Search results
1 – 10 of 800Jonas Gamso, Andrew Inkpen and Kannan Ramaswamy
Geopolitical risks associated with the return of great power politics and growing nationalism have generated new challenges for foreign investors across industries. Oil and gas…
Abstract
Purpose
Geopolitical risks associated with the return of great power politics and growing nationalism have generated new challenges for foreign investors across industries. Oil and gas companies are well acquainted with such risks and have developed strategies to manage them. This paper reviews five of these strategies: divorcing ownership control from operating control in designing collaborative ventures; proactively managing stakeholder relationships; ensuring transparency and communication; diversifying risks while proactively positioning for emerging opportunities; and deliberately planning for exit should such an eventuality arise. Firms outside of oil and gas can draw on these strategies as they navigate the emerging geopolitical context.
Design/methodology/approach
This paper reviews five strategies that oil and gas companies can use to manage geopolitical risk: divorcing ownership control from operating control in designing collaborative ventures; proactively managing stakeholder relationships; ensuring transparency and communication; diversifying risks while proactively positioning for emerging opportunities; and deliberately planning for exit should such an eventuality arise.
Findings
This study identifies several strategies that oil and gas companies have used to manage geopolitical risks. These tools will be increasingly important in the shifting global political landscape.
Originality/value
Drawing on the experiences of oil and gas companies, this study has identified several strategies that companies can use to shield themselves from the risks that are currently emanating from geopolitics. While these best practices originate in the experiences of oil and gas firms, the ability to deftly manage geopolitical risks is becoming an important prerequisite for companies across industries.
Details
Keywords
Fahim Ullah, Oluwole Olatunji and Siddra Qayyum
Contemporary technological disruptions are espoused as though they stimulate sustainable growth in the built environment through the Green Internet of Things (G-IoT). Learning…
Abstract
Purpose
Contemporary technological disruptions are espoused as though they stimulate sustainable growth in the built environment through the Green Internet of Things (G-IoT). Learning from discipline-specific experiences, this paper articulates recent advancements in the knowledge and concepts of G-IoT in relation to the construction and smart city sectors. It provides a scoping review for G-IoT as an overlooked dimension. Attention was paid to modern circularity, cleaner production and sustainability as key benefits of G-IoT adoption in line with the United Nations’ Sustainable Development Goals (UN-SDGs). In addition, this study also investigates the current application and adoption strategies of G-IoT.
Design/methodology/approach
This study uses the Preferred Reporting Items for Systematic and Meta-Analyses (PRISMA) review approach. Resources are drawn from Scopus and Web of Science repositories using apt search strings that reflect applications of G-IoT in the built environment in relation to construction management, urban planning, societies and infrastructure. Thematic analysis was used to analyze pertinent themes in the retrieved articles.
Findings
G-IoT is an overlooked dimension in construction and smart cities so far. Thirty-three scholarly articles were reviewed from a total of 82 articles retrieved, from which five themes were identified: G-IoT in buildings, computing, sustainability, waste management and tracking and monitoring. Among other applications, findings show that G-IoT is prominent in smart urban services, healthcare, traffic management, green computing, environmental protection, site safety and waste management. Applicable strategies to hasten adoption include raising awareness, financial incentives, dedicated work approaches, G-IoT technologies and purposeful capacity building among stakeholders. The future of G-IoT in construction and smart city research is in smart drones, building information modeling, digital twins, 3D printing, green computing, robotics and policies that incentivize adoption.
Originality/value
This study adds to the normative literature on envisioning potential strategies for adoption and the future of G-IoT in construction and smart cities as an overlooked dimension. No previous study to date has reviewed pertinent literature in this area, intending to investigate the current applications, adoption strategies and future direction of G-IoT in construction and smart cities. Researchers can expand on the current study by exploring the identified G-IoT applications and adoption strategies in detail, and practitioners can develop implementation policies, regulations and guidelines for holistic G-IoT adoption.
Details
Keywords
Mariam Bader, Jiju Antony, Raja Jayaraman, Vikas Swarnakar, Ravindra S. Goonetilleke, Maher Maalouf, Jose Arturo Garza-Reyes and Kevin Linderman
The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six…
Abstract
Purpose
The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six Sigma and Agile. Proposing a mitigation framework accordingly is also an aim of this study.
Design/methodology/approach
This research undertakes a systematic literature review of 49 papers that were relevant to the scope of the study and that were published in four prominent databases, including Google Scholar, Scopus, Web of Science and EBSCO.
