Search results

1 – 10 of over 6000
Open Access
Article
Publication date: 2 August 2022

Sina Moradi and Kalle Kähkönen

The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have…

1975

Abstract

Purpose

The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have addressed success factors of various collaborative delivery models (e.g. alliance and partnering). However, there is currently very limited research-based knowledge concerning core success factors for different collaborative delivery models, exploring the commonalities. Thus, this study aims to conceptualize a success model for collaborative construction projects by identifying and structuring their core success factors through the lens of project delivery elements.

Design/methodology/approach

A systematic literature review was conducted, and thematic as well as content analysis of the relevant studies led to the identification of mentioned success factors in the literature for different collaborative delivery models. Then, those common success factors were structured in a model based on factors' relation to project delivery elements.

Findings

The obtained results present eight core success factors (e.g. equality, mutual trust and commitment to win–win philosophy) for collaborative construction projects, structured in a model based on their contribution toward project organization, contractual relationships, and operational system in construction project delivery. Moreover, the differences between success factors for traditional and collaborative construction projects are discussed.

Originality/value

This study's findings provide insightful theoretical contributions on collaborative construction project success and providing a departure point for future studies based on the discussed differences between success factors of collaborative and traditional construction projects. The findings can be also practically insightful for the project professionals in collaborative construction projects to succeed in managing project organization, contractual relationships, and operational system.

Details

Built Environment Project and Asset Management, vol. 12 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 16 April 2018

Taryn Jane Bond-Barnard, Lizelle Fletcher and Herman Steyn

The purpose of this paper is to emphasise the importance of high levels of trust and collaboration for increasing the likelihood of project management (PM) success. However, the…

39077

Abstract

Purpose

The purpose of this paper is to emphasise the importance of high levels of trust and collaboration for increasing the likelihood of project management (PM) success. However, the link between these three constructs remains unclear.

Design/methodology/approach

In this study, the authors use structural equation modelling (SEM) based on the findings from an international survey of 151 project practitioners to demonstrate the significance of project team trust and collaboration for increasing the likelihood of PM success.

Findings

The results indicate that PM success becomes more likely as the degree of collaboration improves which, in turn, is influenced by an increase in the level of trust between team members. The two factors of PM success are project performance and knowledge integration and innovation. The six factors of the degree of collaboration that were studied are physical proximity, commitment, conflict, coordination, relationships and incentives. The three factors of the level of trust investigated are expectations, knowledge exchange and imported trust.

Practical implications

The results of the study are expected to provide insight for project practitioners to increase the likelihood of PM success by taking cognisance of the factors that influence collaboration and trust. The results of the study may also provide insight into teaching and learning in tertiary education, in terms of professionalism and integrity issues.

Originality/value

This paper presents a new perspective for investigating PM success. SEM techniques are used to determine the likelihood of PM success by promoting trust and collaboration in the project team. This unique approach highlights the “human factors” that influence perceived PM success which should benefit both researchers and practitioners.

Details

International Journal of Managing Projects in Business, vol. 11 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 26 October 2020

Muhammad Sabbir Rahman, Bashir Hussain, Mehdi Hussain, Hasliza Hassan and Raechel Johns

The aim of this research is to examine the key determinants influencing the success of new service development projects (NSDPs) across four service typologies context.

1494

Abstract

Purpose

The aim of this research is to examine the key determinants influencing the success of new service development projects (NSDPs) across four service typologies context.

Design/methodology/approach

The researchers used the scenario-based survey method in an NSDP setting. Structural equation modelling (SEM) was used to test the proposed hypotheses based on survey data from 570 managers under four service typologies.

Findings

Service firms' cross-functional integration (CFI) and internal project team efficiency (IPTE) positively influenced NSDPs. The results also indicated that both technology infrastructure (TI) and IPTE mediated the relationship between CFI and NSDPs. In addition, the mediation effect of TI existed between the relationship of IPTE and NSDPs. Furthermore, the proposed model confirms that, for NSDPs, the role of knowledge-sharing behaviour (KSB), authentic leadership (AL) and firm's culture (FC) across the four service typologies moderated the relationship.

Practical implications

With a better understanding of the dynamics of the aforementioned variables, service managers and the project team can more effectively develop and execute strategies for an NSDP. The article enables practitioners to expand their current understanding of NSDPs by providing insights of the unique antecedents that are significant for new service development across four service types.

