Search results

1 – 10 of 16
Article
Publication date: 17 December 2019

Xin Hu and Heap-Yih Chong

Off-site manufacturing (OSM) is a modern method of construction that brings various environmental sustainability benefits for stakeholders. The increasing take-up of OSM in…

1818

Abstract

Purpose

Off-site manufacturing (OSM) is a modern method of construction that brings various environmental sustainability benefits for stakeholders. The increasing take-up of OSM in practice has attracted much research interest in its environmental sustainability. However, a holistic understanding of these previous research studies is still lacking. Therefore, the purpose of this paper is to critically review the existing body of knowledge regarding the environmental sustainability of OSM.

Design/methodology/approach

A qualitative content analysis was adopted to systematically and objectively review 55 related historical studies.

Findings

Three research themes were identified, including environmental sustainability assessment and performance, environmental sustainability strategies and critical environmental sustainability factors. A detailed discussion of the three themes was conducted to depict a whole picture of the current explorations in the research field. Additionally, a research framework was developed to articulate the interrelationship between the research themes and their specific research topics. Scientific research gaps were identified together with the future research directions in terms of sustainability strategies, performance impacting factors, sustainability indicators and drawbacks resulted from OSM application.

Originality/value

The literature review promotes construction stakeholders’ in-depth understanding about the environmental sustainability of OSM, which offers valuable implications for green industry practice. Additionally, it highlights the future research trends, which facilitates further explorations in the research area.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 December 2019

Zhangming Ma, Heap-Yih Chong and Pin-Chao Liao

Human error is among the leading causes of construction-based accidents. Previous studies on the factors affecting human error are rather vague from the perspective of complex and…

Abstract

Purpose

Human error is among the leading causes of construction-based accidents. Previous studies on the factors affecting human error are rather vague from the perspective of complex and changeable working environments. The purpose of this paper is to develop a dynamic causal model of human errors to improve safety management in the construction industry. A theoretical model is developed and tested through a case study.

Design/methodology/approach

First, the authors defined the causal relationship between construction and human errors based on the cognitive reliability and error analysis method (CREAM). A dynamic Bayesian network (DBN) was then developed by connecting time-variant causal relationships of human errors. Next, prediction, sensitivity analysis and diagnostic analysis of DBN were applied to demonstrate the function of this model. Finally, a case study of elevator installation was presented to verify the feasibility and applicability of the proposed approach in a construction work environment.

Findings

The results of the proposed model were closer to those of practice than previous static models, and the features of the systematization and dynamics are more efficient in adapting toward increasingly complex and changeable environments.

Originality/value

This research integrated CREAM as the theoretical foundation for a novel time-variant causal model of human errors in construction. Practically, this model highlights the hazards that potentially trigger human error occurrences, facilitating the implementation of proactive safety strategy and safety measures in advance.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 July 2019

Xiaofeng Liao, Cen Ying Lee and Heap-Yih Chong

The management of building information modeling (BIM)-enabled construction projects is challenging and unstructured in nature, particularly in terms of contract administration…

Abstract

Purpose

The management of building information modeling (BIM)-enabled construction projects is challenging and unstructured in nature, particularly in terms of contract administration. Even though previous studies have revealed various legal issues related to BIM, little is known regarding the contractual practices of BIM. Hence, the purpose of this paper is to explore the contractual practices between the BIM consultant and employer in detail.

Design/methodology/approach

An explanatory case study was carried out on four large BIM-enabled construction projects in China.

Findings

The contractual practices differed from one project to another in terms of ownership and intellectual property rights (IPRs) of the BIM model, roles of the BIM consultant, liability of the BIM consultant in the event of errors and delays of the BIM model, and BIM-related costs and payments. Some of the interesting findings are as follows: the employer shall retain the ownership and IPRs of the BIM model, the BIM consultant shall provide a warranty to ensure usability of the BIM model after project handover, the BIM consultant shall pay for damages or losses if the BIM model fails to deliver and the costs of BIM implementation shall be borne by both contracting parties.

Originality/value

This study provides a fresh, realistic insight on the development of plausible contractual practices between the BIM consultant and employer and the findings can be used to improve BIM contract protocols in future projects.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 May 2021

Oluwole Alfred Olatunji, Jane Jia Suen Lee, Heap-Yih Chong and Abiola Abosede Akanmu

This study investigates building information modelling (BIM) penetration in quantity surveying (QS) practice by examining the significance attached to the benefits and barriers of…

1452

Abstract

Purpose

This study investigates building information modelling (BIM) penetration in quantity surveying (QS) practice by examining the significance attached to the benefits and barriers of BIM adoption, BIM capabilities and future directions of BIM in QS processes. A popular opinion amongst construction researchers is that BIM has the capacity to revolutionize the industry. The study draws-out information in the literature regarding discipline-specific penetration of BIM.

