Article
Publication date: 25 June 2019

Georgios N. Aretoulis, Jason Papathanasiou and Fani Antoniou

This paper aims to rank and identify the most efficient project managers (PMs) based on personality traits, using Preference Ranking Organization METHod for Enrichment Evaluations…

355

Abstract

Purpose

This paper aims to rank and identify the most efficient project managers (PMs) based on personality traits, using Preference Ranking Organization METHod for Enrichment Evaluations (PROMETHEE) methodology.

Design/methodology/approach

The proposed methodology relies on the five personality traits. These were used as the selection criteria. A questionnaire survey among 82 experienced engineers was used to estimate the required weights per personality trait. A second two-part questionnaire survey aimed at recording the PMs profile and assess the performance of personality traits per PM. PMs with the most years of experience are selected to be ranked through Visual PROMETHEE.

Findings

The findings suggest that a competent PM is the one that scores low on the “Neuroticism” trait and high especially on the “Conscientiousness” trait.

Research limitations/implications

The research applied a psychometric test specifically designed for Greek people. Furthermore, the proposed methodology is based on the personality characteristics to rank the PMs and does not consider the technical skills. Furthermore, the type of project is not considered in the process of ranking PMs.

Practical implications

The findings could contribute in the selection of the best PM that maximizes the project team’s performance.

Social implications

Improved project team communication and collaboration leading to improved project performance through better communication and collaboration. This is an additional benefit for the society, especially in the delivery of public infrastructure projects. A lot of public infrastructure projects deviate largely as far as cost and schedule is concerned and this is an additional burden for public and society. Proper project management through efficient PMs would save people’s money and time.

Originality/value

Identification of the best PMbased on a combination of multicriteria decision-making and psychometric tests, which focus on personality traits.

Article
Publication date: 17 July 2019

Magdalini Titirla and Georgios Aretoulis

This paper aims to examine selected similar Greek highway projects to create artificial neural network-based models to predict their actual construction duration based on data…

Abstract

Purpose

This paper aims to examine selected similar Greek highway projects to create artificial neural network-based models to predict their actual construction duration based on data available at the bidding stage.

Design/methodology/approach

Relevant literature review is presented that highlights similar research approaches. Thirty-seven highway projects, constructed in Greece, with similar type of available data, were examined. Considering each project’s characteristics and the actual construction duration, correlation analysis is implemented, with the aid of SPSS. Correlation analysis identified the most significant project variables toward predicting actual duration. Furthermore, the WEKA application, through its attribute selection function, highlighted the most important subset of variables. The selected variables through correlation analysis and/or WEKA and appropriate combinations of these are used as input neurons for a neural network. Fast Artificial Neural Network (FANN) Tool is used to construct neural network models in an effort to predict projects’ actual duration.

Findings

Variables that significantly correlate with actual time at completion include initial cost, initial duration, length, lanes, technical projects, bridges, tunnels, geotechnical projects, embankment, landfill, land requirement (expropriation) and tender offer. Neural networks’ models succeeded in predicting actual completion time with significant accuracy. The optimum neural network model produced a mean squared error with a value of 6.96E-06 and was based on initial cost, initial duration, length, lanes, technical projects, tender offer, embankment, existence of bridges, geotechnical projects and landfills.

Research limitations/implications

The sample size is limited to 37 projects. These are extensive highway projects with similar work packages, constructed in Greece.

Practical implications

The proposed models could early in the planning stage predict the actual project duration.

Originality/value

The originality of the current study focuses both on the methodology applied (combination of Correlation Analysis, WEKA, FannTool) and on the resulting models and their potential application for future projects.

Details

Journal of Engineering, Design and Technology , vol. 17 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Content available
Article
Publication date: 8 April 2020

Georgios Tsaples, Jason Papathanasiou and Stefano Armenia

342

Abstract

Details

Kybernetes, vol. 49 no. 4
Type: Research Article
ISSN: 0368-492X