Search results

11 – 20 of over 2000
Article
Publication date: 23 March 2021

Sy Tien Do, Viet Thanh Nguyen and Chau Ngoc Dang

This study aims to discover the impact of failure factors on stakeholder coordination performance (SCP) in the finishing phase of high-rise building projects.

674

Abstract

Purpose

This study aims to discover the impact of failure factors on stakeholder coordination performance (SCP) in the finishing phase of high-rise building projects.

Design/methodology/approach

Firstly, this study identifies potential failure factors affecting coordination performance as well as criteria for measuring SCP in the finishing phase of high-rise building projects. Afterwards, a survey questionnaire is designed to collect data from high-rise building projects in Vietnam. Using the factor analysis method, the study discovers the failure constructs. A structural equation model is then built to uncover the relationships between failure constructs and SCP.

Findings

The study identified four failure constructs which could significantly affect SCP, namely traditional adversarial relationship (TAR), incompetent parties (IP), poor project planning and organization (PPO) and delays of parties toward construction works (DP). The developed model indicated that TAR, PPO and IP significantly affected stakeholders' coordination performance in the finishing phase of high-rise building projects.

Originality/value

The results of the study fill the gap in knowledge by discovering the causal relationships between failure constructs and SCP in high-rise building projects. The results might provide an initial guideline for stakeholders during the finishing phase of high-rise building projects to enhance their coordination performance.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 June 2021

Zhiqian Zhang, Wei Pan and Mi Pan

Modular integrated construction (MiC) is the most advanced off-site construction technology. However, the application of MiC for high-rise buildings is still limited and…

Abstract

Purpose

Modular integrated construction (MiC) is the most advanced off-site construction technology. However, the application of MiC for high-rise buildings is still limited and challenging. One critical issue is tower crane layout planning (TCLP) to guarantee safe and efficient multiple crane-lifts for module installation, which, however, has been insufficiently explored. For filling this knowledge gap, this paper aims to systematically explore the critical considerations on TCLP for high-rise MiC to support contractors in determining the optimal crane layout plan.

Design/methodology/approach

This study employed a multimethod strategy. First, previous studies on TCLP and critical features of MiC were reviewed to develop a conceptual model of TCLP considerations. Second, expert interviews with 15 construction planners were conducted to identify the critical TCLP considerations for high-rise MiC. Third, a multicase study with three high-rise MiC projects was undertaken to demonstrate and verify the identified considerations.

Findings

The paper characterises critical considerations on TCLP as performance criteria and influencing factors and identifies 7 critical performance criteria and 25 influencing factors for high-rise MiC. Specifically, the features of MiC (e.g. various modularised layout design, heavyweight and large size of modules) were found to significantly affect the crane layout performance (i.e. technical feasibility, safety and economic efficiency).

Originality/value

The paper is the first-of-its-kind study on crane layout planning for high-rise modular buildings, which contributes a two-stage multicriteria decision-making framework integrated with systematic TCLP considerations. The findings should help contractors determine safe and efficient tower crane layout plans for high-rise MiC projects.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 January 2020

B.A.K.S. Perera, Aravindi Lavanya Samarakkody and Shyamani Ruwanthika Nandasena

The financial and economic risks associated with high-rise building projects are many. They make project stakeholders to undergo financial difficulties. However, very few past…

Abstract

Purpose

The financial and economic risks associated with high-rise building projects are many. They make project stakeholders to undergo financial difficulties. However, very few past studies have discussed the management of these risks. Thus, the purpose of this paper is to provide a guideline for the effective management of these financial and economic risks associated with high-rise apartment building projects in Sri Lanka.

Design/methodology/approach

The study adopted the mixed research approach. A literature review and semi-structured interviews were used to identify the financial/economic risk factors of high-rise apartment building projects and their risk response measures. The data obtained were used for a questionnaire survey, and the findings were analysed using the mean score method. They were validated using pattern matching. The risk response measures that were identified were ranked according to their effectiveness.

Findings

The findings revealed that “financial problems arising from errors in estimating” is the most significant financial and economic risk factor faced by the property developers involved in high-rise apartment building projects, while “poor contract management” is the most significant financial and economic risk factor faced by the contractors of these projects.

