Search results

1 – 10 of 862
Article
Publication date: 23 October 2023

Mariam Bader, Jiju Antony, Raja Jayaraman, Vikas Swarnakar, Ravindra S. Goonetilleke, Maher Maalouf, Jose Arturo Garza-Reyes and Kevin Linderman

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six…

Abstract

Purpose

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six Sigma and Agile. Proposing a mitigation framework accordingly is also an aim of this study.

Design/methodology/approach

This research undertakes a systematic literature review of 49 papers that were relevant to the scope of the study and that were published in four prominent databases, including Google Scholar, Scopus, Web of Science and EBSCO.

Findings

Further analysis identifies 39 factors that contribute to the failure of PI projects. Among these factors, significant emphasis is placed on issues such as “resistance to cultural change,” “insufficient support from top management,” “inadequate training and education,” “poor communication” and “lack of resources,” as primary causes of PI project failures. To address and overcome the PI project failures, the authors propose a framework for failure mitigation based on change management models. The authors present future research directions that aim to enhance both the theoretical understanding and practical aspects of PI project failures.

Practical implications

Through this study, researchers and project managers can benefit from well-structured guidelines and invaluable insights that will help them identify and address potential failures, leading to successful implementation and sustainable improvements within organizations.

Originality/value

To the best of the author’s knowledge, this paper is the first study of its kind to examine the CFFs of five PI methodologies and introduces a novel approach derived from change management theory as a solution to minimize the risk associated with PI failure.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Book part
Publication date: 19 March 2024

John Thomas Flynn and Lloyd Levine

A quick search of the headlines of major newspapers reveals a treasure trove of technology procurement gone wrong. While the private sector seems to adopt and implement new…

Abstract

A quick search of the headlines of major newspapers reveals a treasure trove of technology procurement gone wrong. While the private sector seems to adopt and implement new technology seamlessly and quickly to deliver for customers, the government struggles to accomplish technology purchases and integrations with the same ease. As governments in the United States are looking to retain their current workforce and attract the next generation of workers, the technological capabilities and ethos of governments will be paramount. With nearly every industry being transformed by technology and Generation T being the first generation to have an ingrained “technology first” mindset, the ability of governments to attract these workers depends, in large part, on the ability to transform their government technology culture, policies, and practices.

In this chapter, the authors examine the administrative branch and observe two key components at the root of most technology failures: poor organizational structure in the bureaucracy and the lack of an empowered Chief Information/Technology Officer. Building upon case studies from Massachusetts and California, this chapter looks at the factors related to failure or success to understand the technology procurement culture. The chapter concludes by presenting four key “best practice” principles of public policy and administration that can be implemented by almost any governmental entity to improve their acquisition and implementation of technology.

Details

Technology vs. Government: The Irresistible Force Meets the Immovable Object
Type: Book
ISBN: 978-1-83867-951-4

Keywords

Article
Publication date: 12 April 2024

Rogers Mwesigwa, Gonzaga Basulira, Joseph Mayengo and Jude Thadeo Mugarura

This study aims to examine the association between community engagement, community commitment and sustainability of public–private partnership (PPP) projects in Uganda.

Abstract

Purpose

This study aims to examine the association between community engagement, community commitment and sustainability of public–private partnership (PPP) projects in Uganda.

Design/methodology/approach

This study adopted a cross-sectional and quantitative approach. Data were collected using a questionnaire from 42 PPP projects in Uganda.

Findings

The study found that community engagement and commitment are all positively and significantly associated with the sustainability of PPP projects in Uganda. Results also show that community commitment mediates community engagement and project sustainability.

Research limitations/implications

The study results imply that for sustainability to be achieved, communities must be engaged in project activities such as planning, design and implementation to boost their commitment to project sustainability.

Originality/value

The sustainability of PPP projects is an emerging phenomenon. This paper contributes to scanty literature on ensuring the sustainability of PPP projects from a developing country’s perspective.

Details

Journal of Management Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0262-1711

Keywords

Book part
Publication date: 19 March 2024

Noah McClain

In the mid-2000s, the operator of New York City’s mass transit network committed more than a half-billion dollars to military contractor Lockheed Martin for a security technology…

Abstract

In the mid-2000s, the operator of New York City’s mass transit network committed more than a half-billion dollars to military contractor Lockheed Martin for a security technology capable, in part, of inferring threats based on analysis of data streams, of developing response strategies, and taking automated action toward alerts and calamities in light of evolving circumstances. The project was a failure. This chapter explores the conceptualization and development of this technology – rooted in cybernetics – and compares its conceptual underpinnings with some situated problems of awareness, communication, coordination, and action in emergencies as they unfold in one of the busiest transport systems in the world, the New York subway. The author shows how the technology, with all the theatrical trappings of a “legitimate” security solution, was apparently conceived without a grounded understanding of actual use-cases, and the degree to which the complex interactions which give rise to subway emergency can be anticipated in – and therefore managed through – a technological system. As a case-study, the chapter illustrates the pitfalls of deploying technology against problems which are not well-defined in the first place, to the neglect of investments against much more fundamental problems – such as inadequate communication systems, and unstable relationships with emergency response agencies – which might offer guaranteed benefits, and indeed lay a firm groundwork for future deployment of more ambitious technology.

