Article
Publication date: 1 April 2024

Frank Ato Ghansah

Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the…

Abstract

Purpose

Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the high complexity of accurately representing and modelling the physics behind the DTs process. This study thus organises and consolidates the fragmented literature on DTs implementation for smart buildings at the facility management stage by exploring the enablers, applications and challenges and examining the interrelationships amongst them.

Design/methodology/approach

A systematic literature review approach is adopted to analyse and synthesise the existing literature relating to the subject topic.

Findings

The study revealed six main categories of enablers of DTs for smart building at the facility management stage, namely perception technologies, network technologies, storage technologies, application technologies, knowledge-building and design processes. Three substantial categories of DTs application for smart buildings were revealed at the facility management stage: efficient operation and service monitoring, efficient building energy management and effective smart building maintenance. Subsequently, the top four major challenges were identified as being “lack of a systematic and comprehensive reference model”, “real-time data integration”, “the complexity and uncertainty nature of real-time data” and “real-time data visualisation”. An integrative framework is finally proposed by examining the interactive relationship amongst the enablers, the applications and the challenges.

Practical implications

The findings could guide facility managers/engineers to fairly understand the enablers, applications and challenges when DTs are being implemented to improve smart building performance and achieve user satisfaction at the facility management stage.

Originality/value

This study contributes to the knowledge body on DTs by extending the scope of the existing studies to identify the enablers and applications of DTs for smart buildings at the facility management stage and the specific challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 26 March 2024

Frank Ato Ghansah and Weisheng Lu

While COVID-19 mitigation measures (CMMs) aided in steady recovery during the pandemic, they also impeded movement across economies/borders, affecting quality assurance (QA) of…

Abstract

Purpose

While COVID-19 mitigation measures (CMMs) aided in steady recovery during the pandemic, they also impeded movement across economies/borders, affecting quality assurance (QA) of Cross-border Construction Logistics and Supply Chain (Cb-CLSC). However, prior studies on the pandemic in the construction project industry have not revealed how CMMs have impacted QA. Thus, this study aims to evaluate the impact of the CMMs on the QA of Cb-CLSC.

Design/methodology/approach

This is achieved by adopting an embedded mixed-method approach involving a desk literature review and engaging 150 experts from different economies across the globe using expert surveys, and results verified via semi-structured expert interviews. Structural equation modelling-based multiple regression analysis (SEM-MRA) was integrated to examine the impact of the CMMs on the QA, along with descriptive and content analysis.

Findings

The study confirmed that CMMs have not only impacted the QA negatively but also influenced the positioning of the QA for the post-pandemic era and probably to survive the risks of future pandemics. Among all the identified CMMs, the top three critical measures include “lockdown (CMM2)”, “use of personal protective equipment, such as nose masks, disinfects, etc. (CMM5)”, and “electronic/virtual meetings (CMM7)”. However, CMM5 possesses the highest contributory power to form CMM in impacting the QA, and this can be regarded as largely positive by strengthening health and safety management systems. Its negative impact lies with the project cost increment and the inconveniences of using nose and face masks.

Practical implications

This study provides a better understanding to construction practitioners and policy makers on how the pandemic policies, i.e. CMMs, have impacted QA and can aid in formulating planning and operational decisions to adequately position the QA for the post-pandemic era and to endure the risks of future pandemics.

Originality/value

The study contributes to knowledge in that it provides a better understanding of how the pandemic policies, such as CMMs, have impacted QA and can aid in formulating planning and operational decisions to adequately position the QA for the post-pandemic era and to endure the risks of future pandemics. This area of study has been given limited attention among prior studies during the pandemic.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 March 2024

Frank Ato Ghansah, Weisheng Lu and Benjamin Kwaku Ababio

The COVID-19 pandemic has impacted the construction industry, yet still, it is unclear from existing studies about the critical challenges imposed on quality assurance (QA)…

Abstract

Purpose

The COVID-19 pandemic has impacted the construction industry, yet still, it is unclear from existing studies about the critical challenges imposed on quality assurance (QA), particularly Cross-border Construction Logistics and Supply Chain (Cb-CLSC). Thus, this study aims to identify and examine the critical challenges of QA of Cb-CLSC during the COVID-19 pandemic.

Design/methodology/approach

The aim is achieved via an embedded mixed-method approach pragmatically involving a desk literature review and engaging 150 experts across the globe using expert surveys, and results confirmed by semi-structured interviews. The approach is based on Interpretive Structural Modelling (ISM) as its foundation.

Findings

The study revealed ten critical challenges of QA, with the top four including “the shortage of raw construction material (C7)”, “design changes (C6)”, “collaboration and communication difficulties (C1)” and “changes in work practices (C10)”. However, examining the interrelationships among the critical challenges using ISM confirmed C7 and C10 as the most critical challenges. The study again revealed that the critical challenges are sensitive and capable of affecting themselves due to the nature of their interrelationship based on MICMAC analysis. Hence, being consistent with why all the challenges were considered critical amid the pandemic. Sentiment analysis revealed that the critical challenges have not been entirely negative but also positive by creating three areas of opportunities for improvement: technology adoption, worker management, and work process management. However, four areas of challenges in the QA include cost, raw material, time, and work process, including inspection, testing, auditing, communication, etc.

Practical implications

The finding provides a convenient point of reference to researchers, policymakers, practitioners, and decision-makers on formulating policies to enhance the effectiveness of construction QA during the pandemic through to the post-pandemic era.

Originality/value

The study enriches the extant literature on QA, Cb-CLSC, and the COVID-19 pandemic in the construction industry by identifying the critical challenges and examining the interrelationships among them. This provides a better understanding of how the construction QA has been affected by the pandemic and the opportunities created.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 January 2024

Frank Ato Ghansah and Weisheng Lu

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the…

Abstract

Purpose

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the post-pandemic era and future pandemics, especially cross-border construction logistics and supply chain (Cb-CLSC). Thus, this study aims to develop a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully.

