Search results

1 – 10 of 22
Article
Publication date: 4 July 2023

Hanyue Yang, Heng Li, Guangbin Wang and Dongping Cao

Within the labor-intensive construction industry characterized by distinctly structural shortages in the labor force worldwide, efficient and effective migration of construction…

Abstract

Purpose

Within the labor-intensive construction industry characterized by distinctly structural shortages in the labor force worldwide, efficient and effective migration of construction workers across regions is critical for the smooth operation of construction activities. This study aims to investigate how the interregional migration patterns of construction workers are impacted by the disparities in both employment opportunities and environment amenities between the origin and destination provinces.

Design/methodology/approach

Drawing on the push and pull theory and the archival data on 13,728 migrant construction workers in China, descriptive analyses are first performed to characterize the interregional migration patterns of the investigated construction workers. Combining regional data in the National Bureau of Statistics of China, this study uses hierarchical regression modeling techniques to empirically test the relative importance of the employment-related and environment-related factors in driving the interregional migration of construction workers after controlling for the effects of related economic and geographic factors.

Findings

The results provide evidence that the interregional migration of construction workers is principally driven by the disparities in employment opportunities while disparities in environment amenities (including climate comfort disparity, medical service disparity and educational service disparity) generally play much fewer substantive roles. With regard to the impacts of employment opportunities, the results provide evidence that compared with the disparity in job market size, the disparities in job income and industry development level are more significantly relevant factors, which positively pull and adversely push the interregional migration flows, respectively.

Research limitations/implications

This study contributes to a deepened understanding of how workers specifically balance their employment and amenity needs to make temporary migration decisions in the “laggard” labor-intensive construction industry. This study also adds to the literature on population migration by characterizing the specific characteristics of construction workers and the temporary nature of the workers' migration activities. The findings hold important practical implications for construction organizations and policymakers for effectively managing the mobility of migrant construction workers.

Originality/value

The extant literature on migrant construction workers has primarily focused on the consequences of international migration and the generalization of empirical findings on population migration mechanisms in other domains to the construction industry is substantially limited by the specific characteristics of construction workers and the temporary nature of their migration activities. In addressing this gap, this study represents an exploratory effort to quantitatively characterize the interregional migration patterns of construction workers in the labor-intensive construction industry and examines the roles of employment opportunity and environmental amenity in driving interregional migration.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 February 2024

Jiaqi Liu, Haitao Wen, Rong Wen, Wenjue Zhang, Yun Cui and Heng Wang

To contribute to achieving the Sustainable Development Goals, this study aims to explore how to encourage innovative green behaviors among college students and the mechanisms…

Abstract

Purpose

To contribute to achieving the Sustainable Development Goals, this study aims to explore how to encourage innovative green behaviors among college students and the mechanisms behind the formation of green innovation behavior. Specifically, this study examines the influences of schools, mentors and college students themselves.

Design/methodology/approach

A multilevel, multisource study involving 261 students from 51 groups generally supported this study’s predictions.

Findings

Proenvironmental and responsible mentors significantly predicted innovative green behavior among college students. In addition, creative motivation mediated the logical chain among green intellectual capital, emotional intelligence and green innovation behavior.

Practical implications

The study findings offer new insights into the conditions required for college students to engage in green innovation. In addition, they provide practical implications for cultivating green innovation among college students.

Originality/value

The authors proposed and tested a multilevel theory based on the ability–motivation–opportunity framework. In this model, proenvironmental and responsible mentors, green intellectual capital and emotional intelligence triggered innovative green behavior among college students through creative motivation.

Details

International Journal of Sustainability in Higher Education, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1467-6370

Keywords

Article
Publication date: 6 October 2023

Tai Wai Kwok, SiWei Chang and Heng Li

The unitized curtain wall system (UCWS), a symbol of modern architecture, is gaining popularity among prefabricated components. Previous studies have focused on both construction…

Abstract

Purpose

The unitized curtain wall system (UCWS), a symbol of modern architecture, is gaining popularity among prefabricated components. Previous studies have focused on both construction technology advances and material selection strategies to facilitate the UCWS. However, the topic of client satisfaction, which drives industry development by targeting clients' demands, has gone unnoticed. Therefore, the current study aims to investigate client satisfaction with UCWS products in Hong Kong by finding its influential factors.

