Search results

1 – 10 of 356
Article
Publication date: 23 January 2023

Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…

461

Abstract

Purpose

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.

Design/methodology/approach

Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.

Findings

The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.

Research limitations/implications

Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.

Originality/value

Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 13 March 2024

Ingela Bäckström, Pernilla Ingelsson, Anna Mårtensson and Kristen M. Snyder

The purpose of this paper is to explore existing and desired methodologies for systematic quality work to promote quality in preschools from the principal’s perspective.

Abstract

Purpose

The purpose of this paper is to explore existing and desired methodologies for systematic quality work to promote quality in preschools from the principal’s perspective.

Design/methodology/approach

A collaborative approach was used in this research project, and principals were asked to complete portfolio assignments. Their answers to those portfolio assignments were analysed by the research team and subsequently compared to total quality management values.

Findings

Existing and desired methodologies for systematic quality work are presented and sorted into 13 and 17 groups, respectively. The principals desire four times more methodologies than they are presently using to promote systematic quality work, and the results show that they must extend their methodologies to support TQM values.

Research limitations/implications

This research is based on answers collected from 18 principals in one municipality in Sweden.

Practical implications

The use of the cornerstone model provides a framework to illustrate the application of TQM in preschools.

Originality/value

Principals struggle to find time for systemic quality work. The presented results can be used to work systematically with quality in preschools and other organizations.

Details

Quality Assurance in Education, vol. 32 no. 2
Type: Research Article
ISSN: 0968-4883

Keywords

Article
Publication date: 25 April 2024

Domenica Barile, Giustina Secundo and Candida Bussoli

This study examines the Robo-Advisors (RA) based on Artificial Intelligence (AI), a new service that digitises and automates investment decisions in the financial and banking…

Abstract

Purpose

This study examines the Robo-Advisors (RA) based on Artificial Intelligence (AI), a new service that digitises and automates investment decisions in the financial and banking industries to provide low-cost and personalised financial advice. The RAs use objective algorithms to select portfolios, reduce behavioural biases, and improve transactions. They are inexpensive, accessible, and transparent platforms. Objective algorithms improve the believability of portfolio selection.

Design/methodology/approach

This study adopts a qualitative approach consisting of an exploratory examination of seven different RA case studies and analyses the RA platforms used in the banking industry.

Findings

The findings provide two different approaches to running a business that are appropriate for either fully automated or hybrid RAs through the realisation of two platform model frameworks. The research reveals that relying solely on algorithms and not including any services involving human interaction in a company model is inadequate to meet the requirements of customers in decision-making.

Research limitations/implications

This study emphasises key robo-advisory features, such as investor profiling, asset allocation, investment strategies, portfolio rebalancing, and performance evaluation. These features provide managers and practitioners with new information on enhancing client satisfaction, improving services, and adjusting to dynamic market demands.

Originality/value

This study fills the research gap related to the analysis of RA platform models by providing a meticulous analysis of two different types of RAs, namely, fully automated and hybrid, which have not received adequate attention in the literature.

Details

Management Decision, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0025-1747

Keywords

Article
Publication date: 29 April 2021

Efpraxia D. Zamani, Anastasia Griva, Konstantina Spanaki, Paidi O'Raghallaigh and David Sammon

The study aims to provide insights in the sensemaking process and the use of business analytics (BA) for project selection and prioritisation in start-up settings. A major focus…

Abstract

Purpose

The study aims to provide insights in the sensemaking process and the use of business analytics (BA) for project selection and prioritisation in start-up settings. A major focus is on the various ways start-ups can understand their data through the analytical process of sensemaking.

Design/methodology/approach

This is a comparative case study of two start-ups that use BA in their projects. The authors follow an interpretive approach and draw from the constructivist grounded theory method (GTM) for the purpose of data analysis, whereby the theory of sensemaking functions as the sensitising device that supports the interpretation of the data.

Findings

The key findings lie within the scope of project selection and prioritisation, where the sensemaking process is implicitly influenced by each start-up's strategy and business model. BA helps start-ups notice changes within their internal and external environment and focus their attention on the more critical questions along the lines of their processes, operations and business model. However, BA alone cannot support decision-making around less structured problems such as project selection and prioritisation, where intuitive judgement and personal opinion are still heavily used.

Originality/value

This study extends the research on BA applied in organisations as tools for business development. Specifically, the authors draw on the literature of BA tools in support of project management from multiple perspectives. The perspectives include but are not limited to project assessment and prioritisation. The authors view the decision-making process and the path from insight to value, as a sensemaking process, where data become part of the sensemaking roadmap and BA helps start-ups navigate the decision-making process.

Details

Information Technology & People, vol. 37 no. 2
Type: Research Article
ISSN: 0959-3845

Keywords

Open Access
Article
Publication date: 3 May 2023

Lars Stehn and Alexander Jimenez

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…

Abstract

Purpose

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.

Design/methodology/approach

Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.

Findings

According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.