Originality/value

The study recommends a guideline to manage, using effective risk response measures, the financial and economic risk factors that are significant in high-rise apartment building projects.

Details

Journal of Financial Management of Property and Construction , vol. 25 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 11 July 2016

Paul van Soomeren, Willemijn van de Klundert, Inés Aquilué and Justin de Kleuver

All over the world, millions of people live in buildings and neighbourhoods that follow the principles of Congrès International d’Architecture Moderne (CIAM) and Le Corbusier…

572

Abstract

Purpose

All over the world, millions of people live in buildings and neighbourhoods that follow the principles of Congrès International d’Architecture Moderne (CIAM) and Le Corbusier: high-rise “residential machines” in parks reminiscent of green seas. Some of these have become very successful living environments, but in Europe and the USA, several neighbourhoods featuring this architectural design dream have become a social nightmare. Residents who were able to moved to more desirable neighbourhoods. This led to a high level of vacancy and crime and fear of crime have flourished, resulting in a stigma that is often long-lasting and difficult to repair. The pupose of this study is to learn from these experiences.

Design/methodology/approach

In this paper, two high-rise neighbourhoods, built in a Corbusier-like fashion and situated on the outskirts of major cities, are put under the evaluation spotlight: Bijlmermeer: located in Amsterdam, The Netherlands, with an abundance of landscaping, shrubbery, green fields and one high-density neighbourhood; and Bellvitge: located in Barcelona, Cataluña, Spain, looking less like a park and more like a city with open-air parking on ground level, and many small shops, bars and restaurants.

Findings

Both neighbourhoods faced enormous problems from crime, incivilities, disorder and drug abuse. Fear of crime and feelings of insecurity were high. Both governments reacted by investing huge sums of money. In Bellvitge, the investment was mainly in public transport, the public domain and new approaches in policing while keeping the high-rise buildings intact. In Bijlmermeer, a large regeneration project supported the demolition of two-thirds of all apartments and the neighbourhood was rebuilt in a low-rise fashion.

Research limitations/implications

This paper outlines the history of both neighbourhoods and describes the solutions that were implemented. Important lessons can be learned regarding current high-rise neighbourhoods and about the learning capacity of urban designers and planners regarding urban management.

Practical implications

The paper suggests that urban planners, designers and managers are slow in learning from earlier mistakes. The hypothesis is that there is no clear method available to evaluate new urban planning designs by incorporating lessons from the success or failure of previous cases. This paper focuses on density, ownership and design to identify possible approaches to evaluate new high-rise estate plans.

Originality/value

The Western high-rise “wave” has faded away but nowadays has become a high-rise “tsunami” in Asia. Learning from European experience may be beneficial.

Details

Journal of Place Management and Development, vol. 9 no. 2
Type: Research Article
ISSN: 1753-8335

Keywords

Book part
Publication date: 25 April 2022

Ainarull Assikin Abdul Hadi, Syuhaida Ismail, Nur Izzati Ab Rani and Nur Fatin Syazwani Abu Bakar

In Malaysia, there seems to be no mutual and general agreement among construction industry players and researchers on what the critical success factors (CSFs) of construction

Abstract

In Malaysia, there seems to be no mutual and general agreement among construction industry players and researchers on what the critical success factors (CSFs) of construction projects are since characteristics of construction projects vary across various projects complexity. This chapter thus examines the CSFs for affordable high-rise public housing projects in Malaysia through a thorough review of the literature on the CSFs, which were then contextually customised via a pilot study and presented in the form of Relative Importance Index (RII). Primary data were collected via administration of questionnaire surveys to 170 construction stakeholders of affordable high-rise public housing projects in Malaysia. The findings of this study revealed that the top 10 ranks are good management and supervision at site, good personal behaviour by all participants, good implementation in safety management and practice, high commitment in quality control by management, competent manager/supervisor, good communication and coordination, good and enough material and equipment, experience worker, clear objective and goals and good support by senior employee/management, whereby it is crucial in ensuring the project success of affordable high-rise public housing projects in Malaysia. This chapter provides clear guidelines for the contractors of affordable high-rise public housing projects to be more competitive in the construction industry by illustrating the important factors to be considered while delivering the projects to their respective clients.

