Search results
1 – 10 of over 1000Genell Wells Ebbini and Adel Al-Assaf
The researchers analyzed factors affecting the adoption of the Leadership in Energy and Environmental Design (LEED) green-building certification system in Jordan, including…
Abstract
Purpose
The researchers analyzed factors affecting the adoption of the Leadership in Energy and Environmental Design (LEED) green-building certification system in Jordan, including financial performance of certified projects along with broader barriers that may impact developers’ interest in LEED.
Design/methodology/approach
The authors first reviewed online data for all LEED registered and certified projects in Jordan, recruited LEED-certified project stakeholders, collected documents related to LEED projects and conducted LEED category credit summaries, financial cost-benefit analyses and spot-checking reported values in local markets. The authors then visited projects sites and interviewed various project stakeholders to understand better stakeholders' decision-making processes concerning LEED and relevant factors (financial, branding, cultural, political, etc.).
Findings
Obtaining LEED certification in Jordan was financially feasible as evinced in both the quantitative analysis and interviews. However, the authors found that there was very limited interest in LEED among Jordanian developers. Barriers included widespread cynicism toward green building concepts as well as a lack of local expertise in installing and maintaining green technologies. To overcome these barriers, the authors recommend that green building initiatives place a greater emphasis on education and public-promotion activities.
Research limitations/implications
The research data were limited to projects that had successfully achieved LEED certification. Broader qualitative research conducted across the Jordanian building community could provide additional insights, but such an investigation is beyond the scope of the current study.
Originality/value
The complexity of adapting a Western green building standard (LEED) to a non-Western context is discussed in detail. The findings suggest that understanding regional development challenges, local markets and cultural differences is vital for successfully implementing green building certification systems.
Details
Keywords
Lorea Narvaiza, José Antonio Campos, María Luz Martín-Peña and Eloísa Díaz-Garrido
Digital service innovation (DSI) is a type of technological innovation that is recognized in practice in the innovation structure of companies. Given the breadth of digital…
Abstract
Purpose
Digital service innovation (DSI) is a type of technological innovation that is recognized in practice in the innovation structure of companies. Given the breadth of digital technologies that enable digital services and the variety of these services, analysis is needed to discern the nature of these services, as well as the process that culminates in co-innovation. The literature on DSI is fragmented and spread across multiple research areas. This fragmentation impedes conceptualization of the elements that constitute DSI. This paper describes the nature of DSI through the process and elements of initiation, adoption and routinization of DSI in the context of digital service platforms (DSPs).
Design/methodology/approach
This paper presents a single exploratory case study of a provider of a leading digital solution in customer relations. The data analysis is based on abductive reasoning.
Findings
The paper conceptualizes the nature of DSI and describes the process and elements of DSI (phases, actors, functions and interactions). It contributes to building a common language for DSI research in service management. The analysis shows that DSI in DSPs is synonymous with co-innovation. This paper offers insight into how co-innovation occurs, using hybrid agile methodologies with the coordination of multiple actors and multilateral interactions.
Originality/value
The originality and value of the study reside in its conceptualization and analysis of what is meant by DSI. The components of the service and the technological requirements for not only provision but also ideation and development appear to be inseparable. The study unveils the mechanisms that turn a digital service solution into a co-innovative proposal. This knowledge can facilitate scalability in digital services.
Details
Keywords
Changjoon Lee and Byoung-Chun Ha
This study examines the relationship between trust, the investment model and logistics performance and the importance of commitment between companies in the supply chain…
Abstract
Purpose
This study examines the relationship between trust, the investment model and logistics performance and the importance of commitment between companies in the supply chain. Furthermore, it analyzes satisfaction, quality of alternatives, investment size and commitment level, which are the constituent factors of the investment model, and reviews trust and logistics performance to ascertain their causal relationship.