Design/methodology/approach

A systematic review was employed to first identify the influential factors. A semi-structured interview was employed to validate the reliability of the extracted factors. The machine learning algorithm Extreme Gradient Boosting (XGBoost) and the Pearson correlation were then employed to rank the importance and correlation of factors based on the 1–5 Likert scale scores obtained through a questionnaire survey.

Findings

The findings revealed that “reduction in construction time” and “reduction in construction waste” are the most important factors and have a strong positive influence on client satisfaction.

Originality/value

Unlike previous studies, the present study focused on a novel research topic and introduces an objective analysis process using machine learning algorithms. The findings contribute to narrowing the knowledge gap regarding client preference for UCWS products from both individual and collaborative perspectives, providing decision-makers with an objective, quantitative and thorough reference before making investments in the curtain wall management development.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 September 2023

Xiaoying Li, Xiujuan Jin, Heng Li, Lulu Gong and Deyang Zhou

Considering the substantial benefits derived from the use of Building Information Modeling (BIM) in construction projects, governments and its related sectors have introduced…

Abstract

Purpose

Considering the substantial benefits derived from the use of Building Information Modeling (BIM) in construction projects, governments and its related sectors have introduced mandatory policies requiring the use of BIM. However, little is known about the impact of mandatory policies on BIM-based project performance. Therefore, the purpose of this paper is to provide a systematical understanding on the impact of policy interventions on the implementation practice of innovative technologies.

Design/methodology/approach

This paper utilizes the propensity score matching and difference in differences (PSM-DID) method to investigate the impact of policy interventions on BIM-based project performance. Using the panel data collected from 2015 to 2021 in the Hong Kong construction industry, this paper explores the impact of the first mandatory BIM policy on the BIM-based project performance of three key stakeholders.

Findings

The subjective BIM performance and BIM return on investment (ROI) have significantly improved after implementing the mandatory BIM policy. The promotion effect of mandatory BIM policy on BIM-based project performance gradually increases over time. Moreover, the promotion effect of mandatory BIM policy on BIM performance shows significant heterogeneity for different stakeholders and organizations of different sizes.

Originality/value

This study examined the impact of policy interventions on BIM-based project performance. The research findings can provide a holistic understanding of the potential implications of innovative mandatory policy in performance improvement and offer some constructive suggestions to policymakers and industry practitioners to promote the penetration of BIM in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 November 2023

Yanan Wang, Lee Yen Chaw, Choi-Meng Leong, Yet Mee Lim and Abdulkadir Barut

This study intends to investigate the determinants of learners' continuance intention to use massive open online courses (MOOCs) for personal or professional development.

Abstract

Purpose

This study intends to investigate the determinants of learners' continuance intention to use massive open online courses (MOOCs) for personal or professional development.

Design/methodology/approach

This study employed quantitative research design. The respondents were individual learners from six selected universities in China who used MOOCs for continuous learning. A purposive sampling technique was employed to obtain 270 valid samples. Data were analyzed and analytical outputs were produced using the techniques of Partial Least Squares Structural Equation Modeling and Importance-Performance Matrix.

Findings

Expectation confirmation was found to have a positive relationship with perceived usefulness, flow experience, learning self-efficacy and satisfaction with MOOCs. Perceived usefulness, flow experience and leaning self-efficacy were also found to have a positive relationship with MOOC satisfaction. In addition, perceived usefulness, flow experience, learning self-efficacy and MOOC satisfaction had a positive impact on continuance usage intention.

Originality/value

The outcomes of the study can serve as a practical reference for MOOC providers and decision-makers to develop relevant strategies to increase the course completion rates.

Details

International Journal of Educational Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0951-354X

Keywords

Article
Publication date: 7 September 2023

Haiyi Zong, Guangbin Wang and Dongping Cao

As the foundation of social and economic development, infrastructure development projects are characterized by large initial investment, high technical requirements and thus…

Abstract

Purpose

As the foundation of social and economic development, infrastructure development projects are characterized by large initial investment, high technical requirements and thus generally delivered through complex contractor–subcontractor collaboration chains. This study aims to characterize the complexity of collaborative networks between contractors and subcontractors for infrastructure development through comparing the structural characteristics and the formation mechanisms of contractor–subcontractor collaborative networks for the following two different types of infrastructure: public works (PWCN) owned and operated by government agencies, and public utilities (PUCN) owned and operated by nongovernment agencies.