Originality/value

This research is the first of its kind to examine the mediating role of KSB and TI in determining NSDPs. This study provides one of the first empirical examinations on NSDPs in the context of four service typologies from the perspective of a developing country, where the service industry is competitive. The study demonstrates that the critical success factors of NSDPs do not differ across service types, thereby confirming the “One Basket Fits all” assumption in the current NSDP research study.

Open Access
Article
Publication date: 8 September 2022

Innocent Musonda and Chioma Sylvia Okoro

Business process re-engineering (BPR) initiatives are complex endeavours which require many factors to ensure success. However, most studies focus on the organisational processes…

2978

Abstract

Purpose

Business process re-engineering (BPR) initiatives are complex endeavours which require many factors to ensure success. However, most studies focus on the organisational processes and improvement within the organisation itself and less on the project team and management dynamics. The study aimed to identify factors that enabled the completion of a BPR, in a technical firm, based on reflections on the project management style.

Design/methodology/approach

The study entailed a descriptive and interpretive case study with reflections from project team members. Data were analysed using descriptive statistics and content analysis.

Findings

Findings revealed that critical success factors for BPR in a technical firm include project leadership and sponsorship, organisational culture and attributes, team dynamics and the nature (activities), and duration of the process.

Practical implications

The findings will benefit project managers in improving their competence and project success through reflective practice. The identified factors could be used in future projects of a similar nature and size to improve how organisations execute BPR projects.

Originality/value

The study used reflections to identify success factors for BPR in a technical firm.

Open Access
Article
Publication date: 25 November 2022

Silvia Regina Veronezi Correia and Cristina Dai Prá Martens

The purpose of this article is to identify the critical success factors (CSFs) of information technology (IT) projects using cloud computing. CSFs are variables that can influence…

1959

Abstract

Purpose

The purpose of this article is to identify the critical success factors (CSFs) of information technology (IT) projects using cloud computing. CSFs are variables that can influence the success of projects and therefore need to be identified and managed appropriately.

Design/methodology/approach

This is an exploratory qualitative study with 23 experts in cloud computing projects through semi-structured interviews. The data was analyzed using content analysis.

Findings

The results present a list of CSFs for projects in a cloud computing environment. The study demonstrated that the CSF with greater relevance to cloud projects is the team’s technical capacity, followed by the support of senior management and the team’s soft skills. In addition, results demonstrated that contract item management is a limiting factor for cloud projects.

Research limitations/implications

The sample comprised only Brazilian experts, so it may not represent the same scenario as in other locations. The CSF ratio for cloud computing projects may vary depending on the company’s maturity in projects of this nature.

Practical implications

The CSF relationship can guide managers in properly conducting cloud computing projects, contributing to minimizing the risks and challenges that may interfere with the project.

Social implications

The relationship of the CSFs in cloud computing projects proposed fills a gap in studies specifically related to this context and tries to minimize project managers’ stress.

Originality/value

Contract items for the cloud context are added to the CSF literature in IT projects, which have not been addressed so far.

Details

RAUSP Management Journal, vol. 58 no. 1
Type: Research Article
ISSN: 2531-0488

Keywords

Open Access
Article
Publication date: 25 October 2021

Yaser Gamil and Ismail Abd Rahman

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in

13957

Abstract

Purpose

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in construction projects using Smart-PLS.

Design/methodology/approach

The first method of this research is to identify the causes and effects factors of poor communication in construction projects from the extant of literature. The data used to develop the model was collected using a questionnaire survey, which targeted construction practitioners in the Malaysian construction industry. A five-point Likert type scale was used to rate the significance of the factors. The factors were classified under their relevant construct/group using exploratory factor analysis. A hypothetical model was developed and then transformed into Smart-PLS in which the hypothetical model suggested that each group of the cause factors has a direct impact on the effect groups. The hypothesis was tested using t-values and p-values. The model was assessed for its inner and outer components and achieved the threshold criterion. Further, the model was verified by engaging 14 construction experts to verify its applicability in the construction project setting.

Findings

The study developed a structural equation model to clarify the relationships between causes and effects of poor communication in construction projects. The model explained the degree of relationships among causes and effects of poor communication in construction projects.

Originality/value

The published academic and non-academic literature introduced many studies on the issue of communication including the definitions, importance, barriers to effective communication and means of poor communication. However, these studies ended up only on the general issue of communication lacking an in-depth investigation of the causes and effects of poor communication in the construction industry. The study implemented advanced structural modeling to study the causes and effects. The questionnaire, the data and concluding results fill the identified research gap of this study. The addressed issue is also of interest because communication is considered one of the main knowledge areas in construction management.

Details

Journal of Facilities Management , vol. 21 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 13 May 2022

Saleh Alsulamy

The purpose of this research is to identify the constraints and restrictions and their impact on the construction projects in Saudi Arabia from three key participants'…

2835

Abstract

Purpose

The purpose of this research is to identify the constraints and restrictions and their impact on the construction projects in Saudi Arabia from three key participants' perspectives for the planning stage.

Design/methodology/approach

Using a descriptive-analytical approach, this research described and analyzed the frequency and severity of failure factors in construction projects in the planning stage using a five-Likert scale questionnaire in Saudi Arabia construction between 2019 and 2020. A total of 100 experts from contractors, consultants and owners were included in the study.

Findings

The findings have shown that time dispute was the major factor affecting the projects to be failed. Similarly, cost overrun and total abandonment have an impact on project failures. The findings have indicated that government officials were involved in delaying the projects while contractors also failed in the project deliveries.

Research limitations/implications

Further research is needed to investigate the relationship between failure characteristics and project success measures in the same stage, in addition to, factors of failure for construction projects' life-cycle stages.

Originality/value

The findings have indicated that government officials were involved in delaying the projects while contractors also failed in the project deliveries.

Details

Frontiers in Engineering and Built Environment, vol. 2 no. 3
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 29 May 2023

André Ullrich, Malte Reißig, Silke Niehoff and Grischa Beier

This paper provides a systematization of the existing body of literature on both employee participation goals and the intervention formats in the context of organizational change…

4655

Abstract

Purpose

This paper provides a systematization of the existing body of literature on both employee participation goals and the intervention formats in the context of organizational change. Furthermore, degrees of employee involvement that the intervention formats address are identified and related to the goals of employee participation. On this basis, determinants of employee involvement and participation in the context of digital transformation are unveiled.

Design/methodology/approach

Based on a systematic literature review the authors structure and relate employee participation goals and formats. Through a workshop with expert practitioners, the authors transfer and enhance these theoretical findings in the context of digital transformation. Experts rated the three most important goals and identified accompanying success factors, barriers and effects.

Findings

The results show that it is not necessarily the degree of involvement but a context-specific selection of measures, the quality of their implementation as well as the actual uptake of suggestions and activities developed by employees that contribute to employees accepting and participating in goal-directed transformations. Moreover, employees must have sufficient information and time for their participation in transformation processes.

Originality/value

This paper is based on a transformative approach, combining literature analysis to identify formats and goals of employee participation with experiential knowledge of digital transformation practitioners. In addition to relating intervention formats to goals pursued in organizational change processes, empirical and experiential perspectives are used to identify three very relevant goals and respective determinants in digital transformation processes.

Details

Journal of Organizational Change Management, vol. 36 no. 8
Type: Research Article
ISSN: 0953-4814

Keywords

Open Access
Article
Publication date: 9 July 2021

Emil Lucian Crisan and Alin Mihaila

The purpose of this paper is to provide practitioners and researchers a more condensed and structured perspective on the adoption of information management systems by the…

5055

Abstract

Purpose

The purpose of this paper is to provide practitioners and researchers a more condensed and structured perspective on the adoption of information management systems by the health-care industry, given the spread and the increased amount of research concerning the topic.

Design/methodology/approach

This paper is a literature review. A Technology (What?) – Context and before adoption Analysis (When and Why?) – Implementation (How?) – Outcomes (What for?) framework is used to present the trends concerning information technology adoption in an accessible manner.

Findings

The main finding is that small or large health-care organizations should no longer focus on information systems’ adoption but should adopt a digital transformation paradigm. By considering this paradigm, management practices related to information technologies’ adoption projects should be complemented by practices related to the continuous organizational changes and readaptation of the organizational strategy, to benefit the advantages information systems can offer.

Practical implications

The main recommendation for health-care industry managers is to adopt specific practices to manage the digital transformation process of their organizations, as they should understand that it is no longer about adopting information technologies, but about managing the associated organizational change.

Originality/value

Instead of focusing on specific information systems’ adoption as other papers do, this paper provides a holistic understanding of the information technologies and management practices which are used in the field.

Content available
Article
Publication date: 20 June 2008

Derek H.T. Walker

433

Abstract

Details

International Journal of Managing Projects in Business, vol. 1 no. 3
Type: Research Article
ISSN: 1753-8378

1 – 10 of over 6000