Design/methodology/approach

This is achieved pragmatically through an embedded mixed-method design involving a literature review, survey and interview from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory. The design is further integrated with the partial least squares structural equation modelling (PLS-SEM) approach.

Findings

The study revealed 10 critical managerial practices (MPs) to position the QA to be adequate for the post-pandemic and during future pandemics, with the top three including “strict observance of government regulations (MP1)”, “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)” and “modification of contract to cater for uncertainties (MP4)”. This attained a relatively good percentage agreement of 53% between the industry and academia. However, the top four MPs regarded as very effective include “implementing digital collaborative inspections with subcontractors and trades (MP8)”, “implementing a digital centralized document and issue management system (MP7)”, “strict observance to government regulations, including vaccination of workers, social distancing, use of prescribed nose masks, etc. (MP1)” and “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)”. Two underlying components of the MPs were revealed as policy-process (PP)-related practices and people-technology-process (PTP)-related practices, and these can be modelled into a managerial framework capable of effectively positioning the QA to be adequate during pandemics through to the post-pandemic era.

Practical implications

The findings of this study depicted significant theoretical and practical contributions to the proactive management of QA activities during pandemics through to the post-pandemic era. It could empower organisations to pay attention to smartly and innovatively balancing people, processes, pandemic policy and technology to inform decisions to effectively position the QA for the post-pandemic era and survive the risks of future pandemics.

Originality/value

The study contributes to the body of knowledge in that it develops a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully. It is original research with invaluable primary data in the form of surveys and interviews from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 January 2023

Frank Ato Ghansah and Weisheng Lu

Digital twins provide enormous opportunities for smart buildings. However, an up-to-date intellectual landscape to understand and identify the major opportunities of digital twins…

Abstract

Purpose

Digital twins provide enormous opportunities for smart buildings. However, an up-to-date intellectual landscape to understand and identify the major opportunities of digital twins for smart buildings is still not enough. This study, therefore, performs an up-to-date comprehensive literature review to identify the major opportunities of digital twins for smart buildings.

Design/methodology/approach

Scientometric and content analysis are utilised to comprehensively evaluate the intellectual landscape of the general knowledge of digital twins for smart buildings.

Findings

The study uncovered 24 opportunities that were further categorised into four major opportunities: efficient building performance (smart “building” environment), efficient building process (smart construction site environment), information efficiency and effective user interactions. The study further identified the limitations of the existing studies and made recommendations for future research in the methodology adopted and the research domain. Five research domains were considered for future research, namely “real-time data acquisition, processing and storage”, “security and privacy issues”, “standardised and domain modelling”, “collaboration between the building industry and the digital twin developers” and “skilled workforce to enable a seamless transition from theory to practice”.

Practical implications

All stakeholders, including practitioners, policymakers and researchers in the field of “architecture, engineering, construction and operations” (AECO), may benefit from the findings of this study by gaining an in-depth understanding of the opportunities of digital twins and their implementation in smart buildings in the AECO industry. The limitations and the possible research directions may serve as guidelines for streamlining the practical adoption and implementation of digital twins for smart buildings.

Originality/value

This study adopted scientometric and content analysis to comprehensively assess the intellectual landscape of relevant literature and identify four major opportunities of digital twins for smart building, to which scholars have given limited attention. Finally, a research direction framework is presented to address the identified limitations of existing studies and help envision the ideal state of digital twins for smart buildings.

Details

Smart and Sustainable Built Environment, vol. 13 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 12 August 2022

Ewald Kuoribo, Roland Yomoah, De-Graft Owusu-Manu, Alex Acheampong, David John Edwards and Caleb Debrah

The construction industry is beset with unethical behaviours. Although several studies have investigated the effects of unethical behaviours on project performance, research in…

Abstract

Purpose

The construction industry is beset with unethical behaviours. Although several studies have investigated the effects of unethical behaviours on project performance, research in the Ghanaian construction industry (GCI) remains scant. Consequently, this research assesses the interactive effects of ethical and unethical behaviours of construction professionals on project performance in the GCI.

Design/methodology/approach

A quantitative research approach was used to obtain primary data from 68 construction professionals, viz, quantity surveyors, architects, civil engineers, clerk of works and project managers, via a closed-ended questionnaire survey. Data collected were analysed using one-sample t-test and Kruskal–Wallis test statistics, after which two hypotheses were tested and validated using regression analysis.

Findings

Reduction of project risks, avoidance of legal problems and maximisation project quality performance were critical effects of ethical behaviours observed on project performance, whereas the effects of unethical behaviours such as cost overrun, abandonment and time overrun were severe on project performance in the GCI. Ethical behaviour was seen to relate to project performance positively, and unethical behaviour was proved to have dire consequences on project performance.

Practical implications

Construction project performance is greatly influenced by professionals' ethical and unethical behaviours. Emergent findings emanating from this research will assist emerging economies in developing and implementing counter policies and systems that mitigate the unethical behaviours of construction professionals.

Social implications

The study highlights the effects of ethical and unethical behaviours on project performance to reorient individuals' perceptions that unethical behaviours are less critical in the construction industry. Supporting evidence encourages individuals to adhere to ethical behaviours in a project environment.

Research limitations/implications

The inability to obtain data across the entire geographical spread of Ghana is acknowledged as a major limitation of the study and affects the generalisation of the results.

Originality/value

This study constitutes a first attempt to establish the interactive effects of ethical and unethical behaviours of construction professionals on project performance within the GCI. A significant addition to the body of knowledge is that ethical and unethical behaviours impact project performance positively or negatively, respectively.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords