Article
Publication date: 20 July 2023

Qais K. Jahanger, David Trejo and Joseph Louis

The health of an economy is heavily dependent on the productivity of the economy's major industries including construction. While most macro-measures of productivity in the USA…

Abstract

Purpose

The health of an economy is heavily dependent on the productivity of the economy's major industries including construction. While most macro-measures of productivity in the USA construction industry indicate a decline, corresponding studies at the individual task level indicate an increase in productivity. Therefore, this paper aims to identify areas where productivity challenges exist and thus provide recommendations for improvement in the construction industry.

Design/methodology/approach

A model that relates the way construction projects are executed with the sources of data that inform productivity analyses is developed and presented. This effort/value-flow model informs the data analysis that is performed to determine productivity trends for management and field labor. Further analysis for field labor productivity using field data and management productivity was separately conducted. Management productivity was particularly difficult to gauge, resulting in the use of surrogate measures.

Findings

It was observed that while both field labor and management productivities at the industry level have been decreasing, the decrease in management productivity was five times that of field labor productivity. A similar trend was observed for management productivity at the project level.

Originality/value

The primary contribution of this paper to the body of knowledge and industry is the introduction of a holistic analysis of USA construction productivity. Recommendations to improve management productivity include the use of technology, especially project management software.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 July 2023

Ozan Okudan, Murat Cevikbas and Zeynep Işık

The purpose of this paper is to propose a decision support framework that can be used by decision-makers to identify the most convenient disruption analysis (DA) methods for…

Abstract

Purpose

The purpose of this paper is to propose a decision support framework that can be used by decision-makers to identify the most convenient disruption analysis (DA) methods for megaprojects and their stakeholders.

Design/methodology/approach

The framework was initially developed by conducting a comprehensive literature review to obtain extensive knowledge about disruption management and megaprojects. Focus group discussion (FGD) sessions with the participation of the construction practitioners were then organized to validate and strengthen the findings of the literature review. Consequently, 17 selection factors were identified and categorized as requirement, ability and outcome. Lastly, the most convenient DA methods for megaprojects were identified by performing integrated fuzzy analytical hierarchy process (AHP) and fuzzy technique for order of preference by similarity to ideal solution (TOPSIS) analysis. Additionally, consistency analysis was also conducted to verify the reliability of the results.

Findings

The results revealed that the measured mile method is the most appropriate DA method for megaprojects. In case the measured mile method cannot be adopted due to various technical and contractual reasons, the decision-makers are proposed to consider program analysis, work or trade sampling, earned value analysis and control chart method, respectively. Second, the selection factors such as “Comprehensible analysis procedure,” “Existing knowledge and experience about a particular DA method,” “Ability to resolve greater number of disruption events,” “Ability to resolve complex disruption events,” “Ability to exclude factors that are not under the owner's responsibility” and “General acceptance by practitioners, courts, and arbitration, etc.” were given the top priority by the experts, highlighting the critical aspects of the DA methods.

Originality/value

Disruption claims in megaprojects are very critical for the contractors to compensate for the losses stemming from disruption events. Although the effective use of DA methods maximizes the accuracy and reliability of disruption claims, decision-makers can barely implement these methods adequately since past studies neglect to present extensive knowledge about the most convenient DA methods for megaprojects. Thus, developing a decision support framework for the selection of DA methods, this study is the earliest attempt that examines the mechanisms and inherent differences of DA methods. Additionally, owing to the robustness and versatility of this research approach, the research approach could be replicated also for future studies focusing on other project-based industries since disruption is also a challenging issue for many other industries.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 April 2024

Yanling Wang, Qin Lin, Shihan Zhang and Nannan Chen

The purpose of this study is to empirically examine the cause–effect relationships between workplace friendship and knowledge-sharing behavior, from a static perspective…

Abstract

Purpose

The purpose of this study is to empirically examine the cause–effect relationships between workplace friendship and knowledge-sharing behavior, from a static perspective. Furthermore, it investigates the bi-directional relationship between the increase in both workplace friendship and knowledge-sharing behavior over same time periods, and also endeavors to identify whether there is a significant negative lagged effect of the increase in both workplace friendship on knowledge-sharing behavior, and vice versa, across time from a dynamic perspective.