Design/methodology/approach
The authors examined employees working in supply chain-related departments in Korean companies and further conducted an online survey for a month in January 2022 through the survey agency Entrust Survey, through which the authors distributed a total of 4,082 questionnaires and collected and used a total of 300 questionnaires for statistical analysis. The authors then validated the hypotheses using SPSS 18.0 and AMOS 18.0 using the structural equation modeling method.
Findings
The results showed that trust significantly and positively affects satisfaction levels in the relationship between companies in the supply chain. Trust can lower uncertainty in the transaction process between companies.
Originality/value
In this study, the investment model, which has been predominantly observed in the field of family psychology, was applied to business studies. In addition, the investment model was extended to enable its application to supply chain management research, thereby offering a distinctive research model from preceding studies.
Details
Keywords
Olga Iermolenko and Anders Hersinger
This study aims to investigate how and why a new management accounting control (MAC) regime emerged in a previously government-owned energy company with a Soviet past in the…
Abstract
Purpose
This study aims to investigate how and why a new management accounting control (MAC) regime emerged in a previously government-owned energy company with a Soviet past in the context of changing politico-economic dynamics in Ukraine.
Design/methodology/approach
Drawing upon data from a case study of a large Ukrainian energy company with a Soviet past that has undergone major transformations in recent years, the authors analyze MAC regime changes in the company from an institutional logics perspective. All primary and secondary data used in this study were collected from 2012 to 2016. Retrospective interviews and extensive use of written materials, including corporate documents and other publicly available data, helped them reconstruct those events, which the authors could not observe personally.
Findings
The authors observed that MAC regime changes in the company mirror; overall changes in the political and economic environment and Ukraine’s willingness to become closer to the West. The company seems to follow liberal Western market logics and eliminate those of Soviet heritage. The MAC regime changes seemed to contribute to the company’s survival during challenges caused by the political and economic crises that began in 2014 with the annexation of Crimea and other Ukrainian territories in the East of the country, demonstrating the usefulness of the new MAC regime and overall business logic.
Research limitations/implications
This study adds to the literature on management accounting and control change in emerging economies and extractive industries by highlighting the role of changing institutional logics in shaping a MAC regime. The authors explain why, in some contexts (i.e. Ukraine), organizational actors accept and favor liberal Western market logic.
Originality/value
A particularly significant facet of this study concerns its extension of the role of MAC and the way it is perceived in a new international context in times of significant transformation. The results suggest that MAC regime change may be favorably received if it is based on local values and aspirations.
Details
Keywords
Mojtaba Kaffashan Kakhki, Joel R. Malin, Farahnaz Naderbeigi, Iman Maleksadati and Hassan Behzadi
The purpose of the present study was to identify the conditions that affect the absorptive capacity (AC) of knowledge, discover its consequences and design an AC paradigm pattern…
Abstract
Purpose
The purpose of the present study was to identify the conditions that affect the absorptive capacity (AC) of knowledge, discover its consequences and design an AC paradigm pattern in public academic libraries. To do so, AC was investigated at the levels of individual and organizational learning.
Design/methodology/approach
In this paper, to answer the three major questions of this qualitative-survey study, the views of 24 experts were examined using an in-depth semi-structured interview and grounded theory strategy. The data were collected using a nonrandom combined targeted sampling procedure (targeted and snowball) and analyzed based on Strauss and Corbin’s (1998) approach and utilizing MAX Qualitative Data Analysis (MAXQDA) software.
Findings
Throughout the grounded analytic stages, 121 open codes were identified. These were distributed around the AC axial category in academic libraries in terms of individual and organizational learning. The 33 axial concepts were then categorized into 16 selective general categories. The paradigm pattern was initially designed to explore the relationships between causal, intervening, strategies, context and consequences conditions. The transition from academic libraries to learning organizations, their increased functional value and the development of their innovation were identified as the consequences of AC development.
