Article
Publication date: 1 November 2006

Geoffrey Q.P. Shen and Jacky K.H. Chung

This paper aims to investigate briefing in the construction industry in Hong Kong. Specifically, it sets out to discover the current practices on briefing in the industry and the…

1555

Abstract

Purpose

This paper aims to investigate briefing in the construction industry in Hong Kong. Specifically, it sets out to discover the current practices on briefing in the industry and the limitations of these practices.

Design/methodology/approach

This study consists of a literature review and a pilot study, structured focus group interviews and semi‐structured interviews.

Findings

The study has revealed that current practices, although have been in operation for a long time, have a number of limitations such as lacking in a comprehensive framework; lacking in identification of client requirements; lacking in contributions from clients; lacking in involvement of stakeholders; and inadequate time spent on the briefing. It is concluded that these limitations must be properly addressed by the industry in order to improve the briefing and to avoid subsequent problems in the design and construction phases, and that more resources should be allocated.

Originality/value

So far, little work has been undertaken to study the practice of briefing in sufficient depth in the construction industry in Hong Kong. This paper improves our comprehension of the nature of client requirements and provides valuable insights into the details of briefing in the public and private sectors of the local industry.

Details

Facilities, vol. 24 no. 13/14
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 25 May 2010

Ann T.W. Yu, Geoffrey Q.P. Shen and Edwin H.W. Chan

The purpose of this paper is to explore existing problems and potential solutions of managing Employers' Requirements in the project development process of construction projects…

1451

Abstract

Purpose

The purpose of this paper is to explore existing problems and potential solutions of managing Employers' Requirements in the project development process of construction projects under traditional procurement systems.

Design/methodology/approach

Two research instruments are used: semi‐structured interview and questionnaire survey, to investigate the problems and potential solutions to Requirements Management in the construction industry.

Findings

The research revealed that Requirements Management is crucial to the successful delivery of construction projects. However, the current practice of Requirements Management in the industry is informal and there is a lack of a systematic approach to tackle the problems. The authors also propose potential solutions to Requirements Management as well as a vision for further research.

Practical implications

The paper presents the problems of managing Employers' Requirements, and the potential solutions to improve the Requirements Management process that need to be addressed.

Originality/value

The paper improves one's comprehension of the nature, characteristics, problems and potential solutions of Requirements Management in the project development process under the traditional procurement systems in the construction industry, relevant to both practitioners and scholars. A model is proposed as a “preliminary framework” to show the processes involved.

Details

Facilities, vol. 28 no. 7/8
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 29 March 2013

Ann T.W. Yu and Geoffrey Q.P. Shen

This paper aims to focus on requirements management of projects constructed under traditional procurement system. It seeks to discuss the requirements management processes…

6161

Abstract

Purpose

This paper aims to focus on requirements management of projects constructed under traditional procurement system. It seeks to discuss the requirements management processes highlighting the limitations and addressing the need for a practical framework for facilitating the implementation of requirements management in the construction industry.

Design/methodology/approach

Two research instruments were used in this paper: semi‐structured interviews and case studies.

Findings

The literature review introduced a generic process for requirements management practice potentially to be adopted in the construction industry. The research study identified that the processes and limitations of current practice included the lack of a practical framework, misinterpretation of requirements, difficulties in identifying requirements, conflicts between expectation and constraints, complex hierarchy of client's organisation and communication problems in eliciting client requirements. Recommendations are given that an inclusive project brief and a competent project manager to manage the project requirements are necessary in capturing and tracing the requirements during the project development process. A practical framework is needed to improve the requirements management practice within the construction industry.

Research limitations/implications

The research findings establish the basis for further research to examine the implementation of these potential solutions and development of a systematic framework for RsM. The research is of significant value to the construction industry where value generation is essential and critical, especially in difficult economic and financial situations.

Originality/value

Requirements are the foundation of the projects which are critical to the successful delivery of the projects. Although many guidelines have been published for managing client requirements, the existing practice on requirements management is still considered to be inadequate. This research provides insight for professional practitioners in the construction industry to improve the requirements management practices for development projects.

