Article
Publication date: 1 February 2024

Hakeem A. Owolabi, Azeez A. Oyedele, Lukumon Oyedele, Hafiz Alaka, Oladimeji Olawale, Oluseyi Aju, Lukman Akanbi and Sikiru Ganiyu

Despite an enormous body of literature on conflict management, intra-group conflicts vis-à-vis team performance, there is currently no study investigating the conflict prevention…

Abstract

Purpose

Despite an enormous body of literature on conflict management, intra-group conflicts vis-à-vis team performance, there is currently no study investigating the conflict prevention approach to handling innovation-induced conflicts that may hinder smooth implementation of big data technology in project teams.

Design/methodology/approach

This study uses constructs from conflict theory, and team power relations to develop an explanatory framework. The study proceeded to formulate theoretical hypotheses from task-conflict, process-conflict, relationship and team power conflict. The hypotheses were tested using Partial Least Square Structural Equation Model (PLS-SEM) to understand key preventive measures that can encourage conflict prevention in project teams when implementing big data technology.

Findings

Results from the structural model validated six out of seven theoretical hypotheses and identified Relationship Conflict Prevention as the most important factor for promoting smooth implementation of Big Data Analytics technology in project teams. This is followed by power-conflict prevention, prevention of task disputes and prevention of Process conflicts respectively. Results also show that relationship and power conflicts interact on the one hand, while task and relationship conflict prevention also interact on the other hand, thus, suggesting the prevention of one of the conflicts could minimise the outbreak of the other.

Research limitations/implications

The study has been conducted within the context of big data adoption in a project-based work environment and the need to prevent innovation-induced conflicts in teams. Similarly, the research participants examined are stakeholders within UK projected-based organisations.

Practical implications

The study urges organisations wishing to embrace big data innovation to evolve a multipronged approach for facilitating smooth implementation through prevention of conflicts among project frontlines. This study urges organisations to anticipate both subtle and overt frictions that can undermine relationships and team dynamics, effective task performance, derail processes and create unhealthy rivalry that undermines cooperation and collaboration in the team.

Social implications

The study also addresses the uncertainty and disruption that big data technology presents to employees in teams and explore conflict prevention measure which can be used to mitigate such in project teams.

Originality/value

The study proposes a Structural Model for establishing conflict prevention strategies in project teams through a multidimensional framework that combines constructs like team power conflict, process, relationship and task conflicts; to encourage Big Data implementation.

Details

Information Technology & People, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0959-3845

Keywords

Article
Publication date: 2 June 2023

Oluwaseun Enoch Akindele, Saheed Ajayi, Luqman Toriola-Coker, Adekunle Sabitu Oyegoke, Hafiz Alaka and Sambo Lyson Zulu

Amidst all solutions posited to address sustainable construction practices in Nigeria, the implementation plans are repudiated by sustainable barriers. This study examines and…

Abstract

Purpose

Amidst all solutions posited to address sustainable construction practices in Nigeria, the implementation plans are repudiated by sustainable barriers. This study examines and confirms the strategy with the most significant impacts on the identified barrier to sustainable construction practice (SCP).

Design/methodology/approach

The study deployed a questionnaire survey to evaluate the perspective of 100 construction actors on the barriers and strategies of sustainable construction practice in Nigeria. Factor Analysis was employed to categorize key barriers and strategies into their underlying clusters for further analysis. Partial least squares-structural equation modelling (PLS-SEM) was used to confirm the construct's significant relationship and magnitude, thereby establishing the strategies with the highest impacts on the barriers to sustainable construction practices.

Findings

The findings revealed three clusters of barriers and four groups of strategies to SCP, including technopolitic barrier, perception and awareness barrier and sociocultural barrier. For the significant strategies, education and training, stakeholder regulation, incentive support and government and legislative support strategies were established. Overall, education and training strategy was identified as the most dominant and effective strategy to mitigate the barriers of SCP in Nigeria.

Originality/value

The paper establishes education and training as the key strategy to achieving sustainable quest in the AEC industry. The practical implication is that policymakers, educators and professional bodies can harness sustainable knowledge transfer through education and training to improve sustainable construction practices in Nigeria.

Details

Built Environment Project and Asset Management, vol. 13 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 26 May 2022

Ismail Abiodun Sulaimon, Hafiz Alaka, Razak Olu-Ajayi, Mubashir Ahmad, Saheed Ajayi and Abdul Hye

Road traffic emissions are generally believed to contribute immensely to air pollution, but the effect of road traffic data sets on air quality (AQ) predictions has not been fully…

260

Abstract

Purpose

Road traffic emissions are generally believed to contribute immensely to air pollution, but the effect of road traffic data sets on air quality (AQ) predictions has not been fully investigated. This paper aims to investigate the effects traffic data set have on the performance of machine learning (ML) predictive models in AQ prediction.