Design/methodology/approach

Snowball sampling method was used to obtain information through a survey questionnaire. A total of 73 participants, largely quantity surveyors in Western Australia, took part in the study. Reductionist methodology was used to identify key variables of QS-BIM competencies that are most significant statistically.

Findings

BIM does not impose additional difficulties to traditional QS processes. Adherence to standard method of measurement and limited market demand do not hinder BIM deployment significantly. Quantity surveyors are able to use BIM to support their professional services once definitive design models are involved. In addition, the study identifies BIM penetration barriers to include constraints caused by centralised database management and interoperability issues, limitations imposed by market drivers, lack of in-house expertise to manage modelling needs and limited capability in software management.

Practical implications

Future opportunities for skill development are in the areas noted in the findings. Whilst many studies have reported resistance and widespread scepticism amongst some construction disciplines regarding BIM adoption, this study finds BIM penetration in QS practice is considerable, a direction that could trigger further novel innovations.

Originality/value

The methodology reported in the study is novel. In addition, findings from the study inspires other discipline-specific studies to articulate their BIM-penetration trends so that t broad areas of construction can develop a balanced strategy around BIM and innovation development.

Details

Built Environment Project and Asset Management, vol. 11 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 17 October 2018

Ting-Kwei Wang, David N. Ford, Heap-Yih Chong and Wei Zhang

Delays during construction are one of the common scenarios in the construction industry. The purpose of this paper is to identify the primary causes of delays in the construction…

1840

Abstract

Purpose

Delays during construction are one of the common scenarios in the construction industry. The purpose of this paper is to identify the primary causes of delays in the construction phase of building construction projects in China.

Design/methodology/approach

Questionnaire survey approach was adopted across the four typical cities in China, namely, Beijing, Shanghai, Chongqing and Shenzhen. In total, 115 sets of valid responded questionnaires were collected and analyzed.

Findings

The results show that the causes of variations, delays in progress payments, exceptionally low bids and subcontractors’ poor performance and communication issues were the most important causes of delays in China.

Originality/value

This research is the first questionnaire survey on the causes of delays in the construction phase of building construction projects in China. The comparative analysis shows two unique causes of delays in the Chinese construction industry, such as “difficulty in claiming indemnity” and “unreasonable upfront capital demanded by client.” It also reveals different ranked causes of delays as per distinguished political and economic situations in China. The research findings can be referred by construction projects in other countries that are funded or partnered with China.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 11
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 June 2019

Pejman Ghasemi Poor Sabet and Heap-Yih Chong

New methods have been introduced as revolutionary approaches in the construction industry, such as off-site manufacturing (OSM) and building information modelling (BIM). Although…

Abstract

Purpose

New methods have been introduced as revolutionary approaches in the construction industry, such as off-site manufacturing (OSM) and building information modelling (BIM). Although these approaches can provide many benefits, there are still barriers to meeting the expectations of improved construction productivity via their implementation. Hence, the purpose of this paper is to critically review the capabilities of OSM and BIM techniques, as well as their potential interactions, in productivity improvement.

Design/methodology/approach

A scoping review approach was adopted, where 100 peer-reviewed journal articles were collected to analyse the capabilities of OSM and BIM, as well as their potential interactions, in productivity improvement as assessed by key productivity indicators (KPrIs).

Findings

The results reveal seven BIM-based capabilities and six OSM-based capabilities, as well as 12 potential OSM–BIM interactions that have significant potential for satisfying KPrIs.

Originality/value

An integrated framework has also been developed to clarify and conceptualise the roles of OSM–BIM interactions in their designated KPrIs. The research has developed insightful and practical references for strategic planning and management in OSM–BIM-based projects.

Details

International Journal of Managing Projects in Business, vol. 13 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 18 October 2021

Yongshun Xu, Heap-Yih Chong and Ming Chi

In the era of digitalisation, blockchain has the potential to fundamentally change the architecture, engineering and construction (AEC) industry's workflow, trust and procurement…

1430

Abstract

Purpose

In the era of digitalisation, blockchain has the potential to fundamentally change the architecture, engineering and construction (AEC) industry's workflow, trust and procurement environments. However, few studies have investigated blockchain adoption barriers in the AEC industry in detail. Therefore, the study aims to provide a comprehensive understanding of these barriers and their interdependent relationships in the context of the AEC industry.

Design/methodology/approach

Based on a review of the literature, industry reports and expert feedback, 11 barriers towards adopting the blockchain were identified. Then, the authors investigated the interdependencies amongst the factors by adopting a two-stage integrated interpretive structural modelling (ISM) and decision-making trial and evaluation laboratory (DEMATEL) method.

Findings

The findings show that the lack of information technology infrastructure (BC4) and legal and regulatory uncertainty (BC11) are the most prominent barriers towards blockchain adoption in the AEC industry.

Practical implications

The research contributes in providing a clearer understanding of related barriers and potential solutions for practitioners in this area. Subsequently, the identification of adoption barriers can enable an important knowledge foundation and suggest possible solutions for adopting blockchain techniques successfully and effectively in the AEC industry.

