Search results

1 – 10 of 58
Open Access
Article
Publication date: 5 September 2023

Andrew Ebekozien, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan

Though alternative building technologies (ABTs) have been encouraged to address accessible and affordable issues in low-cost housing (LCH) provision, their adoption is still…

Abstract

Purpose

Though alternative building technologies (ABTs) have been encouraged to address accessible and affordable issues in low-cost housing (LCH) provision, their adoption is still overwhelmed with encumbrances. The encumbrances that hinder ABT adoption require an in-depth study, especially in developing countries like Nigeria. However, studies regarding ABT and its role in improving Nigeria's LCH to achieve Sustainable Development Goal (SDG) 11 are scarce. This research investigates encumbrances to ABT adoption in Nigeria's LCH provision and suggests feasible measures to prevent or reduce the encumbrances, thereby improving achieving SDG 11 (sustainable cities and communities).

Design/methodology/approach

This research utilised qualitative research and adopted a face-to-face interview as the primary data collection. The interviewees comprised ABT practitioners and end users in Nigeria who were chosen by a convenient sampling technique. The study's data were analysed manually through a thematic approach.

Findings

This study shows that stakeholders should embrace ABT in LCH provision to improve achieving SDG 11 in Nigeria. Also, it clustered the perceived 20 encumbrances to ABT adoption in LCH provision into government/policymaker, housing developers/building contractors, ABT users and ABT manufacturers-related issues in Nigeria's context. This study suggested mechanisms to mitigate encumbrances to ABT adoption in LCH provision, thereby improving achieving SDG 11.

Originality/value

This research adds to the limited literature by analysing ABT adoption encumbrances in Nigeria's LCH provision, which could assist policy formulation for the uptake of ABT in LCH provision and improve achieving Goal 11.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 24 August 2023

Andrew Ebekozien, Wellington Didibhuku Thwala, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan

Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse…

Abstract

Purpose

Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse (BPC) but with some encumbrances, especially in developing countries. There is a paucity of research on digital technologies application to prevent or mitigate BPC in Nigeria. Thus, the research aims to explore the perceived barriers that may hinder digital technologies from preventing or mitigating building collapse and recommend measures to improve technology applications during development.

Design/methodology/approach

The study is exploratory because of the unexplored approach. The researchers collected data from knowledgeable participants in digitalisation and building collapse in Nigeria. The research employed a phenomenology approach and analysed collected data via a thematic approach. The study achieved saturation at the 29th interviewee.

Findings

Findings show that lax construction digitalisation implementation, absence of regulatory framework, lax policy, unsafe fieldworkers' behaviours, absence of basic infrastructure, government attitude, hesitation to implement and high technology budget, especially in developing countries, are threats to curbing building collapse menace via digitalisation. The study identified technologies relevant to preventing or mitigating building collapse. Also, it proffered measures to prevent or mitigate building collapse via improved digital technology applications during development.

Originality/value

This research contributes to the construction digitalisation literature, especially in developing countries, and investigates the perceived barriers that may hinder digital technologies usage in preventing or mitigating building collapse in Nigeria.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 February 2022

Salma Husna Zamani, Rahimi A. Rahman, Muhammad Ashraf Fauzi and Liyana Mohamed Yusof

Policymakers are developing government-level pandemic response strategies (GPRS) to assist architecture, engineering and construction (AEC) enterprises. However, the effectiveness…

Abstract

Purpose

Policymakers are developing government-level pandemic response strategies (GPRS) to assist architecture, engineering and construction (AEC) enterprises. However, the effectiveness of the GPRS has not been assessed. Therefore, this study aims to investigate the interrelationships between GPRS and AEC enterprises. To achieve that aim, the study objectives are to compare GPRS effectiveness between small-medium and large AEC enterprises, develop groupings to categorize interrelated GPRS and evaluate the effectiveness of the GPRS and interrelated constructs.

Design/methodology/approach

A systematic literature review and semi-structured interviews with 40 AEC industry professionals were carried out, generating 22 GPRS. Then, questionnaire survey data was collected among AEC professionals. In total, 114 valid survey answers were received and analyzed using the Kruskal–Wallis H test, normalized mean analysis, factor analysis and fuzzy synthetic evaluation.