Originality/value
This qualitative research is the first in the field of Library and Information Science (LIS) to support AC both theoretically and empirically in terms of learning in academic libraries. This study thus not only addresses a key research gap in LIS but also provides significant insights and direction to interested librarians and researchers.
Details
Keywords
Antti Ylä-Kujala, Damian Kedziora, Lasse Metso, Timo Kärri, Ari Happonen and Wojciech Piotrowicz
Robotic process automation (RPA) has recently emerged as a technology focusing on the automation of repetitive, frequent, voluminous and rule-based tasks. Despite a few practical…
Abstract
Purpose
Robotic process automation (RPA) has recently emerged as a technology focusing on the automation of repetitive, frequent, voluminous and rule-based tasks. Despite a few practical examples that document successful RPA deployments in organizations, evidence of its economic benefits has been mostly anecdotal. The purpose of this paper is to present a step-by-step method to RPA investment appraisal and a business case demonstrating how the steps can be applied to practice.
Design/methodology/approach
The methodology relies on design science research (DSR). The step-by-step method is a design artefact that builds on the mapping of processes and modelling of the associated costs. Due to the longitudinal nature of capital investments, modelling uses discounted cashflow and present value methods. Empirical grounding characteristic to DSR is achieved by field testing the artefact.
Findings
The step-by-step method is comprised of a preparatory step, three modelling steps and a concluding step. The modelling consists of compounding the interest rate, discounting the investment costs and establishing measures for comparison. These steps were applied to seven business processes to be automated by the case company, Estate Blend. The decision to deploy RPA was found to be trivial, not only based on the initial case data, but also based on multiple sensitivity analyses that showed how resistant RPA investments are to changing circumstances.
Practical implications
By following the provided step-by-step method, executives and managers can quantify the costs and benefits of RPA. The developed method enables any organization to directly compare investment alternatives against each other and against the probable status quo where many tasks in organizations are still carried out manually with little to no automation.
Originality/value
The paper addresses a growing new domain in the field of business process management by capitalizing on DSR and modelling-based approaches to RPA investment appraisal.
Details
Keywords
Rebecca Martland, Lucia Valmaggia, Vigneshwar Paleri, Natalie Steer and Simon Riches
Clinical staff working in mental health services experience high levels of work-related stress, burnout and poor well-being. Increased levels of stress, burnout, depression and…
Abstract
Purpose
Clinical staff working in mental health services experience high levels of work-related stress, burnout and poor well-being. Increased levels of stress, burnout, depression and anxiety and poorer mental well-being among health-care workers are associated with more sick days, absenteeism, lower work satisfaction, increased staff turnover and reduced quality of patient care. Virtual reality (VR) relaxation is a technique whereby experiences of pleasant and calming environments are accessed through a head-mounted display to promote relaxation. The purpose of this paper is to describe the design of a study that assesses the feasibility and acceptability of implementing a multi-session VR relaxation intervention amongst mental health professionals, to improve their relaxation levels and mental well-being.
Design/methodology/approach
The study follows a pre–post-test design. Mental health staff will be recruited for five weeks of VR relaxation. The authors will measure the feasibility and acceptability of the VR relaxation intervention as primary outcomes, alongside secondary outcomes evaluating the benefits of VR relaxation for mental well-being.
Findings
The study aims to recruit 20–25 health-care professionals working in both inpatient and specialist community mental health settings.
Originality/value
Research indicates the potential of VR relaxation as a low-intensity intervention to promote relaxation and reduce stress in the workplace. If VR relaxation is shown to be feasible and acceptable, when delivered across multiple sessions, there would be scope for large-scale work to investigate its effectiveness as an approach to enable health-care professionals to de-stress, relax and optimise their mental well-being. In turn, this may consequently reduce turnover and improve stress-related sick leave across health-care services.
Details
Keywords
Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan
In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…
Abstract
Purpose
In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.
Design/methodology/approach
A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.
Findings
The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.
Research limitations/implications
The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.
Practical implications
This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.
