Information management workflow in building information modelling (BIM)-based collaboration is based on using a common data environment (CDE). The basic premise of a CDE is…

Abstract

Purpose

Information management workflow in building information modelling (BIM)-based collaboration is based on using a common data environment (CDE). The basic premise of a CDE is exposing all relevant data as a single source of truth and facilitating continuous collaboration between stakeholders. A multitude of tools can be used as a CDE, however, it is not clear how the tools are used or if they fulfil the users’ needs. Therefore, this paper aims to investigate current practices of using CDEs for information management during the whole built asset’s life cycle, through a state-of-the-art literature review and an empirical study.

Design/methodology/approach

Literature data is collected according to the PRISMA 2020 guideline for reporting systematic reviews. This paper includes 46 documents in the review and conduct a bibliometric and thematic analysis to identify the main challenges of digital information management. To understand the current practice and the views of the stakeholders using CDEs in their work, this paper used an empirical approach including semi-structured interviews with 15 BIM experts.

Findings

The results indicate that one of the major challenges of CDE adoption is project complexity and using multiple CDEs simultaneously leading to data accountability, transparency and reliability issues. To tackle those challenges, the use of novel technologies in CDE development such as blockchain could be further investigated.

Originality/value

The research explores the major challenges in the practical implementation of CDEs for information management. To the best of the authors’ knowledge, this is the first study on this topic combining a systematic literature review and fieldwork.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 May 2022

Koos Johannes, Hans Voordijk, Ingrid Wakkee and Guillermo Aranda-Mena

While digitalisation requires facilities management (FM) organisations to change at an increasing rate, little is known about the mechanisms that create ownership and enable…

Abstract

Purpose

While digitalisation requires facilities management (FM) organisations to change at an increasing rate, little is known about the mechanisms that create ownership and enable individuals to implement changes in everyday FM practice. In this study, these mechanisms are explored from a stewardship perspective. The purpose of this paper is to provide insights into the dynamics of organisational change in FM by analysing how stewardship behaviour leads to change.

Design/methodology/approach

A process model for implementing organisational change is constructed, based on existing theoretical insights from stewardship and intrapreneurship literature. The model is evaluated in a case study through analysis of critical events. Interviewing was the key data collection method.

Findings

The process model gives an event-driven explanation of change through psychological ownership. Analysis of multiple critical events suggests that the model explains intra-organisational as well as inter-organisational change. The case data further suggests that, compared with intra-organisational change, tailored relational and motivational support is more important for inter-organisational change because of the higher risks involved. Job crafting emerged as an unanticipated finding that offers interesting prospects for future FM research.

Practical implications

The process model offers guidance for leaders in FM organisations on providing tailored support to internal and external employees during periods of organisational change.

Originality/value

Stewardship and intrapreneurship are combined to provide insights on organisational change in FM. The study demonstrates how intrapreneurial behaviour and stewardship behaviour can be linked to create innovation within and between organisations.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 29 September 2023

Beatriz Campos Fialho, Ricardo Codinhoto and Márcio Minto Fabricio

Facilities management (FM) plays a key role in the performance of businesses to ensure the comfort of users and the sustainable use of natural resources over operation and…

Abstract

Purpose

Facilities management (FM) plays a key role in the performance of businesses to ensure the comfort of users and the sustainable use of natural resources over operation and maintenance. Nevertheless, reactive maintenance (RM) services are characterised by delays, waste and difficulties in prioritising services and identifying the root causes of failures; this is mostly caused by inefficient asset information and communication management. While linking building information modelling and the Internet of Things through a digital twin has demonstrated potential for improving FM practices, there is a lack of evidence regarding the process requirements involved in their implementation. This paper aims to address this challenge, as it is the first to statistically characterise RM services and processes to identify the most critical RM problems and scenarios for digital twin implementation. The statistical data analytics approach also constitutes a novel practical approach for a holistic analysis of RM occurrences.

Design/methodology/approach

The research strategy was based on multiple case studies, which adopted university campuses as objects for investigation. A detailed literature review of work to date and documental analysis assisted in generating data on the FM sector and RM services, where qualitative and statistical analyses were applied to approximately 300,000 individual work requests.

Findings

The work provides substantial evidence of a series of patterns across both cases that were not evidenced prior to this study: a concentration of requests within main campuses; a balanced distribution of requests per building, mechanical and electrical service categories; a predominance of low priority level services; a low rate of compliance in attending priority services; a cumulative impact on the overall picture of five problem subcategories (i.e. Building-Door, Mechanical-Plumbing, Electrical-Lighting, Mechanical-Heat/Cool/Ventilation and Electrical-Power); a predominance of problems in student accommodation facilities, circulations and offices; and a concentration of requests related to unlisted buildings. These new patterns form the basis for business cases where maintenance services and FM sectors can benefit from digital twins. It also provides a new methodological approach for assessing the impact of RM on businesses.

Practical implications

The findings provide new insights for owners and FM staff in determining the criticality of RM services, justifying investments and planning the digital transformation of services for a smarter provision.