Design/methodology/approach

Based on the method of stochastic actor-oriented models and the longitudinal dataset of National Quality Award Projects in China during 2001–2020, this study compares how the structural characteristics of project-based collaborative networks between contractors and subcontractors for the two types of projects are different and how related micro-mechanisms, including both structure-based endogenous network effects and attribute-based exogenous homophily effects (institutional, organizational and geographical homophily), collectively underpin the formation of the networks.

Findings

The empirical results provide evidence that while the two networks are both characterized by relatively low levels of network density, PWCN is more globally connected around a minority of superconnected contractors as compared with PUCN. The results further reveal that compared with PUCN, the formation of PWCN is more significantly related to the structure-based anti in-isolates effect, suggesting that PWCN is more open for new entrant subcontractors. With regard to the attribute-based homophily effects, the results provide evidence that while both significantly and positively related to the effects of organizational (same company group) and geographical homophily (same location), the formation of PWCN and PUCN is oppositely driven by the institutional homophily effect (same ownership type).

Originality/value

As an exploratory effort of using network perspective to investigate the formation mechanisms of contractor–subcontractor relationships in the infrastructure development domain, this study contributes to a network and self-organizing system view of how contractors select subcontractors in different types of infrastructure projects. The study also provides insights into how contractor–subcontractor collaborative relationships can be better manipulated to promote the development of complex infrastructure in different contexts.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 29 February 2024

Guanchen Liu, Dongdong Xu, Zifu Shen, Hongjie Xu and Liang Ding

As an advanced manufacturing method, additive manufacturing (AM) technology provides new possibilities for efficient production and design of parts. However, with the continuous…

Abstract

Purpose

As an advanced manufacturing method, additive manufacturing (AM) technology provides new possibilities for efficient production and design of parts. However, with the continuous expansion of the application of AM materials, subtractive processing has become one of the necessary steps to improve the accuracy and performance of parts. In this paper, the processing process of AM materials is discussed in depth, and the surface integrity problem caused by it is discussed.

Design/methodology/approach

Firstly, we listed and analyzed the characterization parameters of metal surface integrity and its influence on the performance of parts and then introduced the application of integrated processing of metal adding and subtracting materials and the influence of different processing forms on the surface integrity of parts. The surface of the trial-cut material is detected and analyzed, and the surface of the integrated processing of adding and subtracting materials is compared with that of the pure processing of reducing materials, so that the corresponding conclusions are obtained.

Findings

In this process, we also found some surface integrity problems, such as knife marks, residual stress and thermal effects. These problems may have a potential negative impact on the performance of the final parts. In processing, we can try to use other integrated processing technologies of adding and subtracting materials, try to combine various integrated processing technologies of adding and subtracting materials, or consider exploring more efficient AM technology to improve processing efficiency. We can also consider adopting production process optimization measures to reduce the processing cost of adding and subtracting materials.

Originality/value

With the gradual improvement of the requirements for the surface quality of parts in the production process and the in-depth implementation of sustainable manufacturing, the demand for integrated processing of metal addition and subtraction materials is likely to continue to grow in the future. By deeply understanding and studying the problems of material reduction and surface integrity of AM materials, we can better meet the challenges in the manufacturing process and improve the quality and performance of parts. This research is very important for promoting the development of manufacturing technology and achieving success in practical application.

Details

Journal of Intelligent Manufacturing and Special Equipment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2633-6596

Keywords

Article
Publication date: 18 March 2024

Yu-Xiang Wang, Chia-Hung Hung, Hans Pommerenke, Sung-Heng Wu and Tsai-Yun Liu

This paper aims to present the fabrication of 6061 aluminum alloy (AA6061) using a promising laser additive manufacturing process, called the laser-foil-printing (LFP) process…

Abstract

Purpose

This paper aims to present the fabrication of 6061 aluminum alloy (AA6061) using a promising laser additive manufacturing process, called the laser-foil-printing (LFP) process. The process window of AA6061 in LFP was established to optimize process parameters for the fabrication of high strength, dense and crack-free parts even though AA6061 is challenging for laser additive manufacturing processes due to hot-cracking issues.