Article
Publication date: 6 April 2021

Bao Ngoc Nguyen, Kerry London and Peng Zhang

This paper aims to report a comprehensive analysis of literature on stakeholder relationships towards identifying patterns of relationships within the off-site construction…

Abstract

Purpose

This paper aims to report a comprehensive analysis of literature on stakeholder relationships towards identifying patterns of relationships within the off-site construction context.

Design/methodology/approach

Key scholarly databases were accessed and after a filtering process, 74 relevant papers were retrieved for analysis. The papers were analysed using qualitative content analysis and scientometric techniques through the application of software Leximancer and VOSviewer.

Findings

Research synthesis methods used in the present study generate compatible results. Through text mining analysis, the key themes identified in the off-site construction stakeholder relationships literature included “collaboration”, “building information modelling”, “social network analysis”, supply chain. As a finding by scientometric analysis, collaboration, BIM, supply chain management, housing and social network analysis were the most frequently entered keywords context of off-site construction. Regarding authorship pattern, the whole network of collaboration was fragmented into multiple isolated clusters, implying that the authors had tendency to cooperate in small groups.

Practical implications

The paper can bring together an important area of research not previously studied in detail. It will primarily assist academics in the first instance; however, the research leads to important findings that will ultimately assist policymakers and practitioners better understand factors affecting stakeholder relationships and in particular network thinking and collaborative mind-sets.

Originality/value

The review contributes a needed systematic and theoretical foundation for future stakeholder relationship studies and practices in off-site construction sector. It provides the basis for future studies and is a seminal analysis of stakeholder management and off-site construction. The scientometric methodology offers scholars a different approach to analysing and visualising literature reviews.

Article
Publication date: 23 February 2024

Xinnan Liu, Jiani Meng, Jiayi Wang and Yingbo Ji

This study adopts the perspective of dynamic capabilities to investigate influencing factors and proposes improvement strategies of supply chain resilience of prefabricated…

Abstract

Purpose

This study adopts the perspective of dynamic capabilities to investigate influencing factors and proposes improvement strategies of supply chain resilience of prefabricated construction.

Design/methodology/approach

The structural equation model (SEM) is used to identify and verify the relationship between factors influencing supply chain resilience of prefabricated construction from the perspective of dynamic capabilities. The system dynamics (SD) model is constructed to dynamically simulate the specific effects of different influencing factors.

Findings

Results indicate that: (1) An evaluation index system for supply chain resilience of prefabricated construction containing five first-level indicators and 36 second-level indicators is constructed; (2) Ability to anticipate, ability to respond, ability to adapt, ability to recover and ability to learn are positively correlated with the supply chain resilience of prefabricated construction and (3) ANT3 (information system), RES1 (quick response), ADA3 (buffer stock) and LEA4 (trust) are the most leading factors influencing supply chain resilience of prefabricated construction over time.

Originality/value

This study fulfills the need for an in-depth exploration of the various influencing factors on supply chain resilience of prefabricated construction from the perspective of dynamic capabilities. Furthermore, this study provides improvement strategies to enhance supply chain resilience of prefabricated construction in China.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 April 2020

Ibrahim Yahaya Wuni and Geoffrey Qiping Shen

Prefabricated prefinished volumetric construction (PPVC) projects are industrialized building systems that are co-created. Thus, effective management of the involved stakeholders…

Abstract

Purpose

Prefabricated prefinished volumetric construction (PPVC) projects are industrialized building systems that are co-created. Thus, effective management of the involved stakeholders is required to ensure project success. However, knowledge of how best to manage the diverse stakeholders in PPVC projects is limited. This research identified and prioritized the success factors or key result areas (KRAs) for the effective stakeholder management (SM) in PPVC projects.

Design/methodology/approach

A quantitative research design was implemented involving a literature review and structured questionnaire survey with international PPVC experts. The research identified and statistically analysed 12 KRAs for SM in PPVC projects.

