Search results

1 – 10 of 251
Article
Publication date: 6 October 2023

Edward Ayebeng Botchway, Kofi Agyekum, Judith Amudjie and Hayford Pittri

This study aims to explore occupants’ perceived importance and satisfaction with high-rise students’ housing facilities’ fire safety considerations (FSCs). The specific objectives…

Abstract

Purpose

This study aims to explore occupants’ perceived importance and satisfaction with high-rise students’ housing facilities’ fire safety considerations (FSCs). The specific objectives are to explore the FSCs for high-rise students’ housing facilities and assess the level of importance and satisfaction with the FSCs provided in high-rise students’ housing facilities in controlling fire outbreaks.

Design/methodology/approach

The study uses an exploratory sequential design with an initial qualitative phase followed by a quantitative data collection phase. Twenty FSCs were identified through the qualitative phase via semistructured interviews. Their importance and satisfaction were revealed through survey questionnaires with 168 respondents who stayed in or were involved in the operation of high-rise students’ housing facilities. Data from the qualitative phase were analyzed thematically, and those obtained from the quantitative phase were analyzed descriptively and inferentially.

Findings

The study’s findings revealed that all the 20 FSCs identified via the qualitative phase and confirmed through the quantitative phase were perceived to be very important in fighting fires in high-rise students’ housing facilities. However, only 9 out of the 20 FSCs received some satisfaction among the respondents in fighting fires in the facilities.

Originality/value

This study offers insight into a rare study area, especially in sub-Saharan Africa. In addition, it grants insight into the occupants’ perspective regarding which FSCs they consider essential and their level of satisfaction with such FSCs in fighting fires in high-rise students’ housing facilities.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 13 November 2023

Thisara Manupriya Sathkumara, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

The use of renewable energy has become necessary because of the harmful effects of current energy sources on the environment, limited availability and financial crisis…

Abstract

Purpose

The use of renewable energy has become necessary because of the harmful effects of current energy sources on the environment, limited availability and financial crisis. Transparent solar panels have emerged as a promising technology for integrating renewable energy generation into building structures. Therefore, this paper aims to explore the feasibility of transparent solar panels for high-rise building façades in Sri Lanka.

Design/methodology/approach

The research apprehended a qualitative approach, including two expert interview rounds adhering to the Delphi technique with 17 and 15 experts each per round. Manual content analysis was incorporated to analyse the collected data.

Findings

Regarding operation and maintenance, the study emphasizes the importance of regular inspection, cleaning and repair of transparent solar panels to ensure optimal performance and longevity. These activities contribute to maximizing energy generation and maintaining the aesthetic appeal of the building. The benefits of implementing transparent solar panels on building façades are manifold. They include renewable energy generation, reduced greenhouse gas emissions, improved energy efficiency and enhanced architectural aesthetics. Furthermore, the research findings underscore the potential of transparent solar panels to contribute to Sri Lanka’s sustainable development goals and address the country’s increasing energy demand. However, the study also identifies challenges that need to be addressed for successful implementation.

Originality/value

This study contributes to understanding the feasibility of transparent solar panels for high-rise building façades in Sri Lanka. The research findings offer valuable insights into the operation and maintenance aspects, benefits, challenges and strategies for implementing transparent solar panels effectively. This knowledge can guide policymakers, architects and developers in making informed decisions regarding the integration of transparent solar panels, thereby promoting sustainable and energy-efficient building practices in Sri Lanka.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 18 April 2023

Wajiha Mohsin Shahzad, Siddenki Mahender Reddy, Ravindu Kahandawa and James Olabode Bamidele Rotimi

The ascendancy of modular offsite construction (MOSC) over traditional construction methods is well known. Despite the known potential of this construction approach, its adoption…

Abstract

Purpose

The ascendancy of modular offsite construction (MOSC) over traditional construction methods is well known. Despite the known potential of this construction approach, its adoption is minimal in New Zealand construction industry. This article investigates the potential benefits of using MOSC for delivery of high-rise buildings in New Zealand, underlying factors responsible for its low uptake and the measures that can facilitate its improved uptake.

Design/methodology/approach

This study utilised a mixed research approach. An empirical questionnaire survey was carried out with New Zealand construction industry professionals with expertise in MOSC. Factor analysis of survey data was carried out using SPSS software. Semi-structured interviews were carried out with subject matter experts to get further insights and expand the survey findings. Interview data were analysed using thematic analysis.