Design/methodology/approach

To achieve this, the authors have set up an experiment with the control data set having only the AQ data set and meteorological (Met) data set, while the experimental data set is made up of the AQ data set, Met data set and traffic data set. Several ML models (such as extra trees regressor, eXtreme gradient boosting regressor, random forest regressor, K-neighbors regressor and two others) were trained, tested and compared on these individual combinations of data sets to predict the volume of PM2.5, PM10, NO2 and O3 in the atmosphere at various times of the day.

Findings

The result obtained showed that various ML algorithms react differently to the traffic data set despite generally contributing to the performance improvement of all the ML algorithms considered in this study by at least 20% and an error reduction of at least 18.97%.

Research limitations/implications

This research is limited in terms of the study area, and the result cannot be generalized outside of the UK as some of the inherent conditions may not be similar elsewhere. Additionally, only the ML algorithms commonly used in literature are considered in this research, therefore, leaving out a few other ML algorithms.

Practical implications

This study reinforces the belief that the traffic data set has a significant effect on improving the performance of air pollution ML prediction models. Hence, there is an indication that ML algorithms behave differently when trained with a form of traffic data set in the development of an AQ prediction model. This implies that developers and researchers in AQ prediction need to identify the ML algorithms that behave in their best interest before implementation.

Originality/value

The result of this study will enable researchers to focus more on algorithms of benefit when using traffic data sets in AQ prediction.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 7 September 2021

Christian Nnaemeka Egwim, Hafiz Alaka, Luqman Olalekan Toriola-Coker, Habeeb Balogun, Saheed Ajayi and Raphael Oseghale

This paper aims to establish the most underlying factors causing construction projects delay from the most applicable.

Abstract

Purpose

This paper aims to establish the most underlying factors causing construction projects delay from the most applicable.

Design/methodology/approach

The paper conducted survey of experts using systematic review of vast body of literature which revealed 23 common factors affecting construction delay. Consequently, this study carried out reliability analysis, ranking using the significance index measurement of delay parameters (SIDP), correlation analysis and factor analysis. From the result of factor analysis, this study grouped a specific underlying factor into three of the six applicable factors that correlated strongly with construction project delay.

Findings

The paper finds all factors from the reliability test to be consistent. It suggests project quality control, project schedule/program of work, contractors’ financial difficulties, political influence, site conditions and price fluctuation to be the six most applicable factors for construction project delay, which are in the top 25% according to the SIDP score and at the same time are strongly associated with construction project delay.

Research limitations/implications

This paper is recommending that prospective research should use a qualitative and inductive approach to investigate whether any new, not previously identified, underlying factors that impact construction projects delay can be discovered as it followed an inductive research approach.

Practical implications

The paper includes implications for the policymakers in the construction industry in Nigeria to focus on measuring the key suppliers’ delivery performance as late delivery of materials by supplier can result in rescheduling of work activities and extra time or waiting time for construction workers as well as for the management team at site. Also, construction stakeholders in Nigeria are encouraged to leverage the amount of data produced from backlog of project schedules, as-built drawings and models, computer-aided designs (CAD), costs, invoices and employee details, among many others through the aid of state-of-the-art data driven technologies such as artificial intelligence or machine learning to make key business decisions that will help drive further profitability. Furthermore, this study suggests that these stakeholders use climatological data that can be obtained from weather observations to minimize impact of bad weather during construction.

Originality/value

This paper establishes the three underlying factors (late delivery of materials by supplier, poor decision-making and Inclement or bad weather) causing construction projects delay from the most applicable.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 6 September 2021

Luqman Toriola-Coker, Hakeem Owolabi, Hafiz Alaka, Wasiu Adeniran Bello and Chaminda Pathirage

This study aims to investigate two public private partnership (PPP) road projects in Nigeria for exploring factors that can motivate end-user stakeholders for contributing towards…

Abstract

Purpose

This study aims to investigate two public private partnership (PPP) road projects in Nigeria for exploring factors that can motivate end-user stakeholders for contributing towards sustaining a PPP project in the long-term.

Design/methodology/approach

Using a case study methodology approach, this study adopts two-way data collection strategies via in-depth interviews with PPP experts and end-user stakeholders in Nigeria host communities and a questionnaire survey to relevant stakeholders.

Findings

The study identifies an eight-factor structure indicating critical success factors for ensuring end-user stakeholders support PPP projects on a long-term basis in their host communities.

