implementing incremental improvements in their operational processes? Based on the idea that the Agile-Stage-Gate model is an alternative to this challenge, this study investigates the application of this hybrid model in two large Brazilian companies by presenting their idiosyncrasies, lessons learned, adaptations, challenges and benefits.

Findings

Overall, it was observed that the experience with the application of the Agile-Stage-Gate model is positive for these companies, with better customer engagement, easier project control and increased productivity of the project team.

Originality/value

For those aiming to implement the Agile-Stage-Gate model, this paper identifies the main adaptations made in order to combine the purist approaches and critical success factors for its implementation.

Open Access
Article
Publication date: 16 November 2023

Angelo Rosa, Giuliano Marolla and Olivia McDermott

This study explores how Lean was deployed in several hospitals in the Apulia region in Italy over 3.5 years.

Abstract

Purpose

This study explores how Lean was deployed in several hospitals in the Apulia region in Italy over 3.5 years.

Design/methodology/approach

An exploratory qualitative design was drawn up based on semi-structured interviews.

Findings

The drivers of Lean in hospitals were to increase patient satisfaction and improve workplace well-being by eliminating non-value-add waste. The participants highlighted three key elements of the pivotal implementation stages of Lean: introduction, spontaneous and informal dissemination and strategic level implementation and highlighted critical success and failure factors that emerged for each of these stages. During the introduction, training and coaching from an external consultant were among the most impactful factors in the success of pilot projects, while time constraints and the adoption of process analysis tools were the main barriers to implementation. The experiences of the Lean teams strongly influence the process of spontaneous dissemination aided by the celebration of project results and the commitment of the departmental hospital heads.

Practical implications

Lean culture can spread to allow many projects be conducted spontaneously, but the Lean paradigm can struggle to be adopted strategically. Lean in healthcare can fail because of the lack of alignment of Lean with leadership in healthcare and with their strategic vision, a lack of employees' project management skills and crucially the absence of a Lean steering committee.

Originality/value

The absence of managerial expertise and a will to support Lean implementation do not allow for systemic adoption of Lean. This is one of the first and largest long-term case studies on a Lean cross-regional multi-hospital application in healthcare.

Details

International Journal of Health Care Quality Assurance, vol. 36 no. 3/4
Type: Research Article
ISSN: 0952-6862

Keywords

Article
Publication date: 8 June 2023

Lamiae Benhayoun, Marie-Anne Le-Dain, Tarik Saikouk, Holger Schiele and Richard Calvi

Buying firms involve suppliers early in New Product Development (NPD) projects to benefit from their capabilities. The authors investigate the joint impact on project performance…

Abstract

Purpose

Buying firms involve suppliers early in New Product Development (NPD) projects to benefit from their capabilities. The authors investigate the joint impact on project performance improvement, of the social capital established throughout the project, and the strategic preferred buyer/supplier statuses awarded prior to the project, from the buyer's perspective.

Design/methodology/approach

The authors propose a conceptual model underlining the complementary contribution to project performance of social capital dimensions and of preferred partners' statuses resulting from social exchange expectations. The model is analyzed with Partial Least Squares using 80 responses of purchasers and R&D managers involved in collaborative NPD projects with suppliers.

Findings

The relational capital built during the project has a positive central role, with a direct impact on NPD project performance and mediating effects through cognitive and structural capitals. The preferred partners' statuses have strong direct impacts on performance, and mediating effects that do not completely supplant the social capital's contribution.

Practical implications

The implications for the efficient management of supplier involvement are twofold. First, the authors encourage strategic investments of buying firms to acquire preferred buyer's status and to support preferred supplier programs. Second, the authors alert them on the importance of establishing trust and shared cognition during the project.

Originality/value

This study captures NPD project performance from the social angle of buyer–supplier relationship management. It demonstrates the complementarity of relationship management at the strategic and operational levels, before and during the project unfolding.

Details

The International Journal of Logistics Management, vol. 35 no. 2
Type: Research Article
ISSN: 0957-4093

Keywords

Article
Publication date: 19 May 2023

Ling Yan, Yichao Chen and Tingting Cao

The consulting team intervenes in the integrated construction consulting (ICC) network structure centered on “client-contractor-consultant.” Team boundary-spanning behavior (TBB…

Abstract

Purpose

The consulting team intervenes in the integrated construction consulting (ICC) network structure centered on “client-contractor-consultant.” Team boundary-spanning behavior (TBB) driven by the network structure is crucial to project performance. This article investigated how to stimulate the consulting project performance (CPP) improvement by considering the interactive effect of network structure and TBB. To be specific, this paper explored the configuration between structural characteristics of project networks, the dimension of TBB, and project performance in ICC projects.

Design/methodology/approach

Network density and centrality were used to reflect network structure. This study collected 216 valid responses from construction professionals (including project managers, department managers, and project engineers) via a questionnaire survey and analyzed the data using fsQCA.

Findings

Combining with the corresponding typical project case and analysis, the results concluded four types of configurations for achieving high performance in the ICC projects. Meanwhile, network centrality, density, ambassadorial behavior, coordination behavior, and detection behavior significantly impact high consulting project performance. Matching ICC network characteristics with the TBB is important. There are also three low performance configurations for the ICC projects. Low performance state also occurs when network centrality or density and coordination behavior is simultaneously low. Only the right match between the network characteristics and TBB can produce high consulting project performance.

Research limitations/implications

The network centrality and density, the implementation of TBB vary, and the paths to achieve high consulting project performance are different. Clients, ICC projects, and consulting teams should choose the appropriate development paths according to the actual situation. (1) Clients should commit to applying the ICC project model with high network centrality, density, and coordination behavior of ICC enterprises to promote project performance. (2) Consulting enterprises should carry out ICC business based on detecting behavior and coordinating behavior. (3) The market should cultivate head consulting enterprises with independence and integration, and bring into play the effectiveness of consulting team ambassadorial behavior.

Practical implications

Comparing the results of the four high CPP configurations, the network structure characteristics are essential, which means that in the Chinese consulting practice between the owner and the consulting firm pay attention to the use of appropriate ICC organizational structure model and arrange the degree of centralization of authorized responsibilities. Coordination behavior is necessary to achieve high CPP. Therefore, Chinese consulting firms should pay attention to effective communication and exchange with project contractors in order to get high CPP in conducting business; meanwhile, enabling behavior can achieve high CPP both in the presence and absence of configuration H1 and H4, which indicates that enabling behavior has substitution effect. Comparing the three low CPP configurations also contrarily confirms the indispensability of coordinating behavior. Comparing the results of high and low CPP configurations, the TBB is seriously missing and not properly applied in CPP enhancement. In detail, Chinese consulting firms have been regarded as independent third parties providing services, and less attention has been paid to the TBB of Chinese consulting firms in past practice, thus leading to the dilemma of inadequate empowerment of consulting firms due to their unclear status. To solve this dilemma, the findings of this paper offer a solution at the micro level to change the previous perception of consulting and demonstrate that Chinese consulting practice needs to pay attention to TBB with owners and contractors, and apply it well to enhance the reputation, management consulting level and capability, and experience and expertise of consulting firms to achieve high CPP.

Originality/value

The research results changed from the previous bilateral project governance to a new perspective of network embedding. It provided a theoretical basis for the improvement path of high consulting project performance, as well as providing ideas for clients on the organizational design of ICC projects. On the other hand, it provided a practical reference for TBB positioning of ICC enterprises for transformation and upgrading development.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 10000