Findings

Study identified benefits of MOSC, thus establishing potential of its uptake for high-rise building construction. Constraining factors were investigated, most pronounced being low level of skills in construction industry to design, manufacture and integrate supply chain of MOSC, high initial investment, high cost of importing modules and negative perception about offsite manufactured buildings. This study also highlighted the enablers to improve uptake of MOSC. These enablers included; loan and mortgage policies to suit MOSC paradigm, building regulations to support OSC industry, increased support from the government and awareness and acceptance of standardised building designs among the clients.

Originality/value

Originality of this paper harps from little to no research carried out to investigate use of MOSC for high-rise buildings in New Zealand context.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 January 2022

The-Quan Nguyen, Eric C.W. Lou and Bao Ngoc Nguyen

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers…

Abstract

Purpose

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers for the following questions: (1) When to start the QTO processes to facilitate the contract progress payments? (2) What information is required to measure the quantity of works to estimate contract progress payment (3) What are the challenges to manage (i.e. create, store, update and exploit)? What are the required information for this BIM use? and (4) How to process the information to deliver BIM-based QTO to facilitate contract progress payment?

Design/methodology/approach

The paper applied a deductive approach and expert consensus through a Delphi procedure to adapt to current innovation around BIM-based QTO. Starting with a literature review, it then discusses current practices in BIM-based QTO in general and high-rise building projects in particular. Challenges were compiled from the previous studies for references for BIM-based QTO to facilitate contract progress payment for high-rise building projects in Vietnam. A framework was developed considering a standard information management process throughout the construction lifecycle, when the BIM use of this study is delivered. The framework was validated with Delphi technique.

Findings

Four major challenges for BIM-based QTO discovered: new types of information required for the BIM model, changes and updates as projects progress, low interoperability between BIM model and estimation software, potentiality of low productivity and accuracy in data entry. Required information for QTO to facilitate progress payments in high-rise building projects include Object Geometric/Appearance Information, Structural Components' Definition and Contextual Information. Trade-offs between “Speed – Level of Detail–Applicable Breadth” and “Quality – Productivity” are proposed to consider the information amount to input at a time when creating/updating BIM objects. Interoperability check needed for creating, authoring/updating processing the BIM model's objects.

Research limitations/implications

This paper is not flawless. The first limitation lies in that the theoretical framework was established only based on desk research and small number of expert judgment. Further primary data collection would be needed to determine exactly how the framework underlies widespread practices. Secondly, this study only discussed the quantity take-off specifically for contract progress payment, but not for other purposes or broader BIM uses. Further research in this field would be of great help in developing a standard protocol for automatic quantity surveying system in Vietnam.

Originality/value

A new theoretical framework for BIM-based QTO validated with Delphi technique to facilitate progress payments for high-rise building projects, considering all information management stages and the phases of information development in the project lifecycle. The framework identified four types of information required for this QTO, detailed considerations for strategies (Library Objects Development, BIM Objects Information Declaration, BIM-based QTO) for better managing the information for this BIM use. Two trade-offs of “Speed – LOD–Applicable Breadth” and “Quality – Productivity” have been proposed for facilitating the strategies and also for enhancing the total efficiency and effectiveness of the QTO process.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 12 January 2024

Zeynep Yeşim İlerisoy and Berru İzel Gökgöz

The objective of this study is to investigate the concept of “earthquake resistance” in high-rise buildings and assess the current level of structural strength in the areas where…

Abstract

Purpose

The objective of this study is to investigate the concept of “earthquake resistance” in high-rise buildings and assess the current level of structural strength in the areas where these structures are situated. The study aims to identify and implement necessary measures to enhance resilience in these areas. A comprehensive literature review was conducted to develop a conceptual framework focusing on earthquake resistance's meanings, stages and physical elements to achieve these goals.

Design/methodology/approach

This study focuses on Istanbul, a city known for its high earthquake risk, specifically targeting the Atasehir district. The research utilizes the DEMATEL (Decision-Making Trial and Evaluation Laboratory) method to evaluate urban resilience parameters. Additionally, the Fuzzy TOPSIS (Preference Ranking Technique by Similarity) method is employed to analyze the location of five buildings in Atasehir, using criterion weights derived from this methodology.

Findings

The findings indicate that resilience varies depending on the distance of the buffers. Moreover, the amount and quality of urban equipment in the study areas have a significant impact on the earthquake resistance level of the surrounding areas where high-rise buildings are situated. Building upon this analysis, the study suggests the implementation of measures aimed at augmenting the quantity and quality of urban facilities in the study areas, consequently enhancing urban resilience.

Originality/value

The originality and value of this study lie in its examination of seismic resilience within the context of high-rise buildings and the identification of necessary measures to increase resilience in areas where these structures are prevalent. By focusing on Istanbul, a city with a high earthquake risk, and specifically selecting the Atasehir district as the study area, this research provides a comprehensive conceptual framework for understanding urban resilience and its physical components. Moreover, the study offers a fresh perspective on urban resilience by highlighting the influence of tall buildings on the surrounding areas. Ultimately, it provides practical recommendations for architects, urban planners and other stakeholders to improve regional earthquake resilience.