Details

Sustainability Management Strategies and Impact in Developing Countries
Type: Book
ISBN: 978-1-80262-450-2

Keywords

Book part
Publication date: 5 June 2023

Kheir Al-Kodmany

This chapter outlines complex and conflicting issues related to designing tall buildings. It gathers a vast amount of fragmented criticism and concerns and organizes them around…

Abstract

This chapter outlines complex and conflicting issues related to designing tall buildings. It gathers a vast amount of fragmented criticism and concerns and organizes them around the three pillars of sustainability: social, economic, and environmental. Mapping out the “unsustainable” aspects forms the foundation for addressing them in future research and tall building developments. The chapter engages the reader with a preliminary discussion on potential solutions to the outlined problems. It also balances extensive criticism by highlighting the virtues and advantages of tall buildings. Consequently, this chapter forms a foundation for improving the sustainability of tall buildings whenever and wherever they are constructed.

Details

Pragmatic Engineering and Lifestyle
Type: Book
ISBN: 978-1-80262-997-2

Keywords

Article
Publication date: 13 November 2023

Thisara Manupriya Sathkumara, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

The use of renewable energy has become necessary because of the harmful effects of current energy sources on the environment, limited availability and financial crisis…

Abstract

Purpose

The use of renewable energy has become necessary because of the harmful effects of current energy sources on the environment, limited availability and financial crisis. Transparent solar panels have emerged as a promising technology for integrating renewable energy generation into building structures. Therefore, this paper aims to explore the feasibility of transparent solar panels for high-rise building façades in Sri Lanka.

Design/methodology/approach

The research apprehended a qualitative approach, including two expert interview rounds adhering to the Delphi technique with 17 and 15 experts each per round. Manual content analysis was incorporated to analyse the collected data.

Findings

Regarding operation and maintenance, the study emphasizes the importance of regular inspection, cleaning and repair of transparent solar panels to ensure optimal performance and longevity. These activities contribute to maximizing energy generation and maintaining the aesthetic appeal of the building. The benefits of implementing transparent solar panels on building façades are manifold. They include renewable energy generation, reduced greenhouse gas emissions, improved energy efficiency and enhanced architectural aesthetics. Furthermore, the research findings underscore the potential of transparent solar panels to contribute to Sri Lanka’s sustainable development goals and address the country’s increasing energy demand. However, the study also identifies challenges that need to be addressed for successful implementation.

Originality/value

This study contributes to understanding the feasibility of transparent solar panels for high-rise building façades in Sri Lanka. The research findings offer valuable insights into the operation and maintenance aspects, benefits, challenges and strategies for implementing transparent solar panels effectively. This knowledge can guide policymakers, architects and developers in making informed decisions regarding the integration of transparent solar panels, thereby promoting sustainable and energy-efficient building practices in Sri Lanka.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 17 May 2023

Hong Kok Wang, Cheong Peng Au-Yong, Gabriel Hoh Teck Ling and Kian Aun Law

Under Malaysian Law, the maintenance and management of common property have traditionally been viewed as insoluble challenges in the self-organisational efforts for high-rise

Abstract

Purpose

Under Malaysian Law, the maintenance and management of common property have traditionally been viewed as insoluble challenges in the self-organisational efforts for high-rise low-cost housing developments. As the population increases, more shared resources become heavily exploited with few willing to contribute towards the sustainability of resources. Many researchers argued a better way would be to convert these shared resources into a private or state-managed entity. Hence, with that assumption, this paper aims to examine how better physical characteristics can result in greater collective action.

Design/methodology/approach

This research paper adopted a quantitative method approach to determine how the standard of physical characteristics influenced the quality of collective action in high-rise low-cost housing. The method included a questionnaire survey of 519 parcel holders chosen via stratified purposeful random sampling from four high-rise low-cost housing areas.

Findings

The paper found a positive correlation between the quality of physical characteristics and the collective action gained. The findings highlighted that the standard of workmanship of high-rise low-cost units (including the common properties), the crime rate in the neighbourhood and the condition of lift systems – when improved – were significant positive predictors of collective action.

Practical implications

Housing developers should pay attention to the quality of both low-cost units and related common properties, as this endeavour will assist greatly in future collective action management.