Details

Technology vs. Government: The Irresistible Force Meets the Immovable Object
Type: Book
ISBN: 978-1-83867-951-4

Keywords

Article
Publication date: 24 January 2022

Muhammad Ayat, Sheheryar Mohsin Qureshi and Changwook Kang

The purpose of this study is to propose an improved framework for managing Private Participation in Infrastructure ICT (PPI-ICT) projects in the context of developing countries as…

Abstract

Purpose

The purpose of this study is to propose an improved framework for managing Private Participation in Infrastructure ICT (PPI-ICT) projects in the context of developing countries as the requirements to manage them are different in several aspects.

Design/methodology/approach

The framework has been proposed based on an exhaustive literature review and statistical analysis of the PPI-ICT projects’ data set using logistic regression, F-test and student’s t-test. The proposed framework was also applied to the PPI-ICT projects.

Findings

The framework is an extension to NTCP (novelty, technology, complexity and pace) approach by including extrinsic factors such as income of the country, climate risk, religious diversity, political stability, regularity quality and control of corruption. The proposed framework was used to analyze project characteristics and their external conditions in the context of developing countries. Based on the analyses, the authors have presented a detailed set of recommendations for project managers, practitioners and governments to improve the success rate of these projects.

Originality/value

The major contribution of this study is the framework, which encompasses the NTCP model as well as extrinsic characteristics of PPI-ICT projects. The proposed framework is meant to assist the project managers to comprehend the project characteristics and its external environment to identify an adequate approach for managing projects successfully.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 7 June 2023

Khalil Idrissi Gartoumi, Mohamed Aboussaleh and Smail Zaki

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation…

Abstract

Purpose

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation during the construction of megaprojects.

Design/methodology/approach

This paper presents a case study involving the construction of the Mohamed VI Tower in Morocco. It is the tallest tower in Africa, with 55 floors and a total height of 250 m. This study of the quality of the work and the involvement of the LC was carried out using the Define–Measure–Analysis–Improve–Control approach from Lean six sigma. It describes the Critical to Quality and analyses the root causes of quality defects, customer dissatisfaction and variation in the quality process.

Findings

Firstly, the results of this study map the causal factors of lack of quality as established in the literature. Secondly, the LC tools have reduced non-value-added sources of quality waste and, consequently, improved critical quality indicators.

Research limitations/implications

This document focuses on one part of the tower’s construction and is limited to a project case in a country where LC is rarely used.

Originality/value

This study reinforces the literature reviews, surveys and the small number of case studies that have validated the potential of LC and further clarifies future directions for the practical emergence of this quality improvement approach, especially for large-scale projects.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 15 April 2024

Rabail Tariq, Yifan Wang and Khawaja Fawad Latif

Through the lens of resource-based view (RBV), knowledge-based view (KBV) and DCV, this paper aims to investigate the relationship of entrepreneurial leadership (EL) on the…

Abstract

Purpose

Through the lens of resource-based view (RBV), knowledge-based view (KBV) and DCV, this paper aims to investigate the relationship of entrepreneurial leadership (EL) on the project success (PS) and further examines the mediating effect of knowledge infrastructure capability (KIC), knowledge-based dynamic capability (KBDC) and Big data analytic capability (BDAC).

Design/methodology/approach

The data were collected from 467 employees working on project in software companies. The data were evaluated using SMART-PLS, a structural equation modeling (SEM) tool.

Findings

The study revealed a significant impact of EL on the PS, the study also found the significant mediation role of KIC, KBDC and BDAC on the EL and PS relationship.

Originality/value

The research gives valuable insight into the effective role of EL as a contemporary leadership style in project-based firms. Also, this research is one of the first to examine knowledge-oriented dynamic capabilities (DC) as a knowledge fulcrum in project execution. These DC have been empirically proven to facilitate EL in achieving PS and support the firm in competing in an uncertain environment.

Details

Journal of Enterprise Information Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0398

Keywords

Article
Publication date: 13 December 2022

Matthew Osivue Ikuabe, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Donald Chiyangwa and Ayodeji Emmanuel Oke

Joint ventures (JVs) serve as a viable tool in mitigating some of the challenges posed to the effective delivery of construction projects. However, JVs are highly susceptible to…

Abstract

Purpose

Joint ventures (JVs) serve as a viable tool in mitigating some of the challenges posed to the effective delivery of construction projects. However, JVs are highly susceptible to failure in most developing countries. Therefore, this study seeks to unravel the critical factors influencing the failure of JVs in the South African construction industry.

Design/methodology/approach

A quantitative approach was adopted for the study using a well-structured questionnaire as the instrument for data collection. Respondents for the study were built environment professionals in Gauteng province in South Africa. Data elicited from respondents were analyzed using a four-pronged process which included descriptive statistics, one sample t-test, exploratory factor analysis and confirmatory factor analysis.

Findings

Resulting from the analysis conducted, four critical components emerged as the major factors influencing the failure of JVs in the South African construction industry, which are inefficient financial framework, divergent organizational culture, poor project governance and inadequacies from project stakeholders.

Practical implications

The outcome of this study presents a roadmap for stakeholders in the construction industry with the requisite knowledge of the critical factors leading to the failure of JVs, consequently providing a clear path for the successful delivery of JV mandates.

Originality/value

Evidence from literature suggests that several studies have been conducted on the various aspects of JVs in the South African construction industry; however, none has focused on the leading factors attributed to the failure of JVs. Also, the findings of this study cultivate a good theoretical platform for future studies on JVs.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 December 2022

Qing-Wen Zhang, Pin-Chao Liao, Mingxuan Liang and Albert P.C. Chan

Quality failures in grid infrastructure construction would cause large-scale collapses in power supply and additional expenditures by reworks and repairs. Learning from quality…

Abstract

Purpose

Quality failures in grid infrastructure construction would cause large-scale collapses in power supply and additional expenditures by reworks and repairs. Learning from quality failures (LFQF) extracts experience from previous quality events and converts them into preventive measures to reduce or eliminate future construction quality issues. This study aims to investigate the influence factors of LFQF in the construction of grid infrastructure.

Design/methodology/approach

The related factors of LFQF, including quality management (QM) practices, quality rectification, and individual learning, were identified by reviewing literature about organizational learning and extracting experience from previous failures. A questionnaire survey was distributed to the grid companies in North, Northeast, Northwest, East, Central, and Southwest China. 381 valid responses collected and analyzed using structural equation modeling (SEM) to test the influence of these factors on LFQF.

Findings

The SEM results support that QM practices positively affect individual learning and LFQF. Quality rectification indirectly impacts LFQF via individual learning, while the results did not support the direct link between quality rectification and LFQF.

Practical implications

The findings strengthen practical insights into extracting experience from poor-quality issues and continuous improvement. The contributory factors of LFQF found in this study benefit the practitioners by taking effective measures to enhance organizational learning capability and improve the long-term construction quality performance in the grid infrastructure industry.

Originality/value

Existing research about the application of LFQF still stays at the explorative and conceptual stage. This study investigates the related factors of LFQF, including QM practices, quality rectification, and individual learning, extending the model development of learning from failures (LFF) in construction QM.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Gavin Ford and Jonathan Gosling

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through…

Abstract

Purpose

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through quantitative research over the years to understand why the industry continues to see similar issues of failure. Some scholars have reported rework figures as high as 12.6% of total contract value, highlighting major concerns of the sustainability of construction projects. Separately, however, there have been few studies that explore and detail the views of industry professions who are caught in the middle of quality issues, to understand their perceptions of where the industry is failing. As such, this paper interrogates qualitative data (open-ended questions) on the topic of nonconformance and rework in construction to understand what industry professionals believe are the causes and suggested improvement areas.

Design/methodology/approach

A qualitative approach is adopted for this research. An industry survey consisting of seven open-ended questions is presented to two professional working groups within a Tier 1 contractor, and outputs are analysed using statistic software (NVivo 12) to identify prominent themes for discussion. Inductive analysis is undertaken to gain further insight into responses to yield recurrent areas for continuous improvement.

Findings

Qualitative analysis of the survey reveals a persistent prioritisation of cost and programme over quality management in construction project. Furthermore, feedback from construction professionals present a number of improvement areas that must be addressed to improve quality. These include increased training and competency investment, overhauling quality behaviours, providing greater quality leadership direction and reshaping the way clients govern schemes.

Research limitations/implications

There are limitations to this paper that require noting. Firstly, the survey was conducted within one principal contractor with varying levels of knowledge across multiple sectors. Secondly, the case study was from one major highways scheme; therefore, the generalisability of the findings is limited. It is suggested that a similar exercise is undertaken in other sectors to uncover similar improvement avenues.

Practical implications

The implications of this study calls for quality to be re-evaluated at project, company, sector and government levels to overhaul how quality is delivered. Furthermore, the paper identifies critical learning outcomes for the construction sector to take forward, including the need to reassess projects to ensure they are appropriately equip with competent personnel under a vetted, progressive training programme, share collaborative behaviours that value quality delivery on an equal standing to safety, programme and cost and tackle the inappropriate resource dilemmas projects finding themselves in through clear tendering and accurate planning. In addition, before making erratic decisions, projects must assess the risk profiling of proceed without approved design details and include the client in the decision-making process. Moreover, the findings call for a greater collaborative environment between the construction team and quality management department, rather than being seen as obstructive (i.e. compliance based policing). All of these must be driven by leadership to overhaul the way quality is managed on schemes. The findings demonstrate the importance and impact from open-ended survey response data studies to enhance quantitative outcomes and help provide strengthened proposals of improvement.

Originality/value

This paper addresses the highly sensitive area of quality failure outcomes and interrogates them via an industry survey within a major UK contractor for feedback. Unique insights are gained into how industry professionals perceive quality in construction. From previous research, this has been largely missing and offers a valuable addition in understanding the “quality status quo” from those delivering schemes.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

1 – 10 of 862