Details

Open House International, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0168-2601

Keywords

Article
Publication date: 16 May 2023

Nandun Madhusanka Hewa Welege, Wei Pan and Mohan Kumaraswamy

Despite carbon reduction commitments, many constraints hinder the delivery of low-carbon buildings (LCBs) in high-rise high-density cities. The collaborative commitment of…

Abstract

Purpose

Despite carbon reduction commitments, many constraints hinder the delivery of low-carbon buildings (LCBs) in high-rise high-density cities. The collaborative commitment of relevant stakeholders is vital to effectively address and mitigate these constraints. Hence, this study aims to comprehensively explore the required stakeholder collaboration attributes to address and mitigate the “common” constraints of delivering LCBs by focussing on several high-rise high-density cities.

Design/methodology/approach

A list of 21 “significant and common” constraints was identified through a systematic literature review followed by a questionnaire survey covering five economies (Hong Kong, Singapore, Australia, Qatar and the UAE). Nineteen influential stakeholders/stakeholder categories were identified through the literature, and their ability to influence the 21 constraints was mapped and identified through a two-round Delphi survey of 15 experienced professionals. The Delphi survey findings were analysed through social network analysis (SNA) methods to assess the stakeholder engagement and collaboration attributes.

Findings

The SNA results revealed the ability of stakeholders to influence the constraints, required collaborative stakeholder networks to address the constraints, significance of stakeholders according to the SNA centrality measures, core and periphery stakeholders and individual co-affiliation networks of core stakeholders.

Originality/value

While achieving the planned primary target of exploring stakeholder collaboration and their significance through SNA, this study also presents a useful sequential methodological approach for future researchers to conduct similar studies in different contexts. The findings also provide a foundation for accelerating the delivery of LCBs by strengthening stakeholder collaboration.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 February 2023

Vidya Umakant Khanapure and Sameer S. Shastri

The importance of lean and sustainability integration in sustainable construction (SC) has been extensively studied. However, a practical and thorough implementation methodology…

Abstract

Purpose

The importance of lean and sustainability integration in sustainable construction (SC) has been extensively studied. However, a practical and thorough implementation methodology addressing the project life cycle phases is still inadequate. The present study has developed a novel phase-wise sustainable–lean implementation methodology for high-rise residential projects.

Design/methodology/approach

The current study has identified the 50 direct conceptual interactions between 11 lean principles and 11 sustainability criteria encompassing 44 different attributes covering 174 sustainability actions. A panel of nine experts validated these interactions, and 50 integration vectors were proposed addressing different phases of the project life cycle of high-rise residential buildings. The experts also analysed the identified integration vectors for their current and likely future implementation in high-rise residential projects.

Findings

The interactions between lean and sustainability principles led to the development of a phase-wise implementation methodology. The experts' survey responses on the current level of implementation revealed that 40, 32 and 28% of integration vectors were implemented rarely, sometimes, and frequently, respectively. For likely future implementation, 28 and 72% integration vectors were reported as very likely and extremely likely to implement, respectively. This survey response highlighted the usefulness of identified integration vectors for enhancing the sustainability of high-rise residential projects.

Originality/value

The proposed sustainable–lean implementation methodology acts as a comprehensive guideline for implementing a lean approach to achieve the objectives of SC in high-rise residential projects. This may facilitate the transition from conventional to sustainable building practices using a lean approach.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 January 2024

Mazen M. Omer, Tirivavi Moyo, Ahmad Rizal Alias and Rahimi A. Rahman

This study aims to develop workplace well-being indexes for construction sites of different project types (infrastructure, high-rise and low-rise). Accordingly, the study…

Abstract

Purpose

This study aims to develop workplace well-being indexes for construction sites of different project types (infrastructure, high-rise and low-rise). Accordingly, the study objectives are to identify the critical factors that affect workplace well-being at construction sites, compare the critical factors between different project types, categorize the critical factors into subgroups and compute indexes for the critical factors and subgroups.

Design/methodology/approach

Data from a systematic literature review and semi-structured interviews with construction industry professionals were used to extract 19 potential factors that affect workplace well-being. Then, a structured questionnaire survey was distributed, and 169 valid responses were collected. Finally, the data were analyzed using normalized mean analysis, agreement analysis, factor analysis and fuzzy synthetic evaluation.