Design/methodology/approach

The study conducts a three-wave questionnaire survey to test the research model. A latent change score approach was used to test the direct relationship between changes in workplace friendship and changes in knowledge-sharing behavior.

Findings

The findings reveal that knowledge-sharing behavior fosters workplace friendship and workplace friendship promotes the emergence of knowledge-sharing behavior. An increase in workplace friendship promotes an increase in knowledge-sharing behavior over same time periods. However, an increase in workplace friendship will lead to a lagged decrease of knowledge-sharing behavior across time, and vice versa.

Research limitations/implications

The time interval in this study is a little short to capture the full changes in workplace friendship. Some important control factors and mediating mechanisms are not included in the research model.

Practical implications

This study guides managers to focus on various motivators to better strengthen workplace friendship and knowledge-sharing behavior and to consider and effectively respond to the negative side of workplace friendship and knowledge-sharing behavior across time.

Originality/value

This study emphasizes the predictivity of one important interaction patterns, namely, knowledge-sharing behavior on friendship at the workplace, from a static perspective. This study also shows the benefits of an increase in workplace friendship for the development of knowledge-sharing behavior in the same time period. Furthermore, the study presents a counterintuitive finding when taking the lag effect into consideration in exploring the relationship between changes both in workplace friendship and knowledge-sharing behavior, and identifies a negative side of both when viewed over longer periods.

Details

Journal of Knowledge Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1367-3270

Keywords

Article
Publication date: 16 April 2024

Rahadian Haryo Bayu Sejati, Dermawan Wibisono and Akbar Adhiutama

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor…

Abstract

Purpose

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor productivity without compromising human safety in Indonesian upstream oil field operations that manage ageing and life extension (ALE) facilities.

Design/methodology/approach

The research design applies a pragmatic paradigm by employing action research strategy with qualitative-quantitative methodology involving 385 of 1,533 workers. The KBPMS-L6s conceptual framework is developed and enriched with the Analytical Hierarchy Process (AHP) to prioritize fit-for-purpose Key Performance Indicators. The application of L6s with Human Performance Modes analysis is used to provide a statistical baseline approach for pre-assessment of the contractor’s organizational capabilities. A comprehensive literature review is given for the main pillars of the contextual framework.

Findings

The KBPMS-L6s concept has given an improved hierarchy for strategic and operational levels to achieve a performance benchmark to manage ALE facilities in Indonesian upstream oil field operations. To increase quality management practices in managing ALE facilities, the L6s application requires an assessment of the organizational capability of contractors and an analysis of Human Performance Modes (HPM) to identify levels of construction workers’ productivity based on human competency and safety awareness that have never been done in this field.

Research limitations/implications

The action research will only focus on the contractors’ productivity and safety performances that are managed by infrastructure maintenance programs for managing integrity of ALE facilities in Indonesian upstream of oil field operations. Future research could go toward validating this approach in other sectors.

Practical implications

This paper discusses the implications of developing the hybrid KBPMS- L6s enriched with AHP methodology and the application of HPM analysis to achieve a 14% reduction in inefficient working time, a 28% reduction in supervision costs, a 15% reduction in schedule completion delays, and a 78% reduction in safety incident rates of Total Recordable Incident Rate (TRIR), Days Away Restricted or Job Transfer (DART) and Motor Vehicle Crash (MVC), as evidence of achieving fit-for-purpose KPIs with safer, better, faster, and at lower costs.

Social implications

This paper does not discuss social implications

Originality/value

This paper successfully demonstrates a novel use of Knowledge-Based system with the integration AHP and HPM analysis to develop a hybrid KBPMS-L6s concept that successfully increases contractor productivity without compromising human safety performance while implementing ALE facility infrastructure maintenance program in upstream oil field operations.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 3 April 2024

Nirmal K. Manna, Abhinav Saha, Nirmalendu Biswas and Koushik Ghosh

This paper aims to investigate the thermal performance of equivalent square and circular thermal systems and compare the heat transport and irreversibility of magnetohydrodynamic…

Abstract

Purpose

This paper aims to investigate the thermal performance of equivalent square and circular thermal systems and compare the heat transport and irreversibility of magnetohydrodynamic (MHD) nanofluid flow within these systems.

