Article
Publication date: 1 April 2024

Zoubeir Lafhaj, Slim Rebai, Olfa Hamdi, Rateb Jabbar, Hamdi Ayech and Pascal Yim

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of…

Abstract

Purpose

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of construction project monitoring and management. This research aims to enhance efficiency, transparency and trust within the dynamic and collaborative environment of the construction industry by leveraging the decentralized, secure and immutable nature of blockchain technology.

Design/methodology/approach

This paper employs a comprehensive approach encompassing the formulation of the COPULA model, the development of a digital solution using the ethereum blockchain and extensive testing to assess performance in terms of execution cost, time, integrity, immutability and security. A case analysis is conducted to demonstrate the practical application and benefits of blockchain technology in real-world construction project monitoring scenarios.

Findings

The findings reveal that the COPULA framework effectively addresses critical issues such as centralization, privacy and security vulnerabilities in construction project management. It facilitates seamless data exchange among stakeholders, ensuring real-time transparency and the creation of a tamper-proof communication channel. The framework demonstrates the potential to significantly enhance project efficiency and foster trust among all parties involved.

Research limitations/implications

While the study provides promising insights into the application of blockchain technology in construction project monitoring, future research could explore the integration of COPULA with existing project management methodologies to broaden its applicability and impact. Further investigations into the solution’s scalability and adaptation to various construction project types and sizes are also suggested.

Originality/value

This research offers a comprehensive blockchain solution specifically tailored for the construction industry. Unlike prior studies focusing on theoretical aspects, this paper presents a practical, end-to-end solution encompassing model formulation, digital implementation, proof-of-concept testing and validation analysis. The COPULA framework marks a significant advancement in the digital transformation of construction project monitoring, providing a novel approach to overcoming longstanding industry challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 3 April 2024

Lili Gao, Xicheng Zhang, Xiaopeng Deng, Na Zhang and Ying Lu

This study aims to investigate the relationship between individual-level psychological resources and team resilience in the context of expatriate project management teams. It…

Abstract

Purpose

This study aims to investigate the relationship between individual-level psychological resources and team resilience in the context of expatriate project management teams. It seeks to understand how personal psychological resources contribute to team resilience and explore the dynamic evolution mechanism of team resilience. The goal is to enhance team resilience among expatriates in a BANI (Brittle, Anxious, Nonlinear, and Incomprehensible) world, where organizations face volatile and uncertain conditions.

Design/methodology/approach

An online survey was applied for data collection, and 315 valid samples from Chinese expatriates in international construction projects were utilized for data analysis. A structural equation model (SEM) examines the relationships between personal psychological resources and team resilience. The study identifies five psychological factors influencing team resilience: Employee Resilience, Cross-cultural Adjustment, Self-efficacy, Social Support, and Team Climate. The hypothesized relationships are validated through the SEM analysis. Additionally, a fuzzy cognitive map (FCM) is constructed to explore the dynamic mechanism of team resilience formation based on the results of the SEM.

Findings

The SEM analysis confirms that employee resilience, cross-cultural adjustment, and team climate positively impact team resilience. Social support and self-efficacy also have positive effects on team climate. Moreover, team climate is found to fully mediate the relationship between self-efficacy and team resilience, as well as between social support and team resilience. The FCM model provides further insights into the dynamic evolution of team resilience, highlighting the varying impact effects of antecedents during the team resilience development process and the effectiveness of different combinations of intervention strategies.

Originality/value

This study contributes to understanding team resilience by identifying the psychological factors influencing team resilience in expatriate project management teams. The findings emphasize the importance of social support and team climate in promoting team resilience. Interventions targeting team climate are found to facilitate the rapid development of team resilience. In contrast, interventions for social support are necessary for sustainable, long-term high levels of team resilience. Based on the dynamic simulation results, strategies for cultivating team resilience through external intervention and internal adjustment are proposed, focusing on social support and team climate. Implementing these strategies can enhance project management team resilience and improve the core competitiveness of contractors in the BANI era.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 4 April 2023

Andrew Ebekozien, Clinton Ohis Aigbavboa and Mantoa Ramotshela

Stakeholder engagement in construction projects is an ingredient that contributes to project optimal performance. Many developing countries have a paucity of literature about…

4627

Abstract

Purpose

Stakeholder engagement in construction projects is an ingredient that contributes to project optimal performance. Many developing countries have a paucity of literature about stakeholders' engagement in construction projects. Therefore, the study investigated South Africa's shareholders' engagement in construction projects and recommended possible measures to mitigate potential limitations.

Design/methodology/approach

The researchers collated data from South African experts in stakeholder engagement via a phenomenology type of qualitative research design. They explored the “perceived hindrances” facing stakeholders' engagement in construction projects and proffer measures to mitigate them. The study analysed collected data via thematic analysis and achieved saturation. Three themes emerged from the analysed data.