Findings
Further analysis identifies 39 factors that contribute to the failure of PI projects. Among these factors, significant emphasis is placed on issues such as “resistance to cultural change,” “insufficient support from top management,” “inadequate training and education,” “poor communication” and “lack of resources,” as primary causes of PI project failures. To address and overcome the PI project failures, the authors propose a framework for failure mitigation based on change management models. The authors present future research directions that aim to enhance both the theoretical understanding and practical aspects of PI project failures.
Practical implications
Through this study, researchers and project managers can benefit from well-structured guidelines and invaluable insights that will help them identify and address potential failures, leading to successful implementation and sustainable improvements within organizations.
Originality/value
To the best of the author’s knowledge, this paper is the first study of its kind to examine the CFFs of five PI methodologies and introduces a novel approach derived from change management theory as a solution to minimize the risk associated with PI failure.
Details
Keywords
Mika Luhtala, Olga Welinder and Elina Vikstedt
This study aims to investigate the adoption of the United Nations’ Sustainable Development Goals (SDGs) as the new performance perspective in cities. It also aims to understand…
Abstract
Purpose
This study aims to investigate the adoption of the United Nations’ Sustainable Development Goals (SDGs) as the new performance perspective in cities. It also aims to understand how accounting for SDGs begins in city administrations by following Power’s (2015) fourfold development schema composed of policy object formation, object elaboration, activity orchestration and practice stabilization.
Design/methodology/approach
Focusing on a network of cities coordinated by the Finnish local government association, we analyzed the six largest cities in Finland employing a holistic multiple case study strategy. Our data consisted of Voluntary Local Reviews (VLRs), city strategies, budget plans, financial statements, as well as results of participant observations and semi-structured interviews with key individuals involved in accounting for SDGs.
Findings
We unveiled the SDG framework as an interpretive scheme through which cities glocalized sustainable development as a novel, simultaneously global and local, performance object. Integration of the new accounts in city management is necessary for these accounts to take life in steering the actions. By creating meaningful alignment and the ability to impact managerial practices, SDGs and VLRs have the potential to influence local actions. Our results indicate further institutionalization progress of sustainability as a performance object through SDG-focused work.
Originality/value
While prior research has focused mainly on general factors influencing the integration of the sustainability agenda, this study provides a novel perspective by capturing the process and demonstrating empirically how new accounts on SDGs are introduced and deployed in the strategic planning and management of local governments.
Details
Keywords
Olabode Emmanuel Ogunmakinde, Temitope Egbelakin, Willy Sher, Temitope Omotayo and Mercy Ogunnusi
Establishing a more sustainable built environment is an increasing global concern for the construction industry. Despite the intrinsic and extrinsic obstacles the stakeholders…
Abstract
Purpose
Establishing a more sustainable built environment is an increasing global concern for the construction industry. Despite the intrinsic and extrinsic obstacles the stakeholders face, huge efforts are required to transition to a smooth, sustainable construction (SC) practice. This study identifies and discusses cogent obstacles to SC in developing nations.
Design/methodology/approach
The Preferred Reporting Item for systematic reviews and Meta-Analysis (PRISMA) approach was employed to establish research work in SC for developing countries. The databases used were Scopus and Web of Science. Meta-analysis of keywords was analysed thematically. The initial broad search returned 8,420 publications which were filtered and reviewed in-depth to fit the aim of the study, produced only 21 relevant publications from the years 2000–2021.
Findings
The four identified themes of obstacles to SC in developing countries are as follows: construction professional training and education, clients' attitudes and awareness, construction industries' culture and capacity and governments' regulation, policies and economy. The key barriers identified from the meta-analysis include inadequate training and education amongst construction professionals, poor execution of sustainability ethics, poor populace attitude towards sustainability, poor awareness and understanding, dearth of precise data and integrated study and inappropriate priorities about sustainability.
Originality/value
The originality in this study are themes drawn from millennium development goals (MDGs) and sustainable development goals (SDGs) publications related to SC. Consequently, the final framework presented a holistic approach to surmounting the established limitations and aided recommendations for future studies. Thus, setting a background for developing strategies to overcome the limitations and further attain sustainable development (SD).
Details
Keywords
Mahmoud Sabry Shided Keniwe, Ali Hassan Ali, Mostafa Ali Abdelaal, Ahmed Mohamed Yassin, Ahmed Farouk Kineber, Ibrahim Abdel-Rashid Nosier, Ola Diaa El Monayeri and Mohamed Ashraf Elsayad
This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to…
Abstract
Purpose
This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to identify these crucial PFs and secondly, to develop a robust performance model capable of effectively measuring and assessing the intricate interdependencies and correlations within ISSPs. By achieving these objectives, the study aimed to provide valuable insights into and tools for enhancing the efficiency and effectiveness of sanitation projects in the construction industry.