Originality/value

This study represents a unique approach to FM and provides detailed evidence to identify novel RM patterns of critical service provision and activities within organisations for efficient digitalised data management over a building’s lifecycle.

Details

Facilities, vol. 42 no. 3/4
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 5 February 2024

Azzam Raslan, Ali Cheshmehzangi, Dave Towey, Walid Tizani and Georgios Kapogiannis

Currently, owners find it difficult to manage their assets throughout their project life cycle. The fact that asset information models (AIMs) are mandatory as deliverables for…

Abstract

Purpose

Currently, owners find it difficult to manage their assets throughout their project life cycle. The fact that asset information models (AIMs) are mandatory as deliverables for building information modeling-driven projects makes it a key requirement for the client to understand in detail those factors affecting asset operation. Hence, because the Kingdom of Saudi Arabia is the most significant market in the Middle East, this study aims to investigate those factors where blockchain and AIMs could impact the asset management (AM) life cycle.

Design/methodology/approach

Researchers used a hypothesis-based approach over a systematic literature review and a workshop (descriptive statistics) to understand the current challenges in AM. Later, a second workshop was run to understand the impact factor analysis affecting the operation of the asset life cycle by using asset information modeling and blockchain technology over a multiquantitative method.

Findings

Results found that factors affecting the operation of assets could be the improvement of trust and stakeholder’s influences; the availability of handover process products’ accurate data; manufacturers providing detailed product models; increasing the speed of preparing holistic and integrated AM systems; improving collaboration between stakeholders; and returning clients’ investments faster.

Originality/value

Understanding the factors affecting AM life cycle based on the utilization of AIMs and blockchain then allows investors and their team members to work in a secure and collaborative environment that helps them to pre-identify certain risks and improve decision-making in a more effective way, as is required by ISO55000.

Details

Construction Innovation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 7 March 2024

Mohammed Ali Abd Ali Alsemari and Manu Ramegowda

The oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements…

Abstract

Purpose

The oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements that oil and gas facilities required in such projects. Therefore, adopting an appropriate technological approach such as building information modeling (BIM) which is unfortunately not adopted yet in Iraq is essential to successfully deliver these projects. Thus, this paper aimed to introduce BIM to Iraq through Basra Oil Company (BOC) which is one of the biggest public oil and gas companies in Iraq.

Design/methodology/approach

The related literature of journals articles, conference proceedings and published reports have been reviewed. As a result, firstly: a hypothesis has been derived that is “If Basra Oil Company (BOC) adopts and applies BIM approach instead of the 2D approach currently used to manage its projects, the company can overcome several constraints in managing its projects that associated with such 2D traditional approach”; secondly: homogenous, consistence and reliable web-based questionnaire has been designed as its Cronbach’s alpha equal to 0.897 and 0.711 for BIM benefits and barriers, respectively. This questionnaire distributed to the BOC related professionals to test such hypothesis by investigating their readiness and accepting of BIM approach and to rank BIM barriers based on five-point Likert scale.

Findings

Based on the analysis using IBM SPSS Statistics 26 of 115 responses, almost 50% of the respondents had experience 11–15 years, while 22.6% had experience more than 15 years in oil and gas industry construction projects. Those participants were from diverse engineering majors that are: 4.3% Architectural Engineers, 31.3% Civil Engineers, 20% Mechanical Engineers, 22.6% Electrical Engineers and 21.7% from other engineering majors. The respondents’ departments demography was 16.5% of design department, 12.2% of construction department, 20.9% of Project Management Department, 12.2% of Maintenance department, 4.3% of HSE Department, 13% of Production Department and 20.9% of “Other Department.” The study resulted in 1: accepting BIM approach to be an alternative of current 2D-traditional approach used by the company to manage and construct its projects, since mean of collected data is (4.4332), Kruskal–Wallis H test significance values were 0.398 and 0.372; and ANOVA test significance values were 0.433 and 0.599 among Engineering Majors groups and Company’s Department groups, respectively. 2: Disclosed and sequenced BIM barriers in the company based on their criticality. 3: verifying reliably how BIM attributes are important to oil and gas construction projects in Iraq, 4: the company top management and company policies are the most critical potential factors to hinder or adopt and implement BIM in the company, 5: while cost is not seen a critical barrier to implement BIM in the oil and gas sector.

Research limitations/implications

The limitation of this study is the excluding of decision makers of BOC, thus more profound future studies need to be conducted where top management and decision makers are involved, particularly the present study demonstrated that support of company top management is the most critical factor which can help the company to adopt (BIM).