Findings

Small-medium enterprises have four distinct critical GPRS: “form a special task force to provide support in maneuvering COVID-19,” “provide infrastructure investment budgets to local governments,” “develop employee assistance programs that fit all types of working groups” and “diversify existing supply chain.” Large enterprises have two distinct critical GPRS: “provide help in digitalizing existing construction projects” and “mandate COVID-19 as force majeure.” Eighteen GPRS can be categorized into the following five constructs: “market stability and financial aid,” “enterprise capability management,” “supply chain improvement,” “law and policy resources” and “information and workforce management.” The former two constructs are more effective than other GPRS constructs.

Originality/value

This is the first paper that evaluates the effectiveness of GPRS for AEC enterprises, providing new evidence to policymakers for well-informed decision-making in developing pandemic response strategies.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 May 2022

Lee Felix Anzagira, Daniel Duah, Edward Badu, Eric Kwame Simpeh and Alexander B. Marful

The purpose of this paper is to ascertain the significant stimulating measures/enablers relating to the existing building regulations for promoting the adoption and overcoming the…

Abstract

Purpose

The purpose of this paper is to ascertain the significant stimulating measures/enablers relating to the existing building regulations for promoting the adoption and overcoming the barriers to the uptake and implementation of the green building concept (GBC) in developing countries using Ghana as a case.

Design/methodology/approach

The quantitative research approach was used to attain the study’s goal. Purposive and snowball sampling techniques were found to be suitable for collecting data from 292 relevant stakeholders in Ghana’s construction industry. The mean score ranking technique, in conjunction with the relative importance index, was used to establish the relative ranking of, among other things, the stimulus measures for increasing green building uptake in Ghana. An exploratory factor analysis was also used to classify the most significant stimulation strategies for improving green building uptake.

Findings

“Educational programmes relevant to GBTs for developers, contractors, and policymakers,” “sufficient information on the cost and benefits of GBTs” and “mandated green building codes and regulations” were the top three listed stimulating measures to promote increasing use of green building technologies (GBTs). The enablers were classified as follows: government regulations and policies; commitment and GB research; education and publicity; and incentives and support.

Research limitations/implications

The study was conducted in Ghana, a developing nation, and thus the findings and implications are peculiar to Ghana. However, the study’s findings have important practical implications for the adoption and marketing of GBCs and GBTs in other developing nations.

Originality/value

Prioritizing major stimulation initiatives may be beneficial in terms of overcoming the constraints to the adoption of GBCs and GBTs in developing countries.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 1 June 2023

Nur Azliani Haniza Che Pak, Suhaiza Ismail and Norhayati Mohd Alwi

The purpose of this paper is to help better understand the translation process of the management control system (MCS) of privatised solid waste management (SWM) towards creating a…

Abstract

Purpose

The purpose of this paper is to help better understand the translation process of the management control system (MCS) of privatised solid waste management (SWM) towards creating a stable network.

Design/methodology/approach

Drawing on the actor network theory (ANT), the case of a privatised SWM was studied. Data were collected from all entities involved in the privatisation process of SWM, which include Department A, Corporation X and the private sector concessionaire. Six documents were reviewed, 20 interviews were conducted and two observations were carried out.

Findings

The findings reveal that the control mechanism of SWM is complex, involving the interaction between human and non-human actors. Non-human actors include the key performance indicators (KPIs) and the concessionaire agreement (CA), which are the main control mechanisms towards creating a stable SWM network. Essentially, stability is achieved when the KPIs and CA can influence the activities of both intra- and inter-organisational relationships.

Originality/value

This paper provides a better understanding of the translation process of the MCS that adds to the stability of the network of a privatised SWM from the lens of the ANT.

Details

Journal of Accounting & Organizational Change, vol. 20 no. 2
Type: Research Article
ISSN: 1832-5912

Keywords

Case study
Publication date: 14 September 2023

Brooke Klassen, Dana Carriere and Irma Murdock

To ensure that students are well prepared to successfully analyze this case, they should be familiar with the following concepts, theories and principles:▪ Stakeholder theory…

Abstract

Theoretical basis

To ensure that students are well prepared to successfully analyze this case, they should be familiar with the following concepts, theories and principles:

▪ Stakeholder theory

▪ Concept of duty to consult and accommodate

▪ Concept of social license to operate (SLO)