Design/methodology/approach
To achieve the study's aim, the methodology for identifying the PFs for ISSPs involved several steps: extensive literature review, interviews with Egyptian industry experts, a questionnaire survey targeting industry practitioners and an analysis using the Relative Importance Index (RII), Pareto principle and analytic network process (ANP). The RII ranked factor importance, and Pareto identified the top 20% for ANP, which determined connections and interdependencies among these factors.
Findings
The literature review identified 36 PFs, and an additional 13 were uncovered during interviews. The highest-ranked PF is PF5, while PF19 is the lowest-ranked. Pareto principle selected 11 PFs, representing the top 20% of factors. The ANP model produced an application for measuring ISSP effectiveness, validated through two case studies. Application results were 92.25% and 91.48%, compared to actual results of 95.77% and 97.37%, indicating its effectiveness and accuracy, respectively.
Originality/value
This study addresses a significant knowledge gap by identifying the critical PFs that influence ISSPs within the construction industry. Subsequently, it constructs a novel performance model, resulting in the development of a practical computer application aimed at measuring and evaluating the performance of these projects.
Details
Keywords
Hiba Alkhalaf, Alaa Elhabashi, Yassmen Hesham, Abdulsalam Hiba, Abdulkader Omaar, Hafed Walda and Will Thomas Wootton
This paper introduces a methodology to identify, analyse and represent heritage site attributes, emphasizing their impact on value, authenticity, integrity and management, with a…
Abstract
Purpose
This paper introduces a methodology to identify, analyse and represent heritage site attributes, emphasizing their impact on value, authenticity, integrity and management, with a case study on Ghadames, Libya. Inscribed in 1986 and moved to the In-Danger List in 2016 due to conflict, this work seeks to update the site's attributes and values for improved management.
Design/methodology/approach
This methodology, focusing on Ghadames, leverages recent heritage management advancements to monitor conflict-induced changes, aiming to enhance decision-making through a detailed analysis of the site's natural and cultural attributes.
Findings
Our findings highlight the need for systematic and holistic assessments of heritage site attributes and values, crucial for managing sites of both local and global significance. This approach is a key to understanding their identity, guiding interpretation, management and preserving cultural significance.
Research limitations/implications
Developed for Ghadames, the methodology requires adaptation for other sites, underscoring the importance of identifying core tangible and intangible attributes that define a site's uniqueness.
Practical implications
Our developed methodology offers a replicable framework that can be modified by local heritage professionals to map attributes and assess the direct and indirect impact of conflict on heritage sites.
Originality/value
The detailed assessment provides a foundation for crafting informed policies and effective management strategies. It specifically targets minimizing the adverse effects of conflict on heritage sites' attributes. This effort is instrumental in preparing the necessary documentation to support the delisting of these sites from the UNESCO World Heritage Site In-Danger List, promoting their preservation and recovery.
Details
Keywords
Ewald Kuoribo, Peter Amoah, Ernest Kissi, David John Edwards, Jacob Anim Gyampo and Wellington Didibhuku Thwala
Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work…
Abstract
Purpose
Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work outside of their geographical spectrum; however, the multicultural dissimilarities of construction workforces within the project management team (and how these may impact upon project productivity performance) have been given scant academic attention. To bridge this knowledge gap, this paper aims to analyse the effects of a multicultural workforce on construction productivity.
Design/methodology/approach
The epistemological positioning of the research adopted mixed philosophies (consisting of both interpretivism and postpositivism) to undertake a deductive and cross-sectional survey to collate primary quantitative data collected via a closed-ended structured questionnaire. Census sampling and convenience sampling techniques were adopted to target Ghana’s construction workforce and their opinions of the phenomenon under investigation. Out of 96 questionnaires administered, 61 were retrieved. The data obtained were analysed by using mean score ranking, relative important index, one sample t-test and multiple regression. The reliability of the scale was checked by using Cronbach’s alpha coefficient.
Findings
From the t-test analysis, 11 variables sourced from extant literature, and the null hypothesis for the study was not rejected and all factors (except high cost of training and improper gender diversity management) were affirmed as negative effects of the multicultural workforce on construction productivity. Using multiple regression analysis, six of the independent variables were shown to impact upon productivity. The goodness of fit was verified by collinearity and residual analysis. The model’s validation revealed a relatively high predictive accuracy (R2 = 0. 589), implying that the results could be generalized. In culmination, these findings suggest that the predictors can be used to accurately predict the effects of multicultural workforce on construction productivity performance.