Findings

Findings show that efficient stakeholder engagement will enhance team collaboration and integrated construction project delivery. Results identified the perceived limitations facing stakeholders' engagement in South Africa's construction projects and categorised them into individual perceived hindrances, organisational perceived hindrances and government-related perceived hindrances. Also, findings proffer measures to mitigate perceived hindrances via policies and programmes within the sector.

Practical implications

Besides enhancing policymakers and other stakeholders in South Africa's construction industry to understand the benefits of stakeholder engagement better, the study may stir up the construction sector's stakeholders to embrace enhanced and effective stakeholders' management.

Originality/value

This study contributes to construction project practice that involves stakeholders, as it reveals the underlying causes of perceived hindrances facing stakeholders' engagement in construction projects. Also, it proffers feasible solutions to mitigate these hindrances and enhance stakeholders' engagement within South Africa's construction projects.

Details

Benchmarking: An International Journal, vol. 31 no. 3
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 26 March 2024

Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…

Abstract

Purpose

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).

Design/methodology/approach

A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.

Findings

This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.

Originality/value

This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 28 March 2023

Namra Mubarak, Jabran Khan, Sajid Bashir and Samyia Safdar

The success of projects is a major challenge for information technology (IT) project-based businesses (PBOs). Employees' negative emotions (NE) disrupt the employees' usual work…

Abstract

Purpose

The success of projects is a major challenge for information technology (IT) project-based businesses (PBOs). Employees' negative emotions (NE) disrupt the employees' usual work activities by creating obstacles to routine operations. Organizations should take steps to lessen these NE. The current study assessed the mediating role of NE and the moderating influence of employee mindfulness in the association between despotic leadership (DL) and IT project success (PS).

Design/methodology/approach

Time-lagged data were collected from 341 employees working in various IT-based project organizations in Pakistan using purposive sampling.

Findings

Results were consistent with the authors' hypothesized framework, as DL increases employees' NE, which in turn negatively affects IT PS. In addition, mindfulness plays a buffering role in mitigating the damaging impact of DL on NE.

Originality/value

Previous researchers focused on the positive aspects of leadership and its influence on PS and paid limited attention to the dark leadership style. The authors' study's findings help understand how project-based organizations can reduce employees' NE.

Details

Journal of Managerial Psychology, vol. 39 no. 3
Type: Research Article
ISSN: 0268-3946

Keywords

Article
Publication date: 7 June 2023

Khalil Idrissi Gartoumi, Mohamed Aboussaleh and Smail Zaki

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation…

Abstract

Purpose

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation during the construction of megaprojects.

Design/methodology/approach

This paper presents a case study involving the construction of the Mohamed VI Tower in Morocco. It is the tallest tower in Africa, with 55 floors and a total height of 250 m. This study of the quality of the work and the involvement of the LC was carried out using the Define–Measure–Analysis–Improve–Control approach from Lean six sigma. It describes the Critical to Quality and analyses the root causes of quality defects, customer dissatisfaction and variation in the quality process.

Findings

Firstly, the results of this study map the causal factors of lack of quality as established in the literature. Secondly, the LC tools have reduced non-value-added sources of quality waste and, consequently, improved critical quality indicators.

Research limitations/implications

This document focuses on one part of the tower’s construction and is limited to a project case in a country where LC is rarely used.

Originality/value

This study reinforces the literature reviews, surveys and the small number of case studies that have validated the potential of LC and further clarifies future directions for the practical emergence of this quality improvement approach, especially for large-scale projects.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 12 April 2024

Jiajia Cheng, Lianying Zhang, Mingming He and Yingying Yao

Project-based organizations (PBOs) face challenges to enhance employee work engagement because of dynamic and constant role configuration. Accordingly, this study aims to explore…

Abstract

Purpose

Project-based organizations (PBOs) face challenges to enhance employee work engagement because of dynamic and constant role configuration. Accordingly, this study aims to explore how ethical leadership enhances employee work engagement from a sensemaking perspective.

Design/methodology/approach

This study used a questionnaire-based quantitative research design to collect data from 194 full-time employees in PBOs. The data were analyzed via partial least squares-structural equation modeling (PLS-SEM) technique to test hypotheses.

Findings

The findings show a positive relationship between ethical leadership and work engagement. Additionally, the relationship between ethical leadership and work engagement is mediated by two sensemaking mechanisms, i.e. goal commitment and prosocial.

Originality/value

This study deepens the understanding of how ethical leadership enhances work engagement in PBOs by providing two sensemaking mechanisms. By exploring the sensemaking process through which ethical leaders help employees construct identity, the findings contribute to the current literature on how ethical leadership enhances work engagement in PBOs.