Design/methodology/approach

The research uses a constraint-based approach to analyze the impact of geometric shapes on heat transfer and irreversibility. Two equivalent systems, a square cavity and a circular cavity, are examined, considering identical heating/cooling lengths and fluid flow volume. The analysis includes parameters such as magnetic field strength, nanoparticle concentration and accompanying irreversibility.

Findings

This study reveals that circular geometry outperforms square geometry in terms of heat flow, fluid flow and heat transfer. The equivalent circular thermal system is more efficient, with heat transfer enhancements of approximately 17.7%. The corresponding irreversibility production rate is also higher, which is up to 17.6%. The total irreversibility production increases with Ra and decreases with a rise in Ha. However, the effect of magnetic field orientation (γ) on total EG is minor.

Research limitations/implications

Further research can explore additional geometric shapes, orientations and boundary conditions to expand the understanding of thermal performance in different configurations. Experimental validation can also complement the numerical analysis presented in this study.

Originality/value

This research introduces a constraint-based approach for evaluating heat transport and irreversibility in MHD nanofluid flow within square and circular thermal systems. The comparison of equivalent geometries and the consideration of constraint-based analysis contribute to the originality and value of this work. The findings provide insights for designing optimal thermal systems and advancing MHD nanofluid flow control mechanisms, offering potential for improved efficiency in various applications.

Graphical Abstract

Details

International Journal of Numerical Methods for Heat & Fluid Flow, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0961-5539

Keywords

Article
Publication date: 3 January 2023

Simon Wyke, Søren Munch Lindhard and Jesper Kranker Larsen

Cost and time are two of the primary benchmarks in which construction projects are measured. A variety of factors, however, affect cost and time on construction projects, as…

Abstract

Purpose

Cost and time are two of the primary benchmarks in which construction projects are measured. A variety of factors, however, affect cost and time on construction projects, as identified in previous research. This has led to a need for better understanding how factors affecting cost and time overruns on public construction projects can be managed more efficiently. The purpose of this paper is to address these issues.

Design/methodology/approach

In this study 26 factors affecting cost and time overruns on construction projects were identified, through qualitative interviews with project managers from Danish governmental agencies and through a literature review. Through principal component analyses the 26 factors were subsequently narrowed down to four primary latent factors.

Findings

The identified four latent factors affecting cost and time overruns on public construction projects were lack of quality management, lack of project pre-planning, lack of user management and lack of project management.

Originality/value

Previous research has focussed on increasing knowledge by identifying and ranking factors affecting time and cost performance. This has led to the identification of an overwhelming number of factors to use for managing construction projects. The present research reduced the number of factors by clustering them into key latent factors responsible for most of the deviation in performance, narrowing the scope of construction cost and time management into a few tangible key focus areas. This supports and improves fast decision-making that is necessary in a changeable environment such as construction.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 February 2023

Maali Alghnimi and Humoud Alqashan

Coronavirus disease 2019 (COVID-19) is a new disease that has led to rapid and dramatic global changes. This study aims to investigate how Gulf Cooperation Council (GCC) citizens…

Abstract

Purpose

Coronavirus disease 2019 (COVID-19) is a new disease that has led to rapid and dramatic global changes. This study aims to investigate how Gulf Cooperation Council (GCC) citizens and noncitizens search for necessary information and assess available information sources, their associated awareness and anxiety levels, voluntary work, compliance with quarantine regulations and technology.

Design/methodology/approach

An electronic questionnaire was designed using Google Forms and distributed on Twitter and WhatsApp. In total, 1,006 responses were received.

Findings

The results showed that 75.25% of the participants were active information seekers because of their daily search for necessary information. “Formal sources,” “Social media” and “Television” were the most preferred information sources found by the study sample.

Originality/value

This study investigates the behavior of GCC citizens and noncitizens in searching for necessary information during the COVID-19 pandemic. In addition, it draws attention to the importance of digitization and digital preservation in building a specialized digital library for future access to pandemic-related information distributed by the government authorities and institutions in the State of Kuwait.