Originality/value

The study lays an essential research foundation for the effective adoption and use of blockchain in the AEC industry.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 10 May 2019

Ru Liang and Heap-Yih Chong

Green supplier selection is one of the crucial activities in green supply chain management. However, limited studies have addressed the vagueness and complexities during the…

Abstract

Purpose

Green supplier selection is one of the crucial activities in green supply chain management. However, limited studies have addressed the vagueness and complexities during the selection process, particularly in multi-criterion decision-making (MCDM) circumstances. Hence, the purpose of this paper is to develop a group decision model using a modified fuzzy MCDM approach for green supplier selection under a complex situation.

Design/methodology/approach

The proposed study develops a framework for sorting decisions in green supplier selection by using the hesitant fuzzy qualitative flexible multiple attributes method (QUALIFLEX). The synthetic consistent or inconsistent indexes were used to calculate all alternative suppliers by normalizing the hesitant fuzzy decision matrix.

Findings

The proposed framework has been successfully applied and illustrated in the case example of CB02 contract section in Hong Kong–Zhuhai–Macau Bridge project. The results show various complicated decision-making scenarios can be addressed through the proposed approach. The synthetic (in)consistent indexes are able to calculate all alternative suppliers by normalizing the hesitant fuzzy decision matrix.

Originality/value

The research contributes to improving accuracy and reliability decision-making processes for green supplier selection, especially under vagueness and complex situations in megaprojects.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 September 2016

Heap-Yih Chong and Chee Kheng Oon

Legal drafting is one of the root causes for interpretation errors and misunderstandings in construction contracts. Moreover, most construction personnel do not have legally…

Abstract

Purpose

Legal drafting is one of the root causes for interpretation errors and misunderstandings in construction contracts. Moreover, most construction personnel do not have legally trained background. Therefore, the purpose of this paper is to determine the feasible use and practicality of Plain English in clarifying legal drafting in Malaysian construction contracts.

Design/methodology/approach

Two research approaches were adopted, namely, Delphi research and case study. The Delphi method was to elicit local experts’ knowledge and consensus view on the given examples of restructured contract provisions. Next, an actual case study was conducted to examine and substantiate the research findings by critically reviewing the latest and revised standard form of contract for its Plain English usage.

Findings

The Delphi research shows that all the restructured contract provisions were agreed by the local experts; whereas the case study reveals that significant changes and the acceptance of Plain English in most of the contract provisions.

Originality/value

The research renders insightful references in clarifying legal drafting in construction contracts based on the empirical evidence and the use of Plain English from the Malaysian scenario. It also contributes into the resolution of contractual differences and conflicts caused by the misunderstandings or interpretation problems.

Details

Engineering, Construction and Architectural Management, vol. 23 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 May 2020

Qing-Wen Zhang, Heap-Yih Chong, Pin-Chao Liao and Yao-Lin Wan

This study aims to determine the influences of explanatory factors on the efficacy of the implementation of corporate safety policy (CSP) in international projects from the…

Abstract

Purpose

This study aims to determine the influences of explanatory factors on the efficacy of the implementation of corporate safety policy (CSP) in international projects from the perspective of international contractors.

Design/methodology/approach

Four explanatory factors were identified for the implementation of CSP in international projects based on literature review. A questionnaire survey was then conducted among Chinese organizations that have been involved in international projects. In total, 121 valid responses were received from the questionnaire survey and were modeled using logistic regression to examine the impact of each factor on the observed event of interest.

Findings

The factors related to the effectiveness of implementing CSP, including “attitudes toward safety management measures (ASMM),” “operational mechanism for safety regulations (OM),” “safety knowledge management system (SKMS)” and “systematic safety training scheme (STS),” were selected. The results revealed that OM and SKMS were significant predictors (p < 0.05) of the odds of implementation satisfaction of CSP, but ASMM and STS were not. The probability of satisfactory CSP implementation increased as the value of SKMS increased, whereas the probability of unsatisfactory implementation improved as the value of OM increased.

Research limitations/implications

The questionnaire was distributed to respondents in international contractors headquartered in China. Other types of international organizations can be covered in future research. Furthermore, other factors, such as the local construction environment, should be considered in future studies.

Practical implications

The results provide new insights on CSP implementation overseas. Effective implementation of CSP contributes to the improvement of the safety performance of contractors. The practical significance of interpreting the influence factors is that the contractors can implement more efficient and targeted approaches and tools in the execution of their CSP. The impact of OM reminds safety managers of the synchronization of CSP as well as its implementation environment and characteristics. The effect of ASMM encourages contractors to adopt Web-based and digital knowledge management systems to improve the implementation efficiency of CSP.

Originality/value

The novelty of this study lies in the selection of factors and their impacts on CSP implementation in international projects. This study has also extended knowledge on normative safety in international projects based on quantitative modeling.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 16