Originality/value

Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 March 2024

Valérie Mérindol and David W. Versailles

Innovation management in the healthcare sector has undergone significant evolutions over the last decades. These evolutions have been investigated from a variety of perspectives…

Abstract

Purpose

Innovation management in the healthcare sector has undergone significant evolutions over the last decades. These evolutions have been investigated from a variety of perspectives: clusters, ecosystems of innovation, digital ecosystems and regional ecosystems, but the dynamics of networks have seldom been analyzed under the lenses of entrepreneurial ecosystems (EEs). As identified by Cao and Shi (2020), the literature is silent about the organization of resource allocation systems for network orchestration in EEs. This article investigates these elements in the healthcare sector. It discusses the strategic role played by entrepreneurial support organizations (ESOs) in resource allocation and elaborates on the distinction between sponsored and nonsponsored ESOs in EEs. ESOs are active in network orchestration. The literature explains that ESOs lift organizational, institutional and cultural barriers, and support entrepreneurs' access to cognitive and technological resources. However, allocation models are not yet discussed. Therefore, our research questions are as follows: What is the resource allocation model in healthcare-related EEs? What is the role played by sponsored and nonsponsored ESOs as regards resource allocation to support the emergence and development of EEs in the healthcare sector?

Design/methodology/approach

The article offers an explanatory, exploratory, and theory-building investigation. The research design offers an abductive research protocol and multi-level analysis of seven (sponsored and nonsponsored) ESOs active in French healthcare ecosystems. Field research elaborates on semi-structured interviews collected between 2016 and 2022.

Findings

This article shows explicit complementarities between top-down and bottom-up resource allocation approaches supported by ESOs in the healthcare sector. Despite explicit originalities in each approach, no network orchestration model prevails. Multi-polar coordination is the rule. Entrepreneurs' access to critical technological and cognitive resources is based on resource allocation modalities that differ for sponsored versus nonsponsored ESOs. Emerging from field research, this research also shows that sponsored and nonsponsored ESOs manage their roles in different ways because they confront original issues about organizational legitimacy.

Originality/value

Beyond the results listed above, the main originalities of the paper relate to the instantiation of multi-level analysis operated during field research and to the confrontation between sponsored versus nonsponsored ESOs in the domain of healthcare-related innovation management. This research shows that ESOs have practical relevance because they build original routes for resource allocation and network orchestration in EEs. Each ESO category (sponsored versus nonsponsored) provides original support for resource allocation. The ESO's legitimacy is inferred either from the sponsor or the services delivered to end-users. This research leads to propositions for future research and recommendations for practitioners: ESO managers, entrepreneurs, and policymakers.

Details

International Journal of Entrepreneurial Behavior & Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1355-2554

Keywords

Article
Publication date: 17 November 2023

Julia Gracheva and Brenda H. Groen

This paper aims to determine the advantages and disadvantages associated with integrating a coworking environment into the real estate portfolios of large office-based…

Abstract

Purpose

This paper aims to determine the advantages and disadvantages associated with integrating a coworking environment into the real estate portfolios of large office-based organizations. The study discusses both external and internal coworking solutions.

Design/methodology/approach

This paper is a literature review and qualitative research based on 12 semistructured interviews with high-level real estate practitioners, including users, suppliers and consultants.

Findings

The authors examined the advantages and disadvantages of incorporating coworking environments into the real estate portfolios of large organizations from the four perspectives of Krumm et al. (2000). These perspectives were operationalized through the 12 real estate added value parameters of Jensen and Van der Voordt (2017). The findings show that improved adaptability is the greatest advantage of external coworking solutions (facility management perspective). The most significant advantage of internal coworking is related to stimulation of innovation, creativity and knowledge sharing (general management perspective). The disadvantages of external and internal coworking partly overlap and are mainly the negative effect on the corporate culture (general management perspective).

Originality/value

The findings contribute to the understanding of the advantages and disadvantages of incorporating both external and internal coworking solutions from multiple perspectives and allow to compare them. The authors developed and tested an operationalization of the four perspectives of Krumm (2000) through the 12 added values of Jensen and Van der Voordt (2017). Opinions and perceptions of professionals regarding internal and external coworking models are presented in a framework and related to earlier findings.

Details

Journal of Corporate Real Estate , vol. 26 no. 1
Type: Research Article
ISSN: 1463-001X

Keywords

Article
Publication date: 7 February 2022

Bankole Osita Awuzie, Zwelinzima P. Mcwari, Progress Shingai Chigangacha, Clinton Ohis Aigbavboa, Theo C. Haupt and Lovelin Obi

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project…

Abstract

Purpose

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project failure has continued unabated despite this shift by public-sector entities. Also, there appears to be limited literature focussed on seeking to provide the rationale governing the decision to outsource or insource consultancy services by public-sector organisations. The purpose of this study was to appraise the performance of public-sector projects in which consultancy services have been outsourced or insourced. These are the gaps which this study was undertaken to fill.