Originality/value
The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.
Details
Keywords
Hong Zhou, Binwei Gao, Shilong Tang, Bing Li and Shuyu Wang
The number of construction dispute cases has maintained a high growth trend in recent years. The effective exploration and management of construction contract risk can directly…
Abstract
Purpose
The number of construction dispute cases has maintained a high growth trend in recent years. The effective exploration and management of construction contract risk can directly promote the overall performance of the project life cycle. The miss of clauses may result in a failure to match with standard contracts. If the contract, modified by the owner, omits key clauses, potential disputes may lead to contractors paying substantial compensation. Therefore, the identification of construction project contract missing clauses has heavily relied on the manual review technique, which is inefficient and highly restricted by personnel experience. The existing intelligent means only work for the contract query and storage. It is urgent to raise the level of intelligence for contract clause management. Therefore, this paper aims to propose an intelligent method to detect construction project contract missing clauses based on Natural Language Processing (NLP) and deep learning technology.
Design/methodology/approach
A complete classification scheme of contract clauses is designed based on NLP. First, construction contract texts are pre-processed and converted from unstructured natural language into structured digital vector form. Following the initial categorization, a multi-label classification of long text construction contract clauses is designed to preliminary identify whether the clause labels are missing. After the multi-label clause missing detection, the authors implement a clause similarity algorithm by creatively integrating the image detection thought, MatchPyramid model, with BERT to identify missing substantial content in the contract clauses.
Findings
1,322 construction project contracts were tested. Results showed that the accuracy of multi-label classification could reach 93%, the accuracy of similarity matching can reach 83%, and the recall rate and F1 mean of both can reach more than 0.7. The experimental results verify the feasibility of intelligently detecting contract risk through the NLP-based method to some extent.
Originality/value
NLP is adept at recognizing textual content and has shown promising results in some contract processing applications. However, the mostly used approaches of its utilization for risk detection in construction contract clauses predominantly are rule-based, which encounter challenges when handling intricate and lengthy engineering contracts. This paper introduces an NLP technique based on deep learning which reduces manual intervention and can autonomously identify and tag types of contractual deficiencies, aligning with the evolving complexities anticipated in future construction contracts. Moreover, this method achieves the recognition of extended contract clause texts. Ultimately, this approach boasts versatility; users simply need to adjust parameters such as segmentation based on language categories to detect omissions in contract clauses of diverse languages.
Details
Keywords
Clair Reynolds Kueny, Alex Price and Casey Canfield
Barriers to adequate healthcare in rural areas remain a grand challenge for local healthcare systems. In addition to patients' travel burdens, lack of health insurance, and lower…
Abstract
Barriers to adequate healthcare in rural areas remain a grand challenge for local healthcare systems. In addition to patients' travel burdens, lack of health insurance, and lower health literacy, rural healthcare systems also experience significant resource shortages, as well as issues with recruitment and retention of healthcare providers, particularly specialists. These factors combined result in complex change management-focused challenges for rural healthcare systems. Change management initiatives are often resource intensive, and in rural health organizations already strapped for resources, it may be particularly risky to embark on change initiatives. One way to address these change management concerns is by leveraging socio-technical simulation models to estimate techno-economic feasibility (e.g., is it technologically feasible, and is it economical?) as well as socio-utility feasibility (e.g., how will the changes be utilized?). We present a framework for how healthcare systems can integrate modeling and simulation techniques from systems engineering into a change management process. Modeling and simulation are particularly useful for investigating the amount of uncertainty about potential outcomes, guiding decision-making that considers different scenarios, and validating theories to determine if they accurately reflect real-life processes. The results of these simulations can be integrated into critical change management recommendations related to developing readiness for change and addressing resistance to change. As part of our integration, we present a case study showcasing how simulation modeling has been used to determine feasibility and potential resistance to change considerations for implementing a mobile radiation oncology unit. Recommendations and implications are discussed.
Details