1 – 4 of 4This paper aims to gain insight in how the involvement of facilities management (FM) and clinical employees are practiced in new Norwegian hospital projects and to study the…
Abstract
Purpose
This paper aims to gain insight in how the involvement of facilities management (FM) and clinical employees are practiced in new Norwegian hospital projects and to study the benefits and lessons learned from the involvement.
Design/methodology/approach
This study is conducted by cross-sectional case studies of eight hospital projects by using a literature review, interviews and document studies of FM and clinical employees and project leaders (PLs) among Sykehusbygg.
Findings
The service design approach with a structured interaction between the PL’s of Sykehusbygg, and the different disciplines of clinical employees and FM specialist was rewarding and efficient. The facilitator role of Sykehusbygg is essential to manage such a broad and complex involvement process using a wide range of various techniques at the different stages of the projects (dialogue meetings, review meetings, workshops, post-it notes, 2-D drawings, mock-up and 3-D models, as well as virtual reality (VR) and Building Information Modeling technology). The clinical employees’ framework is stronger and much more structured than the involvement of FM competences through the different stages of the projects. The property management competences were involved at the early concept phase and design phase, whereas the Operation and Maintenance (O&M) competences were getting involved through the construction and commissioning phase. The value of FM involvement in all stages of the project is seen beneficial, particularly when the FM specialist become a part of the design team and located physically at the same place. The main reported benefits of early FM involvement are cost-effective technical solutions and installations, less design flaws and improved functionality, as well as a stronger ownership and mutual respect between the clinical and FM disciplines. However, not all hospital organizations see the benefits of the FM involvement of all stages, as they are driven by reducing capital cost. In one of the new projects, other ways of involving the FM competences were tested. Additionally, particularly for the O&M competences, a dialogue meeting with a clear focus of sharing experiences with different technical solution was found rewarding in terms of cost benefits.
Research limitations/implications
This study does not consider the social impact of the choices made in the design phase. The findings also indicated a certain development of the FM involvement. This is not studied in two of the newest projects where they are still in the design phase and the FM role was not interviewed.
Practical implications
The PL role is important as a facilitator role of the involvement process.
Social implications
A dialogue meeting with a group of O&M people was found rewarding and valuable for knowledge sharing. This methodology can be further developed and tested, as this group of stakeholders is not always available for giving input in the project.
Originality/value
The value of this study is the description of the interaction between the PLs and the hospital organization in the eight projects and lessons learned by the involvement of FM competences and clinical employees.
Details
Keywords
Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva
Labour efficiency is the key component for the long-term sustainability of construction firms. Recent studies show that modernising organisational/managerial processes is…
Abstract
Purpose
Labour efficiency is the key component for the long-term sustainability of construction firms. Recent studies show that modernising organisational/managerial processes is necessary to raise labour efficiency in many emerging nations. Construction supervision is a crucial element in organisational/managerial practices, which provide blood circulation to the project operations by directing labour. Accordingly, this study aims to quantify the impacts of crucial organisational/managerial elements on the efficiency of labour in building construction projects based on the viewpoint of construction supervisors.
Findings
A total of 28 factors were determined as critical, where lack of labour motivation, poor labour training facilities, poor performance evaluation practices, no labour rewarding mechanism and poor communication/cooperation between parties were judged to be the top five key issues in the list. The validity and reliability of the study findings were ensured through statistical tests and the experts' discussion outcomes. In view of the evolving challenges facing the industry, the results indicate that the organisational policies of construction enterprises in place addressing financial procedures, communication strategies, resource management and performance management practices must be enhanced.
Research limitations/implications
The study findings will make a substantial contribution to reducing the disparity between organisation/management policies and labour practices towards changing how the sector operates to increase labour efficiency in construction projects.
Originality/value
This study contributes to addressing the knowledge gap in the industry associated with the organisational protocols, especially to understand/predict how such elements are significant, how much they influence the efficiency of construction practices and what steps can be made to limit their effects on labour efficiency in construction. These could be crucial in modernising organisational policies and procedures for construction management.
Details
Keywords
Alessandro Lo Presti, Amelia Manuti, Assunta De Rosa and Angelo Elia
The current study makes two main contributions: one theoretical and one methodological. First, it investigated the theoretical prepositions of career sustainability perspective…
Abstract
Purpose
The current study makes two main contributions: one theoretical and one methodological. First, it investigated the theoretical prepositions of career sustainability perspective, which appears particularly suitable for examining project managers' careers' dynamics and patterns, featured by explicit and recursive interactions between individual, temporal and contextual factors. Second, the study aimed to adopt a qualitative approach to this topic as to allow a deeper understanding of individual narratives about careers, highlighting underexplored issues and peculiarities that future research could further examine through quantitative methodologies.
Design/methodology/approach
Project managers' careers are still an under-researched topic, especially through qualitative methods. The study applied career sustainability theory to the realm of project management, moreover, adopting a socio-constructivist perspective. Participants were 50 Italian project managers who were involved through a narrative in-depth interview that focused on career and career success. Their answers were analyzed through thematic analysis of contents and diatextual analysis.
Findings
Results showed that project managers' career could be a prototypical example of sustainable career, basically described in terms of four basic constitutive dimensions as follows: time frame, social space, agency and meaning. Implications for both future theoretical expansion of career sustainability theory and project managers' career management interventions were also discussed.
Originality/value
The originality of the paper could be found in the effort to adopt a socio-constructivist perspective to investigate the topic of career sustainability taking the exemplary case of project managers' career.
Details
Keywords
Laura Saukko, Kirsi Aaltonen and Harri Haapasalo
The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.
Abstract
Purpose
The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.
Design/methodology/approach
A theoretical construct of, referred in this study as integration capability framework is elaborated following a systematic literature review. Thereafter, an integration capability self-assessment model, based on maturity thinking, is derived from the theoretical framework. The self-assessment model is further developed and tested for validity within five inter-organizational project networks in cooperation with industry practitioners, representing construction, industrial engineering, and mining sectors.
Findings
The results show that inter-organizational projects can use the developed model in self-assessing the maturity levels of various integration mechanisms, thus the state of integration capability at any point in time during inter-organizational projects.
Originality/value
This study is an attempt to identify how the integration capability dimensions can be self-assessed in inter-organizational projects, through the maturity levels of various integration mechanisms. The results offer insights for both academics and project management practitioners.