Design/methodology/approach

A grounded theory methodology (GTM) research design was adopted based on the nature of evidence sought and gathered from a Provincial Department of Public Works and Infrastructure (PDPWI) in South Africa. Data was obtained from a mixture of semi-structured interviews and project-specific documents spanning a five-year period and was analysed according to the procedures associated with GTM. Accordingly, open coding, axial coding and pattern matching were carried out at several intervals to develop categories and themes.

Findings

The findings of the study showed the absence of a structured approach within the PDPWI for facilitating decisions pertaining to outsourcing or insourcing consultancy services within construction projects. Furthermore, the study established that both approaches yielded similar results across all performance facets of cost, time and quality. In addition, a detailed insight into the steps required for the successful application of GTM in built environment research has been provided in the study.

Originality/value

Limited studies have been undertaken to compare the impact of either outsourced or insourced services on the organisational and project performance. This was the gap to which the study reported in this paper was undertaken to contribute.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Abstract

Purpose

Competency frameworks can support public procurement capacity development and performance. However, literature on connecting professionalisation with national procurement contexts is limited. This paper aims to explain and conceptualise recent Romanian experience with developing bespoke competency frameworks at national level for public procurement that reflect the features of the Romanian public procurement system. The approach used could guide in broad-brush, mutatis mutandis, other (national) public procurement systems with comparable features, mainly those seeking a shift from a rather administrative function of public procurement towards a strategic function.

Design/methodology/approach

This case study reflects on the methodology used for analysing the Romanian public procurement environment in EU context to develop bespoke professionalisation instruments, and on ways to integrate competency management approaches in Romanian public procurement culture. That methodological mix has been mainly qualitative and constructionist, within an applied research approach. It combined desk research with empirical research and included legal research in this context.

Findings

A principled, methodological and pragmatic approach tailored to the procurement environment in question is essential for developing competency frameworks capable to resonate to and address the specific practical needs of that procurement system.

Social implications

Competency frameworks can uphold societal objectives through public procurement.

Originality/value

Using valuable insights into the development of the Romanian public procurement competency frameworks, the paper provides a conceptual framework for instilling competency management approaches to public procurement professional development where the latter is governed by a rather distinct, public administration, paradigm. This conceptual framework can guide other public procurement systems and stimulate further research.

Article
Publication date: 26 March 2024

Gavin Ford and Jonathan Gosling

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through…

Abstract

Purpose

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through quantitative research over the years to understand why the industry continues to see similar issues of failure. Some scholars have reported rework figures as high as 12.6% of total contract value, highlighting major concerns of the sustainability of construction projects. Separately, however, there have been few studies that explore and detail the views of industry professions who are caught in the middle of quality issues, to understand their perceptions of where the industry is failing. As such, this paper interrogates qualitative data (open-ended questions) on the topic of nonconformance and rework in construction to understand what industry professionals believe are the causes and suggested improvement areas.

Design/methodology/approach

A qualitative approach is adopted for this research. An industry survey consisting of seven open-ended questions is presented to two professional working groups within a Tier 1 contractor, and outputs are analysed using statistic software (NVivo 12) to identify prominent themes for discussion. Inductive analysis is undertaken to gain further insight into responses to yield recurrent areas for continuous improvement.

Findings

Qualitative analysis of the survey reveals a persistent prioritisation of cost and programme over quality management in construction project. Furthermore, feedback from construction professionals present a number of improvement areas that must be addressed to improve quality. These include increased training and competency investment, overhauling quality behaviours, providing greater quality leadership direction and reshaping the way clients govern schemes.

Research limitations/implications

There are limitations to this paper that require noting. Firstly, the survey was conducted within one principal contractor with varying levels of knowledge across multiple sectors. Secondly, the case study was from one major highways scheme; therefore, the generalisability of the findings is limited. It is suggested that a similar exercise is undertaken in other sectors to uncover similar improvement avenues.

Practical implications

The implications of this study calls for quality to be re-evaluated at project, company, sector and government levels to overhaul how quality is delivered. Furthermore, the paper identifies critical learning outcomes for the construction sector to take forward, including the need to reassess projects to ensure they are appropriately equip with competent personnel under a vetted, progressive training programme, share collaborative behaviours that value quality delivery on an equal standing to safety, programme and cost and tackle the inappropriate resource dilemmas projects finding themselves in through clear tendering and accurate planning. In addition, before making erratic decisions, projects must assess the risk profiling of proceed without approved design details and include the client in the decision-making process. Moreover, the findings call for a greater collaborative environment between the construction team and quality management department, rather than being seen as obstructive (i.e. compliance based policing). All of these must be driven by leadership to overhaul the way quality is managed on schemes. The findings demonstrate the importance and impact from open-ended survey response data studies to enhance quantitative outcomes and help provide strengthened proposals of improvement.

Originality/value

This paper addresses the highly sensitive area of quality failure outcomes and interrogates them via an industry survey within a major UK contractor for feedback. Unique insights are gained into how industry professionals perceive quality in construction. From previous research, this has been largely missing and offers a valuable addition in understanding the “quality status quo” from those delivering schemes.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

1 – 10 of 356