Findings

The study findings revealed that there are 11, 11, 8 and 12 critical factors across overall infrastructure, high-rise and low-rise construction projects. Out of those, six critical factors are overlapping across project types, including “general safety and health monitoring,” “salary package,” “timeline of salary payment,” “working hours,” “communication between workers” and “planning of the project.” Accordingly, the critical factors can be categorized into two subgroups within each project type. Finally, the development of indexes shows that infrastructure construction projects have the greatest index compared to other project types.

Originality/value

This study contributes to filling the current knowledge gap by developing workplace well-being indexes at construction sites across different project types. The indexes would assist decision-makers in understanding the current state of workplace well-being. This increases the commitment and recognition of well-being across different construction project types.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 13 September 2023

Arti Sahu and S. Shanmugapriya

This research proposes a viable method of slab and shore load computation for the partial striking technique utilized in high-rise construction projects to optimize the use of…

Abstract

Purpose

This research proposes a viable method of slab and shore load computation for the partial striking technique utilized in high-rise construction projects to optimize the use of horizontal formwork. The proposed Partial Striking Simplified Method (PSSM) is designed to be utilized by industry practitioners to schedule the construction operations of casting floors in order to control the formwork costs incurred throughout the completion of a project.

Design/methodology/approach

The article presents the PSSM for calculating slab and shore loads in multi-story building construction. It introduces the concept of “clearing before striking,” where shore supports are partially removed after a few days of pouring fresh concrete. The PSSM procedure is validated through numerical analysis and compared to other simplified approaches. Additionally, a user-friendly Python program based on the PSSM procedure is developed to explore the capability of the PSSM procedure and is used to study the variations in slab load, shoring level, concrete grade and cycle time.

Findings

The study successfully developed a more efficient and reliable method for estimating the loads on shores and slabs using partial striking techniques for multi-story building construction. Compared to other simplified approaches, the PSSM procedure is simpler and more precise, as demonstrated through numerical analysis. The mean of shore and slab load ratios are 1.08 and 1.07, respectively, which seems to have a slight standard deviation of 0.29 and 0.21 with 3D numerical analysis. The Python program developed for load estimation is effective in exploring the capability of the proposed PSSM procedure. The Python program's ability to identify the floor under maximum load and determine the specific construction stage provides valuable insights for multi-story construction, enabling informed decision-making and optimization of construction methods.

Practical implications

High-rise construction in Indian cities is booming, though this trend is not shared by all the country's major metropolitan areas. The growing construction sector in urban cities demands rapid construction for efficient utilization of formwork to control the construction costs of project. The proposed procedure is the best option to optimize the formwork construction cost, construction cycle time, the suitable formwork system with optimum cost, concrete grade for the adopted level of shoring in partaking and many more.

Originality/value

The proposed PSSM reduces the calculation complexity of the existing simplified method. This is done by considering the identical slab stiffness and identical shore layout for uniform load distribution throughout the structure. This procedure utilizes a two-step load distribution calculation for clearing phase. Initially, the 66% prop load of highest floor level is distributed uniformly over the lower interconnected slabs. In the second step, the total prop load is removed equally from all slabs below it. This makes the load distribution user-friendly for the industry expert.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 April 2023

Gary John Rangel, Jason Wei Jian Ng., Thangarajah Thiyagarajan Murugasu and Wai Ching Poon

The purpose of this study is to use a lifetime income measure to evaluate the long-run housing affordability for an understudied cohort of households in the literature – the…

Abstract

Purpose

The purpose of this study is to use a lifetime income measure to evaluate the long-run housing affordability for an understudied cohort of households in the literature – the millennials. The authors do this in the context of Malaysia, measuring long-run affordability for four housing types across geographic locations and income distributions.

Design/methodology/approach

This study calculates a long-run housing affordability index (HAI) using data on house prices and household incomes. Essentially a ratio of predicted lifetime incomes to house prices, the HAI is computed for four common housing types in Malaysia from 2005 to 2016 and for six states in the country. The HAI is also compared across four income percentiles.

Findings

The analysis reveals varying patterns of housing affordability among different states in Malaysia. Housing affordability has declined since 2010, with most housing types being unaffordable for millennial-led households with the lowest income. Housing is most affordable for those in the highest income bracket, although even here, there are pockets of unaffordable housing as well.

Practical implications

Based on the findings, this study proposes three targeted interventions to improve housing affordability for Malaysian millennials.

Originality/value

This study fills a gap in the literature by examining the long-run housing affordability of Malaysian millennial-led households based on both geographic location and income distribution. The millennial population is understudied in the housing affordability literature, making this study a valuable contribution to the field.

Details

International Journal of Housing Markets and Analysis, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1753-8270

Keywords

1 – 10 of 251