Details

Leadership & Organization Development Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0143-7739

Keywords

Article
Publication date: 26 March 2024

Jing An, Suicheng Li and Xiao Ping Wu

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study…

Abstract

Purpose

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study focuses on resource-constrained project scheduling in multi-project environments. The research simplifies the problem by adopting a single-project perspective using gain coefficients.

Design/methodology/approach

It employs uncertainty theory and multi-objective programming to construct a model. The optimal solution is identified using Matlab, while LINGO determines satisfactory alternatives. By combining these methods and considering actual construction project situations, a compromise solution closely approximating the optimal one is derived.

Findings

The study provides fresh insights into modeling and resolving resource-constrained project scheduling issues, supported by real-world examples that effectively illustrate its practical significance.

Originality/value

The research highlights three main contributions: effective resource utilization, project prioritization and conflict management, and addressing uncertainty. It offers decision support for project managers to balance resource allocation, resolve conflicts, and adapt to changing project demands.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 April 2024

Chaitanya Arun Sathe and Chetan Panse

This study aims to examine the enablers of productivity of enterprise-level Agile development process using modified total interpretative structural modeling (TISM). The two main…

Abstract

Purpose

This study aims to examine the enablers of productivity of enterprise-level Agile development process using modified total interpretative structural modeling (TISM). The two main objectives of the current study are to determine the variables influencing enterprise-level agile development productivity and to develop modified TISM for the corresponding components.

Design/methodology/approach

To identify enablers of the productivity of enterprise-level agile software development process a literature review and opinions of domain experts were collected. A hierarchical relationship among variables that show direct and indirect influence is created using the modified TISM (M-TISM) technique with Cross Impact Matrix-Multiplication Applied to Classification analysis. This study examined and analyzed the relationships between the determinants within the enterprise using a M-TISM technique.

Findings

With the literature review, the study could identify ten enabling factors of the productivity of Agile development process at the enterprise level. Results depict that program increment (PI) planning and scalable backlog management, continuous integration and continuous delivery (CI/CD), agile release trains (ART), agile work culture, delivery excellence, lean and DevOps practices, value stream mapping (VMS), team skills and expertise, collaborative culture, agile coaching, customer engagement have an impact on the productivity of enterprise-level Agile development process. The results show that team collaboration, agile ways of working and customer engagement have a greater impact on productivity improvement for enterprise-level Agile development process.

Research limitations/implications

The developed model is useful for organizations employing scaled Agile development processes in software development. This study provides a recommended listing of key enablers, that may enable productivity improvements in the Agile development process at the enterprise level. Strategists should focus on team collaboration and Agile project management. This study offers a modified TISM model to academicians to help them understand the effects of numerous variables on maintaining the productivity of an enterprise-level Agile. The identified characteristics and their hierarchical structure can help project managers during the execution of Agile projects at the enterprise level, more effectively, increasing their success and productivity.

Originality/value

The study addresses the gap in the literature by interpretative relationships between the identified enabling factors. The model validation is carried out by a panel of nine experts from several information technology organizations deploying Agile software development at the enterprise level. This unique method broadens the knowledge base in Agile software development at scale and provides project managers and practitioners with a practical foundation.

Details

Journal of Modelling in Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1746-5664

Keywords

Open Access
Article
Publication date: 13 February 2024

Kaisu Laitinen, Mika Luhtala, Maiju Örmä and Kalle Vaismaa

Insufficient productivity development in the global and Finnish infrastructure sectors indicates that there are challenges in genuinely achieving the goals of resource efficiency…

Abstract

Purpose

Insufficient productivity development in the global and Finnish infrastructure sectors indicates that there are challenges in genuinely achieving the goals of resource efficiency and digitalization. This study adapts the approach of capability maturity model integration (CMMI) for examining the capabilities for productivity development that reveal the enablers of improving productivity in the infrastructure sector.

Design/methodology/approach

Civil engineering in Finland was selected as the study area, and a qualitative research approach was adopted. A novel maturity model was constructed deductively through a three-step analytical process. Previous research literature was adapted to form a framework with maturity levels and key process areas (KPAs). KPA attributes and their maturity criteria were formed through a thematic analysis of interview data from 12 semi-structured group interviews. Finally, validation and refinement of the model were performed with an expert panel.

Findings

This paper provides a novel maturity model for examining and enhancing the infrastructure sector’s maturity in productivity development. The model brings into discussion the current business logics, relevance of lifecycle-thinking, binding targets and outcomes of limited activities in the surrounding infrastructure system.

Originality/value

This paper provides a new approach for pursuing productivity development in the infrastructure sector by constructing a maturity model that adapts the concepts of CMMI and change management. The model and findings benefit all actors in the sector and provide an understanding of the required elements and means to achieve a more sustainable built environment and effective operations.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords