Search results

1 – 5 of 5
Book part
Publication date: 4 December 2023

Asad Abbas, Hussein Haruna, Anil Yasin Ar and Danica Radovanović

The 17 Sustainable Development Goals (SDGs) of the United Nations (UN) gained attention, particularly SDG 4 which focuses on quality education. Tecnologico de Monterrey, popularly…

Abstract

The 17 Sustainable Development Goals (SDGs) of the United Nations (UN) gained attention, particularly SDG 4 which focuses on quality education. Tecnologico de Monterrey, popularly known as TEC, is one of the few elite private universities in Mexico that took significant steps to enhance the quality of education amidst the COVID-19 pandemic, in view of students’ career plans. In this empirical research, an online survey was employed to investigate the mediating role of peers’ feedback on team-based learning (TBL) and career planning skills among university students. The study included 86 students from bachelor’s and master’s programmes. IBM SPSS version 26 and PROCESS Macro v 3.5 were used for the quantitative data analysis. The results confirm that peers’ feedback partially mediates the relationship between TBL and the career planning skills of students. This study provides recommendations to university authorities to develop educational policies in-line with SDG 4, thoroughly revise course curricula of the degree programmes offered, and include online learning activities for solving problems in the current world scenario.

Details

Higher Education for the Sustainable Development Goals: Bridging the Global North and South
Type: Book
ISBN: 978-1-80382-526-7

Keywords

Content available
Book part
Publication date: 4 December 2023

Abstract

Details

Higher Education for the Sustainable Development Goals: Bridging the Global North and South
Type: Book
ISBN: 978-1-80382-526-7

Article
Publication date: 14 February 2024

Haruna Musa, Nor Hayati Binti Ahmad and Alias Mat Nor

This study aims to expand the theory of planned behaviour (TPB) to understand determinants of financial inclusion participation behaviour through the mediating effect of Islamic…

Abstract

Purpose

This study aims to expand the theory of planned behaviour (TPB) to understand determinants of financial inclusion participation behaviour through the mediating effect of Islamic finance product (IFP) adoption.

Design/methodology/approach

A quantitative research design was deployed using primary data from a survey conducted within the Muslim-dominated regions in Nigeria, which was analysed using partial least squares structural equation modelling.

Findings

It was found that the original TPB variables, attitude, subjective norms, perceived behavioural control (PBC) and behavioural intention have strong positive influences on financial inclusion participation behaviour, however, among the new variables, government support and IFPs adoption directly influence, while awareness and access to banking and digital channels were not. Furthermore, IFPs adoption significantly mediates the relationship between attitude, behavioural intention, government support and access to banking and digital channels and financial inclusion participation, but it failed to mediate that of subjective norms, PBC and awareness.

Research limitations/implications

These findings imply the need to establish more Islamic financial institutions or conventional banks to introduce IFPs in Muslim-dominated regions in Nigeria, as such products are desirable in expanding financial inclusion. While such is being pursued, policymaking bodies responsible for financial inclusion should design appropriate programmes to create awareness of IFPs for expanding financial inclusion.

Originality/value

To the best of the authors’ knowledge, this study could be the first to expand the TPB by integrating IFP adoption as a mediator within the context of financial inclusion participation as well as the incorporation of awareness, government support and access to banking and digital channels as additional variables.

Details

Journal of Islamic Accounting and Business Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1759-0817

Keywords

Article
Publication date: 20 March 2023

Haruna Sa'idu Lawal, Hassan Adaviriku Ahmadu, Muhammad Abdullahi, Muhammad Aliyu Yamusa and Mustapha Abdulrazaq

This study aims to develop a building renovation duration prediction model incorporating both scope and non-scope factors.

Abstract

Purpose

This study aims to develop a building renovation duration prediction model incorporating both scope and non-scope factors.

Design/methodology/approach

The study used a questionnaire to obtain basic information relating to identified project scope factors as well as information relating to the impact of the non-scope factors on the duration of building renovation projects. The study retrieved 121 completed questionnaires from construction firms on tertiary education trust fund (TETFund) building renovation projects. Artificial neural network was then used to develop the model using 90% of the data, while mean absolute percentage error was used to validate the model using the remaining 10% of the data.

Findings

Two artificial neural network models were developed – a multilayer perceptron (MLP) and a radial basis function (RBF) model. The accuracy of the models was 86% and 80%, respectively. The developed models’ predictions were not statistically different from those of actual duration estimates with less than 20% error margin. Also, the study found that MLP models are more accurate than RBF models.

Research limitations/implications

The developed models are only applicable to projects that suit the characteristics and nature of the data used to develop the models. Hence, models can only predict the duration of building renovation projects.

Practical implications

The developed models are expected to serve as a tool for realistic estimation of the duration of building renovation projects and thus, help construction project managers to effectively plan and manage it.

Social implications

The developed models are expected to serve as a tool for realistic estimation of the duration of building renovation projects and thus, help construction project managers to effectively plan and manage it; it also helps clients to effectively benchmark projects duration and contractors to accurately estimate duration at tendering stage.

Originality/value

The study presents models that combine both scope and non-scope factors in predicting the duration of building renovation projects so as to ensure more realistic predictions.

Details

Journal of Financial Management of Property and Construction , vol. 28 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 3 November 2022

Bruno Lot Tanko, Wyom Paul Zakka and Wee Nie Heng

The purpose of this study is to explore existing literature on Building Information Modelling (BIM) in Malaysia and examine the perception of practitioners about the potential of…

559

Abstract

Purpose

The purpose of this study is to explore existing literature on Building Information Modelling (BIM) in Malaysia and examine the perception of practitioners about the potential of BIM applications in reducing construction waste and enhancing productivity.

Design/methodology/approach

First, using 244 bibliographic data extracted from the Scopus database, the paper used scientometric analysis and VOSviewer mapping technique to assess the most impactful publication literature on BIM in Malaysia to identify the existing research gaps. Second, using a structured questionnaire, a total of 100 questionnaires were distributed to practising practitioners who incorporate BIM in the delivery of their projects. Descriptive analysis using cross-tabulation in SPSS software, radar chart, relative importance index and Pearson’s correlation were used to analyze the data.

Findings

The research gaps are in the fields of construction projects, buildings, energy efficiency, lifecycle and housing. The findings of the survey indicate that quantity take-off, clash detection, site utilization planning, digital fabrication as well as 4D stimulation were the main BIM applications used among the practitioners in Johor and Selangor.

Practical implications

By assessing the state-of-the-art of BIM and BIM applications in this region, the practical implications of this study provide useful insights to construction stakeholders, funding organizations, policymakers, research institutions, professionals, journal editors, reviewers and researchers to understand the overall trend of BIM in Malaysia and its usage.

Originality/value

This paper is the first to use science mapping using scientometrics to reveal the current BIM research in “Malaysia only”. Relying on the identified gaps, the study further examined the usage of BIM applications in Malaysian construction projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988