Design/methodology/approach

The multilayers AA6061 parts were fabricated by LFP to characterize for cracks and porosity. Mechanical properties of the LFP-fabricated AA6061 parts were tested using Vicker’s microhardness and tensile testes. The electron backscattered diffraction (EBSD) technique was used to reveal the grain structure and preferred orientation of AA6061 parts.

Findings

The crack-free AA6061 parts with a high relative density of 99.8% were successfully fabricated using the optimal process parameters in LFP. The LFP-fabricated parts exhibited exceptional tensile strength and comparable ductility compared to AA6061 samples fabricated by conventional laser powder bed fusion (LPBF) processes. The EBSD result shows the formation of cracks was correlated with the cooling rate of the melt pool as cracks tended to develop within finer grain structures, which were formed in a shorter solidification time and higher cooling rate.

Originality/value

This study presents the pioneering achievement of fabricating crack-free AA6061 parts using LFP without the necessity of preheating the substrate or mixing nanoparticles into the melt pool during the laser melting. The study includes a comprehensive examination of both the mechanical properties and grain structures, with comparisons made to parts produced through the traditional LPBF method.

Details

Rapid Prototyping Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1355-2546

Keywords

Article
Publication date: 29 November 2022

Xinyan Lv, Yisheng Liang, Jiang Zhong and Haifeng He

The silicone modifications of two-component epoxy resin coatings are commonly built on epoxy resins rather than on epoxy curing agents. The silicone-modified epoxy curing agent…

Abstract

Purpose

The silicone modifications of two-component epoxy resin coatings are commonly built on epoxy resins rather than on epoxy curing agents. The silicone-modified epoxy curing agent system is rarely reported yet. This study aims to prepare the polysiloxane (PS)-modified waterborne epoxy coatings based on aqueous curing agents technology.

Design/methodology/approach

Waterborne epoxy curing agents with different contents of terminal epoxy PS were synthesized by reacting with triethylenetetramine, followed by incorporating of epoxy resin (NPEL-128) and polyethylene glycol diglycidyl ether. The waterborne epoxy coatings were prepared with the above curing agents, and their performance was investigated through thermogravimetric analysis, scanning electron microscopy, mechanical characterization, gloss measurement, chemical resistance test and ultraviolet (UV) aging experiment.

Findings

The results showed that the epoxy coating prepared by silicon-modified curing agent has higher gloss, better chemical resistance and UV resistance than the coating from unmodified curing agent with terminal epoxy PS and commercially available waterborne epoxy curing agent (Aradur 3986), as well as the competitive mechanical properties and heat resistance. Reduced water absorption on fibrous paper was also obtained with the help of silicon-modified curing agent.

Originality/value

These findings will be valuable for resin researchers in addressing the modification issues about waterborne epoxy resin and curing agent.

Details

Pigment & Resin Technology, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0369-9420

Keywords

Article
Publication date: 7 March 2023

Gilang Puspita Rini and Amie Kusumawardhani

This study aims to identify factors that can improve customer service performance by verifying the relationships between these factors, such as customer orientation, firm-specific…

Abstract

Purpose

This study aims to identify factors that can improve customer service performance by verifying the relationships between these factors, such as customer orientation, firm-specific resource integration, transactive memory system and service innovation capability. In other words, this study identifies the determinants of customer service performance from the perspective of the resource advantage theory of competition.

Design/methodology/approach

This research was conducted through an online survey of hotel managers and supervisors in Indonesia, which produced 327 questionnaires that could be processed with a response rate of 70.6%. Structural equation modelling was used to analyse the data and test the hypotheses with the help of AMOS 23.

Findings

This study confirms that firm-specific resource integration can improve customer service performance, with the antecedents of the former being customer orientation and a transactive memory system.

Research limitations/implications

This research was conducted with a sample of three-, four- and five-star hotels, which have different conditions. In future research, it would be interesting to compare how such hotels over a larger geographical area behave in improving customer service performance using the investigated variables.

Originality/value

This research provides additional insight into the resource advantage theory of competition, namely, that integrated enterprise-specific resources are good antecedents for innovation and customer service performance.

Details

International Journal of Innovation Science, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1757-2223

Keywords

1 – 10 of 22