Originality/value

Results of the study have huge implications for policymakers and project companies by encouraging the early integration of far-sighted measures that will promote long-term support and sustainability for PPP projects amongst the end-user stakeholders.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 6 June 2023

Oluwaseun Akindele, Saheed Ajayi, Adekunle S. Oyegoke, Hafiz A. Alaka and Temitope Omotayo

Notwithstanding the Geographical Information System (GIS) being a fast-emerging green area of a digital revolution, the available studies focus on different subject areas of…

Abstract

Purpose

Notwithstanding the Geographical Information System (GIS) being a fast-emerging green area of a digital revolution, the available studies focus on different subject areas of application in the construction industry, with no study that clarifies its knowledge strands. Hence, this systematic review analyses GIS core area of application, its system integration patterns, challenges and future directions in the construction industry.

Design/methodology/approach

A systematic review approach was employed, using the Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) checklist. A total of 60 articles published between 2011 and 2022 were identified, thoroughly reviewed and analysed using thematic analysis.

Findings

The analysis revealed spatial planning and design, construction-task tracking, defect detection and safety monitoring as its four main application-based areas. The findings showed that the adoption of GIS technology is rapidly expanding and being utilised more in building projects to visual-track construction activities. The review discovered an integrated pattern involving data flow from a device and window-form application to GIS, the pathways to data exchange between platforms to platforms, where ArcGIS is the most used software. Furthermore, the study highlighted the lack of interoperability between heterogeneous systems as the crux impediment to adopting GIS in the built environment.

Originality/value

The research provides a deep insight into possible areas where GIS is adopted in the construction industry, identifying areas of extensive and limited application coverage over a decade. Besides, it demystifies possible pathways for future integration opportunities of GIS with other emerging technologies within the construction industry.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 7 November 2023

Christian Nnaemeka Egwim, Hafiz Alaka, Youlu Pan, Habeeb Balogun, Saheed Ajayi, Abdul Hye and Oluwapelumi Oluwaseun Egunjobi

The study aims to develop a multilayer high-effective ensemble of ensembles predictive model (stacking ensemble) using several hyperparameter optimized ensemble machine learning…

66

Abstract

Purpose

The study aims to develop a multilayer high-effective ensemble of ensembles predictive model (stacking ensemble) using several hyperparameter optimized ensemble machine learning (ML) methods (bagging and boosting ensembles) trained with high-volume data points retrieved from Internet of Things (IoT) emission sensors, time-corresponding meteorology and traffic data.

Design/methodology/approach

For a start, the study experimented big data hypothesis theory by developing sample ensemble predictive models on different data sample sizes and compared their results. Second, it developed a standalone model and several bagging and boosting ensemble models and compared their results. Finally, it used the best performing bagging and boosting predictive models as input estimators to develop a novel multilayer high-effective stacking ensemble predictive model.

Findings

Results proved data size to be one of the main determinants to ensemble ML predictive power. Second, it proved that, as compared to using a single algorithm, the cumulative result from ensemble ML algorithms is usually always better in terms of predicted accuracy. Finally, it proved stacking ensemble to be a better model for predicting PM2.5 concentration level than bagging and boosting ensemble models.

Research limitations/implications

A limitation of this study is the trade-off between performance of this novel model and the computational time required to train it. Whether this gap can be closed remains an open research question. As a result, future research should attempt to close this gap. Also, future studies can integrate this novel model to a personal air quality messaging system to inform public of pollution levels and improve public access to air quality forecast.

Practical implications

The outcome of this study will aid the public to proactively identify highly polluted areas thus potentially reducing pollution-associated/ triggered COVID-19 (and other lung diseases) deaths/ complications/ transmission by encouraging avoidance behavior and support informed decision to lock down by government bodies when integrated into an air pollution monitoring system

Originality/value

This study fills a gap in literature by providing a justification for selecting appropriate ensemble ML algorithms for PM2.5 concentration level predictive modeling. Second, it contributes to the big data hypothesis theory, which suggests that data size is one of the most important factors of ML predictive capability. Third, it supports the premise that when using ensemble ML algorithms, the cumulative output is usually always better in terms of predicted accuracy than using a single algorithm. Finally developing a novel multilayer high-performant hyperparameter optimized ensemble of ensembles predictive model that can accurately predict PM2.5 concentration levels with improved model interpretability and enhanced generalizability, as well as the provision of a novel databank of historic pollution data from IoT emission sensors that can be purchased for research, consultancy and policymaking.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Abstract

Details

Built Environment Project and Asset Management, vol. 13 no. 4
Type: Research Article
ISSN: 2044-124X

1 – 8 of 8