Originality/value

The study concludes that BIM approach is valuable for managing projects in oil and gas sector in Iraq and identify the originality in output by using the research method. This noble study provides a leverage for enhanced research to adopt and implement building information modeling (BIM) in Iraq as the study originally demonstrates benefits and identifies the critical barriers in BIM implementation to push the boundaries toward adopt Digitalization and reduce CO2 emission in Iraqi oil and gas sector. The study can be used as evidence and platform to encourage professionals and practitioners to present more sophisticated tools of BIM in the oil and gas industry, especially for facility and operation management. These findings achieved via oil and gas experts, and it is first time to achieve such findings from a case study in Iraqi oil and gas sector.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 25 March 2024

Lama Abu Alieh, M. Reza Hosseini, Igor Martek, Wei Wu and Mehrdad Arashpour

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction…

Abstract

Purpose

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction industry. In response, Australian universities have tried to integrate the teaching of BIM into construction-related curricula, but with limited success. The acknowledged impediment is the lingering mismatch between what universities offer and what industry actually needs. However, the exact nature of that mismatch has yet to be identified. This study addresses that knowledge gap. It assesses both the current status of BIM competencies among university graduates and explores how BIM education at Australian universities may be improved to deliver BIM work readiness, as required by the industry.

Design/methodology/approach

This paper employed a qualitative research approach, utilizing 17 semi-structured interviews with experts in the Australian BIM industry. The Person-Organization (PO) fit theory, which emphasizes the congruence between individual and organizational characteristics, was utilized as a theoretical framework to examine the compatibility between “demand” and “ability” perspectives. The resulting data were analysed using this theoretical framework to gain insights into the PO fit perspectives in relation to BIM industry practices.

Findings

Findings reveal that graduates are generally competent regarding the use of BIM software. However, employers require much more than software skills, and expect recruits to have the capability to implement BIM as a process according to information management standards. Specifically, graduates are significantly deficient in matters of BIM protocols, collaboration and coordination, information workflows as well as completion and handover procedures.

Originality/value

This study is the first of its kind that bridges the gap between industry expectations and university education, in the Australian context, moving beyond the common discourse in education literature, which is exclusively focused on assessing students’ perceptions about BIM.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 February 2024

Abdulkabir Opeyemi Bello and Calistus Ayegba

Despite successfully adopting building information modelling (BIM) for design and construction, its adoption in post-construction is critically lagging. This study aims to…

Abstract

Purpose

Despite successfully adopting building information modelling (BIM) for design and construction, its adoption in post-construction is critically lagging. This study aims to investigate the adoption of BIM for post-construction in Nigeria. Specifically, it aims to investigate the barriers hindering BIM adoption, propose strategies to facilitate its integration into the post-construction phase and examine the relationship between the barriers and strategies towards adopting BIM for post-construction.

Design/methodology/approach

This study employs a quantitative approach to gather numerical data on BIM perceived barriers among International Facility Management Association (IFMA) members. The study also develops strategies from an extensive literature review and combines them with insights from preliminary investigation. The data were analysed using descriptive and inferential statistics.

Findings

The top perceived barriers among the professionals are lack of BIM awareness, software availability issues and difficulties using new technologies. Institute training/workshops on BIM software for the professionals in the organisation, including BIM software courses in various related professional exams, and encouraging adoption of BIM from the grassroots, such as higher institutions, emerge as the top strategies. The findings further show a significant relationship between the barriers and strategies, emphasising the recognition that understanding barriers prompts the active development and implementation of strategies.

Originality/value

This study holds originality in its examination of the relationship between the barriers and strategies associated with BIM adoption in Nigerian Architecture, Construction, Engineering and Operation.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 26 January 2024

Mohamed Marzouk and Dina Hamdala

The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real…

93

Abstract

Purpose

The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real estate industry is characterized by high costs, high profit and high risks. The schedules of real estate projects are also characterized by having large number of repetitive activities that are executed over a long duration. The repetitiveness, long duration of execution, the high amounts of money involved and the high risk made it desirable to leverage the impact of changes in phasing plans on net present value of amounts incurred and received over the long execution and selling duration. This also changes the project progress, and delivery time as well as their respective impact on customer degree of satisfaction. This research addresses the problem of selecting the best phasing alternative for real estate development projects while maximizing customer satisfaction and project profit.

Design/methodology/approach

The research proposes a model that generates all construction phasing alternatives and performs decision-making to rank all possible phasing alternatives. The proposed model consists of five modules: (1) Phasing Sequencing module, (2) Customer Satisfaction module, (3) Cash-In calculation module, (4) Cost Estimation module and (5) Decision-making module. A case study was presented to demonstrate the practicality of the model.

Findings

The proposed model satisfies the real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model generates all construction phasing alternatives and performs multi-criteria decision making to rank all possible phasing alternatives. It quantifies the score of the two previously mentioned criteria and ranks all solutions according to their overall score.

Research limitations/implications

The research proposes a model that assist real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model can be used to conclude general guidelines and common successful practices to be used by real estate developers when deciding the construction phasing plan. In this study the model is based on business models where all the project units are sold, rental cases are not considered. Also, the budget limitations that might exist when phasing is not considered in the model computations.

Originality/value

The model can be used as a complete platform that can hold all real estate project data, process revenues and cost information for estimating profit, plotting cash flow profiles, quantifying the degree of customer satisfaction attributable to each phasing alternative and providing recommendation showing the best one. The model can be used to conclude general guidelines and common successful practices to be used by real estate developers when tackling the challenge of selecting construction phasing plans.