Practical implications
The findings indicate that multicultural workforce/teams have a substantial effect on overall construction productivity in the construction sector; consequently, stakeholders must address this issue to enhance productivity across the sector.
Originality/value
The current study significantly contributes to our understanding of how multicultural workers/teams affect construction productivity in the construction business perspective and how to respond to the negative menace.
Details
Keywords
Atul Kumar Singh and V.R.Prasath Kumar
Implementing blockchain in sustainable development goals (SDGs) and environmental, social and governance (ESG)-aligned infrastructure development involves intricate strategic…
Abstract
Purpose
Implementing blockchain in sustainable development goals (SDGs) and environmental, social and governance (ESG)-aligned infrastructure development involves intricate strategic factors. Despite technological advancements, a significant research gap persists, particularly in emerging economies. This study aims to address the challenges related to SDGs and ESG objectives during infrastructure delivery remain problematic, identifying and evaluating critical strategic factors for successful blockchain implementation.
Design/methodology/approach
This study employs a three-stage methodology. Initially, 13 strategic factors are identified through a literature review and validated by conducting semi-structured interviews with six experts. In the second stage, the data were collected from nine additional experts. In the final stage, the collected data undergoes analysis using interpretive structural modeling (ISM)–cross-impact matrix multiplication applied to classification (MICMAC), aiming to identify and evaluate the independent and dependent powers of strategic factors driving blockchain implementation in infrastructure development for SDGs and ESG objectives.
Findings
The study’s findings highlight three significant independent factors crucial for successfully integrating blockchain technology (BT) into infrastructure development for SDGs and ESG goals: data security (F4), identity management (F8) and supply chain management (F7). The study unravels these factors, hierarchical relationships and dependencies by applying the MICMAC and ISM techniques, emphasizing their interconnectedness.
Originality/value
This study highlights critical strategic factors for successful blockchain integration in SDG and ESG-aligned infrastructure development, offering insights for policymakers and practitioners while emphasizing the importance of training and infrastructure support in advancing sustainable practices.
Details
Keywords
Anne-Sophie Thelisson and Olivier Meier
Organizational resilience, defined by a firm’s speed in reaching a dynamic equilibrium after a shock and after the shocks are absorbed, and crisis management are critical in a…
Abstract
Purpose
Organizational resilience, defined by a firm’s speed in reaching a dynamic equilibrium after a shock and after the shocks are absorbed, and crisis management are critical in a global crisis. The concept of resilience is increasingly used in the economic press; nevertheless, few studies demonstrate empirically how firms became resilient and the lessons to be learned from it. Traditionally, the concept of resilience is approached as resistance in the face of a crisis. The authors go further by showing three-loop learning, which is part of a logic of innovation and regeneration. This study aims to examine how a business can regenerate itself by effectively managing the external threats and disruptions caused by a crisis. Also, this study deepens knowledge on learning process. The double-loop learning process is known in the literature as enabling firms to learn from unexpected events and react accordingly. The findings point out a third loop implying the co-invention of a new business model and a collective mindfulness of changes made.
Design/methodology/approach
Using longitudinal data, the authors investigate how the global crisis affects merger negotiations between two companies. This study analyzes the period of dialogue (negotiation) between the two entities with a view to carrying out a merger and then their withdrawal from the project during the pandemic, reshuffling the cards for each company. The negotiation period is not normally disclosed because of its highly confidential and strategic nature and it is therefore difficult for researchers to access merger operations at the negotiation stage. From this viewpoint, this case study was chosen because of the availability of generally inaccessible documentation.
Findings
This in-depth case study provides new insights on organizational resilience and the recovery capacity of a firm. The results underline four main triggers that a firm should develop in facing a major crisis: skills; credits; previous and historical relationships; and corporate culture. Recovery capacity depends on reactivity, flexibility, learning and regeneration. Finally, this study points out a three-loop learning experience that can be understood as a learning process in two steps to generate lasting and adaptive changes.
Research limitations/implications
The limitations are those concerning a single case study.
Practical implications
This study highlights the ability to deal with unexpected events. First, this work identifies concrete items that can be perceived by managers as elements enabling a firm to develop resilience. Second, the results show main elements enabling this capacity as reactivity – both companies react quickly and effectively to disturbances to limit the impact on their performance; or flexibility – firms adapt their business model to deal with disruptions. Third, this work underlines a learning capacity process in three steps to recover capacity. This process stimulates creativity and innovation by the teams and stakeholders by placing them at the heart of the change.
Originality/value
This case provides a vivid illustration of firms’ adaptation to a rapidly evolving context because of a global crisis. Theoretical concepts and empirical findings from the literature are combined to present a single consistent picture.
Details