Article
Publication date: 29 November 2022

Minh Van Nguyen

This study aims to identify and prioritize barriers to corporate social responsibility (CSR) in the construction sector.

Abstract

Purpose

This study aims to identify and prioritize barriers to corporate social responsibility (CSR) in the construction sector.

Design/methodology/approach

A literature review was first conducted to identify barriers to CSR performance. After that, construction professionals were invited to validate the appropriateness of the obstacles. The discussion allowed the establishment of a list of barriers to CSR performance and their corresponding categories. Data collected from the survey were then analyzed to prioritize the importance of these barriers by the fuzzy DEMATEL-based ANP (DANP) technique.

Findings

The findings presented 16 barriers to CSR, which were categorized into four clusters. The fuzzy DANP analysis showed that strategic vision is the most crucial cluster, followed by the measurement system, stakeholder perspective and scarce resources. Among the sixteen barriers examined, lack of awareness, knowledge and information of CSR; low priority of CSR; lack of metrics to quantify CSR benefits; lack of guidelines and coherent strategies; and lack of CSR enforcement mechanism are the five most crucial barriers.

Originality/value

This study is one of the first that proposes a comprehensive model to prioritize barriers to CSR performance of contractors considering their interrelationships. It provides construction stakeholders with a framework for understanding the linkage between the barriers and CSR framework under the umbrella of stakeholder theory. Thus, the findings might assist construction practitioners and academics in fostering the success of CSR implementation.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 September 2023

Mohammad Mayouf and Ciaran Gilligan

In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered…

Abstract

Purpose

In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered ambiguous and provides a limited reflection of the issue, which makes it complicated to trace how it originates in the first place. This study aims to examine the causes that lead to underpayments and develop a holistic synthesis of underpayments for subcontractors in the lifecycle of a construction project.

Design/methodology/approach

An open-ended and closed-ended questionnaire was used to collect the data using purposeful sampling with 28 construction stakeholders who ranged from main contractors, subcontractors and others (Small medium enterprises SMEs, Consultancies, Clients etc.). Data collected was analysed to trace drivers and the impact of underpayment and suggested mitigation strategies to be identified whilst viewing the perspectives of a main contractor and subcontractor.

Findings

The findings show that the most prominent driver for underpayments is variation disputes followed by cash flow. The research also suggests mitigation strategies such as collaborative working, more robust budget control and early identification of risks as potential remedies to overcome the underpayment issue. The research concludes with a framework that elicits the complexity underlying underpayments for subcontractors in construction projects.

Originality/value

The research evolves the understanding that underpayment is a complex phenomenon, relying heavily on the data/information exchange mechanism between the main contractor and subcontractors. This research provokes the need to understand underpayment further so it can be mitigated.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387