▪ Concept of indigenous economic self-determination

▪ Indigenous world view

▪ Seventh generation principle

▪ Cree principles

▪ Dene principles

Research methodology

The information provided in this case was gathered by the authors through face-to-face interviews, phone interviews, e-mail exchanges and secondary research. Meadow Lake Tribal Council (MLTC) separates business operations from council operations through use of corporate entities (as shown in Exhibit 1 of the case). Meadow Lake Tribal Council II (MLTCII) is the corporate entity that oversees two companies referenced in the case: Mistik Management and NorSask Forest Products LP. Interviews were conducted with the General Manager at Mistik Management, Certification Coordinator at Mistik Management, Chief of Buffalo River Dene Nation, Chief of Waterhen Lake First Nation, MLTC Vice-Chief, Board Member and Advisor to MLTCII, President and CEO of MLTCII, MLTCII Business Development Consultant and a former consultant with MLTC, NorSask Forest Products and Mistik Management.

Case overview/synopsis

Mistik Management Ltd., a forestry management company co-owned by the nine First Nations of MLTC, was a leader in economic reconciliation in 2022. However, the company had dealt with significant challenges not long after it was established in 1989. Richard Gladue, former Chief of the one of MLTCs Member First Nations and a leader in economic development at MLTC, had been actively involved in establishing the organization. Gladue loved the life and vitality of the boreal forest in the Meadow Lake region and felt a sense of responsibility to take care of the forest and the land for generations to come. This responsibility was balanced with the acknowledgement that the forest also provided vast economic development, employment and wealth generation opportunities for MLTC and its Member First Nations.

In the early 1990s, MLTC and Mistik Management dealt with a year-long blockade by a group of protesters that included members of Canoe Lake Cree First Nation, one of the Member First Nations of MLTC. They had not been consulted on Mistik’s processes and policies, and the company’s clear-cut logging had affected their ability to continue their traditional way of life and practices on the land. After the incident, Mistik Management moved more quickly to invest in a co-management process that they were still refining and using in 2022 when consulting with Indigenous groups and communities.

A natural resource economy brings together Indigenous peoples, industry and government. In this case, students will learn about the important role that relationships play and how decisions are made when balancing complex legal, environmental and economic interests. Students will learn about the history of duty to consult and accommodate in Canada; conduct a stakeholder analysis and reflect on how decisions affect stakeholder interests; and make recommendations for meaningful Indigenous engagement strategies using the concept of social license and indigenous principles.

Complexity academic level

This case is suitable for use in undergraduate courses on indigenous business, ethical decision-making, public policy and/or natural resource development. There may also be applications in other fields of study, including anthropology, economics and political science.

If the case is used in an indigenous business course, it would be best positioned in the last third of the class, after topics such as duty to consult and accommodate, social license and meaningful engagement with indigenous communities have been covered. If used in an ethical decision-making course, it would be best used when discussing stakeholder theory and engaging in stakeholder analysis. If used in a public policy course, the case could be used to start a discussion around the duty to consult and accommodate indigenous communities in Canada. If used in a natural resource development course, the case would be best used as an example of indigenous economic development.

Open Access
Article
Publication date: 19 April 2024

Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…

Abstract

Purpose

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.

Design/methodology/approach

The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.

Findings

The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.

Practical implications

The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.

Originality/value

This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.

Details

LBS Journal of Management & Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0972-8031

Keywords

Open Access
Article
Publication date: 1 August 2023

Jacob Guerrero and Susanne Engström

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving…

Abstract

Purpose

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving innovation in the transport infrastructure sector.

Design/methodology/approach

Addressing a large public client in Sweden, a case study design was initially applied to provide in-depth insights and perspectives of client project managers’ views and experiences of managing projects expected to drive innovation. In this paper, the concepts of “hard” and “soft” are used to discuss empirical findings on challenges associated with adopting a PM-approach for driving innovation in projects. The empirical material consists of interview data, complemented with observations and archival data.

Findings

Findings reveal challenges associated with combining hard and soft approaches, frequently demonstrating difficulties in balancing short-term project expectations with the promotion of innovation. In line with the literature, project managers note that there is a need for soft approaches to promote development and drive innovation. Yet, findings reflect a situation in which operational success criteria predominate, whereas soft approaches are not sufficiently used to create the grounds required for fostering innovation.

Originality/value

Insights are provided into how PM-approaches may impact construction innovation in the infrastructure sector, demonstrating a need for further research on the challenges and implications of applying and combining hard and soft PM-approaches.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 58