Findings

Analysis showed that the top three KRAs for SM in PPVC projects include: effective working collaboration, communication and information sharing among participants; effective coordination of the PPVC supply chain segments; and early involvement of relevant stakeholders in the PPVC project. A factor analysis clustered the 12 KRAs into stakeholder analysis and early involvement, effective communication and information sharing and stakeholder interest integration and conflict management.

Practical implications

The paper identified and prioritized the KRAs required for the effective SM in PPVC projects. To practitioners, the results may serve as decision support on the key areas to focus to ensure effective SM in PPVC projects and may guide the efficient allocation of limited resources.

Originality/value

This research constitutes the first exclusive attempt at identifying and benchmarking the generic KRAs required for effective SM in PPVC projects and contributes to the SM body of knowledge in industrialized construction.

Details

Built Environment Project and Asset Management, vol. 10 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 1 February 2022

Jin Xue, Geoffrey Qiping Shen, Xiaomei Deng, Adedayo Johnson Ogungbile and Xiaoling Chu

Relationship management evolves with dynamic and complex environments of megaprojects. However, studies on the longitudinal measurement of relationship management performance for…

Abstract

Purpose

Relationship management evolves with dynamic and complex environments of megaprojects. However, studies on the longitudinal measurement of relationship management performance for each stakeholder in dynamic and complex project environments are lacking. The purpose of this research is to propose an NK-network evolution model to evaluate stakeholder performance on relationship management in the development of megaprojects.

Design/methodology/approach

The model input includes the stakeholder-associated issues and stakeholders' relational strategies, the co-effects of which determine the internal effects of relationship management in megaprojects. The model processing simulates the stakeholder performance of relationship management under the dynamic and complex nature of megaprojects. The NK model shows the dynamic stakeholder interactions on relationship management, whereas the network model presents the complex stakeholder structures of the relationships between stakeholders and relevant issues. The model output is the evolution graph to reveal the weak stakeholder performance on relationship management in the timeline of the project duration.

Findings

The research finding reveals that all stakeholders experience the plunge of stakeholder performance of relationship management at the decision-making moment of the planning stage. Construction, environmental and pressure groups may experience the hardship of relationship management at the start of the construction stage. The government is likely to suffer difficulties in relationship management in the late construction stage. Local industry groups would face challenges in relationship management in the middle of the construction stage and handover stage.

Originality/value

The research provides a useful approach to measuring weak moments of relationship management for each stakeholder in various project phases, considering the dynamic and complex environments of megaprojects. The proposed model extends the current knowledge body on how to make project stakeholder analysis by modelling dynamic and complex environments of megaprojects, with bridging the knowledge domains of evolution modeling techniques and network methods.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 April 2020

Ibrahim Yahaya Wuni and Geoffrey Qiping Shen

For many types of buildings, prefabricated prefinished volumetric construction (PPVC) is increasingly becoming a preferred alternative construction approach. Empirical evidence of…

2969

Abstract

Purpose

For many types of buildings, prefabricated prefinished volumetric construction (PPVC) is increasingly becoming a preferred alternative construction approach. Empirical evidence of project performance has consistently demonstrated that the ultimate success of PPVC projects is directly linked to the key decisions made at the outset of the PPVC project life cycle. However, there is limited knowledge of how to successfully manage these early stages. This research identified and evaluated the critical success factors (CSFs) required for the management of the conception, planning and design stages of the PPVC project life cycle.

Design/methodology/approach

A multistage methodological framework was adopted to identify and evaluate the CSFs for management of the early stages of the PPVC project life cycle. Based on a comprehensive literature review and expert review, a list of the 9 CSFs relevant to the early stages of the PPVC project life cycle was established. Drawing on an online-based international questionnaire survey with global PPVC experts, the CSFs were measured. The data set was statistically tested for reliability and analyzed using several techniques such as mean scores, relativity weightings and significance analysis.