Details

Global Knowledge, Memory and Communication, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2514-9342

Keywords

Article
Publication date: 20 October 2023

Innocent Chigozie Osuizugbo, Olalekan Shamsideen Oshodi, Patricia Omega Kukoyi, Amos Okemukoko Lawani and Anthony Ogochukwu Onokwai

The current study seeks to investigate and determine the principal barriers to the adoption of work–life balance (WLB) practices amongst construction companies operating in the…

Abstract

Purpose

The current study seeks to investigate and determine the principal barriers to the adoption of work–life balance (WLB) practices amongst construction companies operating in the developing countries using Lagos, Nigeria as a case study.

Design/methodology/approach

This study adopts a survey research technique. Snowball sampling technique was adopted to identify the target respondents for the administration of questionnaire. A total of 156 questionnaires were distributed and a response rate of 66% (103 questionnaires were completely filled and returned) was attained. Data elicited were analysed using descriptive and inferential statistics.

Findings

The results from the exploratory factors analysis show that the principal barriers to the adoption of WLB practices amongst construction companies in Lagos, Nigeria are categorised into four components: nature of construction job and limited evidence on impact of WLB, support, awareness and culture, lack of involvement of management staff and organisational factors.

Originality/value

This study contributed to more effective WLB studies by highlighting the barriers to the adoption of WLB practices in the construction sector. An understanding of these barriers can aid policy makers and management personnel in construction organisations as well as facilitate development of strategies required to reduce the barriers to WLB practices in the construction sector.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 August 2023

Saira Hanif Soroya, Adeel Ur Rehman and Anthony Faiola

Quality of life is dependent on a healthy lifestyle and the self-care behavior of individuals. The study's purpose is to find out the determinants of individuals' self-care…

Abstract

Purpose

Quality of life is dependent on a healthy lifestyle and the self-care behavior of individuals. The study's purpose is to find out the determinants of individuals' self-care behavior. As such, self-care behavior is influenced by several factors that include individual knowledge, available information sources and their use, information-seeking related skills and cognitive state.

Design/methodology/approach

A quantitative research design followed using a questionnaire-based survey method. A total of 384 responses from the Pakistani public were collected using the convenience sampling technique. Structural equation modeling (SEM) was performed for examining the possible link between the variables.

Findings

Health literacy, Internet and social media use, and health information-seeking behavior had a direct/indirect positive impact on self-care behavior, but health anxiety had a negative impact. Health literacy and health information-seeking behavior positively mediated the relationship among Internet and social media use health anxiety and self-care.

Research limitations/implications

Improving health literacy appears to be key to supporting better self-care, but it is an exploratory study, more research is required to confirm these findings. Policymakers, health professionals and information professionals should work together to improve health literacy and support informed self-care among the population.

Originality/value

Thus far, no previous study has examined the collective role of social media exposure, health anxiety, health literacy and health information-seeking behavior as predictors of self-care behavior. Although self-care behavior among the general population might be different compared to chronic patients, only few studies have examined the former as a unit of analysis.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 6 February 2024

Shabir Ahmad Bhat, Makhmoor Bashir and Hafsah Jan

The purpose of this paper is to develop and test an integrated model to examine the relationship between work engagement and three facets of perceived job performance (PJP). The…

Abstract

Purpose

The purpose of this paper is to develop and test an integrated model to examine the relationship between work engagement and three facets of perceived job performance (PJP). The authors argue that work engagement might not optimally improve PJP unless it is channelized through information and communication technology orientation.

Design/methodology/approach

Data for the present research were collected from higher educational institutes in the northern region of India by using a convenient sampling technique. Results of structural equation modeling (SEM) through AMOS 20 revealed that work engagement facilitates all three facets i.e. task performance, contextual performance and adaptive performance of teaching professionals. Furthermore, SEM results established the partial mediating effect of information and communication technology orientation between work engagement, task performance, contextual performance and adaptive performance.

Findings

Findings from present research contribute theoretically as well as practically to job performance and work engagement literature by giving insights to administrators and practitioners on how to improve the overall job performance of teaching professionals by enhancing their engagement and addressing their need for digital know-how.

Originality/value

To the best of the authors’ knowledge, this study is one of the first to study the impact of work engagement and information and communication technology on the three facets of PJP using a diverse sample of 1030 teachers from universities in North India.

Details

Global Knowledge, Memory and Communication, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2514-9342

Keywords