Originality/value

The study was justified in terms of its originality as few research studies adopted the social-ecological system framework that focused on the correlation between the quality of physical characteristics and the collective action of parcel holders.

Details

Facilities , vol. 41 no. 9/10
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 18 April 2023

Wajiha Mohsin Shahzad, Siddenki Mahender Reddy, Ravindu Kahandawa and James Olabode Bamidele Rotimi

The ascendancy of modular offsite construction (MOSC) over traditional construction methods is well known. Despite the known potential of this construction approach, its adoption…

Abstract

Purpose

The ascendancy of modular offsite construction (MOSC) over traditional construction methods is well known. Despite the known potential of this construction approach, its adoption is minimal in New Zealand construction industry. This article investigates the potential benefits of using MOSC for delivery of high-rise buildings in New Zealand, underlying factors responsible for its low uptake and the measures that can facilitate its improved uptake.

Design/methodology/approach

This study utilised a mixed research approach. An empirical questionnaire survey was carried out with New Zealand construction industry professionals with expertise in MOSC. Factor analysis of survey data was carried out using SPSS software. Semi-structured interviews were carried out with subject matter experts to get further insights and expand the survey findings. Interview data were analysed using thematic analysis.

Findings

Study identified benefits of MOSC, thus establishing potential of its uptake for high-rise building construction. Constraining factors were investigated, most pronounced being low level of skills in construction industry to design, manufacture and integrate supply chain of MOSC, high initial investment, high cost of importing modules and negative perception about offsite manufactured buildings. This study also highlighted the enablers to improve uptake of MOSC. These enablers included; loan and mortgage policies to suit MOSC paradigm, building regulations to support OSC industry, increased support from the government and awareness and acceptance of standardised building designs among the clients.

Originality/value

Originality of this paper harps from little to no research carried out to investigate use of MOSC for high-rise buildings in New Zealand context.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 January 2021

Seyed Yaser Mousavi and Shahab Kariminia

The main purpose of this research is to achieve the evacuation strategy of people in high-rise office buildings. This purpose is achieved by identifying the individuals' behaviors…

Abstract

Purpose

The main purpose of this research is to achieve the evacuation strategy of people in high-rise office buildings. This purpose is achieved by identifying the individuals' behaviors during a fire accident and the relationship between these behaviors and their risk perception.

Design/methodology/approach

The method of this study is mixed-methods type. The first stage was carried out using the qualitative method and descriptive phenomenology and the analyses were done using the Colaizzi method, and the second stage was carried out using the quantitative method of field descriptive survey type whose analyses were conducted through SPSS software.

Findings

The results reveal that the individuals attempting evacuation from the upper floors above the fire level were mostly injured and the ones who remained in the building and got help from fire fighters were rescued. At the end, the study goes on to suggest the stay-in-place approach with regards to the behaviors formed in individuals, closed plan of architectural design, lack of suitable fire extinguishers as well as inappropriate individual trainings.

Research limitations/implications

Lack of similar research in the field of fire in Iran caused bottlenecks such as lack of cooperation of relevant organizations in the path of the research. Another factor that limited the present research was the determination of people trapped in fire. In this case, those who were present in the incident had to be chosen and the questionnaire was completed based on their opinions. This limited the research for reasons such as the relocation of some people from buildings or their death.

Practical implications

The practical results of this research can be used in reviewing the rules and regulations of high-rise building fire code. By properly compiling the regulations of high-rise building codes based on this research, human injuries in fire hazards can be greatly prevented. Due to the collapse of the Plasco building in Iran and the creation of inappropriate memories in the minds of people of high-rise buildings, with the construction of buildings based on the rules and regulations in accordance with the fire code, the construction market as well as the sale and purchase of such buildings will flourish and numerous financial and job turnovers are created in the field of this type of buildings.

Originality/value

This study is innovative in determining appropriate evacuation strategy that are related to the individuals' risk perception in high-rise buildings, as well as achieving results to review the rules and regulations of high-rise office buildings based on the high-rise building fire code.

Details

International Journal of Building Pathology and Adaptation, vol. 40 no. 4
Type: Research Article
ISSN: 2398-4708

Keywords

11 – 20 of over 2000