Findings

The analysis revealed that the top 5 most influential CSFs for management of the early stages of the PPVC project life cycle include robust design specifications, accurate drawings and early design freeze; good working collaboration, effective communication and information sharing among project participants; effective stakeholder management; extensive project planning and scheduling; and early engagement of key players. The research further found correlations among the CSFs and proposed a conceptual framework for the management of the early stages of the PPVC project life cycle.

Research limitations/implications

The research recognizes that data quality and reliability risks are the major drawbacks of online questionnaire surveys but the engagement of experts with substantial theoretical and hands-on experiences in PPVC projects helped to minimize these risks. Although small, the sample size was justified and compared with studies that adopted the same data collection approach but analyzed even smaller samples. However, the results should be interpreted against these limitations.

Practical implications

The findings suggest that effective management of the early stages of the PPVC project lifecycle requires early commitment to the PPVC approach in a project; detailed planning and assessment of the suitability of PPVC for the given project; and collaborative design with manufacturers and suppliers to address module production challenges at the detailed design stage. These findings practically instructive and may serve as management support during PPVC implementation.

Originality/value

This research constitutes the first exclusive attempt at identifying the CSFs for successful management of the early stages of the PPVC project life cycle. It provides a fresh and more in-depth understanding of how best to manage the early stages of the PPVC project life cycle. Thus, it contributes to the practice and praxis of the PPVC project implementation discourse.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The…

Abstract

The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The analysis from the literature revealed that the implementation of SCM in the construction industry enhances the industry's value in terms of cost-saving, time savings, material management, risk management and others. The construction supply chain (CSC) can be managed using the pull or push system. This chapter also discusses the origin and proliferation of SCM into the construction industry. The chapter revealed that the concept of SCM has passed through five different eras: the creation era, the use of ERP, globalisation stage, specialisation stage and electronic stage. The findings from the literature revealed that we are presently in the fourth industrial revolution (4IR) era. At this stage, the SCM witnesses the adoption of technologies and principles driven by the 4IR. This chapter also revealed that the practice of SCM in the construction industry is centred around integration, collaboration, communication and the structure of the supply chain (SC). The forms and challenges hindering the adoption of these practices were also discussed extensively in this chapter.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Article
Publication date: 12 October 2018

Ann Tit Wan Yu, Arshad Ali Javed, Tsun Ip Lam, Geoffrey Qiping Shen and Ming Sun

Integrating sustainability into the value management (VM) process can provide a strategic platform for promoting and incorporating sustainable design and development during the…

1887

Abstract

Purpose

Integrating sustainability into the value management (VM) process can provide a strategic platform for promoting and incorporating sustainable design and development during the lifespans of construction projects. The purpose of this paper is to investigate the strengths, weaknesses, opportunities and threats (SWOT) for integrating sustainability into the VM process in Hong Kong.

Design/methodology/approach

Following an extensive literature review, 45 attributes were identified and grouped into strength, weakness, opportunity and threat elements. A questionnaire survey based on these groupings was supported by semi-structured interviews with public sector clients, value managers and VM facilitators. They shared their experience and views on how to integrate sustainability into the VM exercises.

Findings

The triangulated results of the survey and interviews are presented in this paper. The ranking of the SWOT analysis results indicate that VM does provide opportunities for multidisciplinary professionals and stakeholders to focus on issues relating to society and the environment, which is considered a main strength. The major weakness of integration is the lack of well-trained staff and low levels of VM participant expertise in relation to the sustainable construction issue.

Research limitations/implications

Current practices generally neglect integration of sustainability into the VM process due to cost and time constraints. There are ample strengths and opportunities recommended by this study for integrating sustainability into the VM process which are beneficial for the clients and contractors for achieving value for money and meeting sustainability targets.

Practical implications

There are immense opportunities for integrating sustainability into the VM process, including encouragement of the reduction, reuse and recycling of construction and demolition waste. However, threats presented by integration include the additional time and costs required for achieving sustainability targets.

Originality/value

Findings and recommendations provided in this paper should be helpful to decision makers including clients and VM facilitators for the successful integration of the sustainability concept into the VM process.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 11
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 68