1 – 10 of 117Ao Li, Dingli Zhang, Zhenyu Sun, Jun Huang and Fei Dong
The microseismic monitoring technique has great advantages on identifying the location, extent and the mechanism of damage process occurring in rock mass. This study aims to…
Abstract
Purpose
The microseismic monitoring technique has great advantages on identifying the location, extent and the mechanism of damage process occurring in rock mass. This study aims to analyze distribution characteristics and the evolution law of excavation damage zone of surrounding rock based on microseismic monitoring data.
Design/methodology/approach
In situ test using microseismic monitoring technique is carried out in the large-span transition tunnel of Badaling Great Wall Station of Beijing-Zhangjiakou high-speed railway. An intelligent microseismic monitoring system is built with symmetry monitoring point layout both on the mountain surface and inside the tunnel to achieve three-dimensional and all-round monitoring results.
Findings
Microseismic events can be divided into high density area, medium density area and low density area according to the density distribution of microseismic events. The positions where the cumulative distribution frequencies of microseismic events are 60 and 80% are identified as the boundaries between high and medium density areas and between medium and low density areas, respectively. The high density area of microseismic events is regarded as the high excavation damage zone of surrounding rock, which is affected by the grade of surrounding rock and the span of tunnel. The prediction formulas for the depth of high excavation damage zone of surrounding rock at different tunnel positions are given considering these two parameters. The scale of the average moment magnitude parameters of microseismic events is adopted to describe the damage degree of surrounding rock. The strong positive correlation and multistage characteristics between the depth of excavation damage zone and deformation of surrounding rock are revealed. Based on the depth of high excavation damage zone of surrounding rock, the prestressed anchor cable (rod) is designed, and the safety of anchor cable (rod) design parameters is verified by the deformation results of surrounding rock.
Originality/value
The research provides a new method to predict the surrounding rock damage zone of large-span tunnel and also provides a reference basis for design parameters of prestressed anchor cable (rod).
Details
Keywords
Junru Zhang, Yumeng Liu and Bo Yan
This study aims to research the large cross-section tunnel stability evaluation method corrected after considering the thickness-span ratio.
Abstract
Purpose
This study aims to research the large cross-section tunnel stability evaluation method corrected after considering the thickness-span ratio.
Design/methodology/approach
First, taking the Liuyuan Tunnel of Huanggang-Huangmei High-Speed Railway as an example and taking deflection of the third principal stress of the surrounding rock at a vault after tunnel excavation as the criterion, the critical buried depth of the large section tunnel was determined. Then, the strength reduction method was employed to calculate the tunnel safety factor under different rock classes and thickness-span ratios, and mathematical statistics was conducted to identify the relationships of the tunnel safety factor with the thickness-span ratio and the basic quality (BQ) index of the rock for different rock classes. Finally, the influences of thickness-span ratio, groundwater, initial stress of rock and structural attitude factors were considered to obtain the corrected BQ, based on which the stability of a large cross-section tunnel with a depth of more than 100 m during mechanized operation was analyzed. This evaluation method was then applied to Liuyuan Tunnel and Cimushan No. 2 Tunnel of Chongqing Urban Expressway for verification.
Findings
This study shows that under different rock classes, the tunnel safety factor is a strict power function of the thickness-span ratio, while a linear function of the BQ to some extent. It is more suitable to use the corrected BQ as a quantitative index to evaluate tunnel stability according to the actual conditions of the site.
Originality/value
The existing industry standards do not consider the influence of buried depth and span in the evaluation of tunnel stability. The stability evaluation method of large section tunnel considering the correction of overburden span ratio proposed in this paper achieves higher accuracy for the stability evaluation of surrounding rock in a full or large-section mechanized excavation of double line high-speed railway tunnels.
Details
Keywords
Isto Huvila, Olle Sköld and Lisa Börjesson
Sharing information about work processes has proven to be difficult. This applies especially to information shared from those who participate in a process to those who remain…
Abstract
Purpose
Sharing information about work processes has proven to be difficult. This applies especially to information shared from those who participate in a process to those who remain outsiders. The purpose of this article is to increase understanding of how professionals document their work practices with a focus on information making by analysing how archaeologists document their information work in archaeological reports.
Design/methodology/approach
In total 47 Swedish archaeological reports published in 2018 were analysed using close reading and constant comparative categorisation.
Findings
Even if explicit narratives of methods and work process have particular significance as documentation of information making, the evidence of information making is spread out all over the report document in (1) procedural narratives, (2) descriptions of methods and tools, (3) actors and actants, (4) photographs, (5) information sources, (6) diagrams and drawings and (7) outcomes. The usability of reports as conveyors of information on information making depends more on how a forthcoming reader can live with it as a whole rather than how to learn of the details it recites.
Research limitations/implications
The study is based on a limited number of documents representing one country and one scholarly and professional field.
Practical implications
Increased focus on the internal coherence of documentation and the complementarity of different types of descriptions could improve information sharing. Further, descriptions of concepts that refer to work activities and the situation when information came into being could similarly improve their usability.
Originality/value
There is little earlier research on how professionals and academics document and describe their information activities.
Details
Keywords
Michael Nkuba, Raban Chanda, Gagoitseope Mmopelwa, Edward Kato, Margaret Najjingo Mangheni and David Lesolle
This paper aims to investigate the effect of using indigenous forecasts (IFs) and scientific forecasts (SFs) on pastoralists’ adaptation methods in Rwenzori region, Western Uganda.
Abstract
Purpose
This paper aims to investigate the effect of using indigenous forecasts (IFs) and scientific forecasts (SFs) on pastoralists’ adaptation methods in Rwenzori region, Western Uganda.
Design/methodology/approach
Data were collected using a household survey from 270 pastoralists and focus group discussions. The multivariate probit model was used in the analysis.
Findings
The results revealed that pastoralists using of IF only more likely to be non-farm enterprises and livestock sales as adaptation strategies. Pastoralists using both SF and IF were more likely to practise livestock migration.
Research limitations/implications
Other factors found to be important included land ownership, land tenure, gender, education level, non-farm and productive assets, climate-related risks and agricultural extension access.
Practical implications
Increasing the number of weather stations in pastoral areas would increase the predictive accuracy of scientific climate information, which results in better adaptive capacity of pastoralists. Active participation of pastoral households in national meteorological dissemination processes should be explored.
Social implications
A two-prong approach that supports both mobile and sedentary pastoralism should be adopted in rangeland development policies.
Originality/value
This study has shown the relevance of IFs in climate change adaptation methods of pastoralists. It has also shown that IFs compliment SFs in climate change adaptation in pastoralism.
Details
Keywords
Hongyuan Wang and Jingcheng Wang
The purpose of this paper aims to design an optimization control for tunnel boring machine (TBM) based on geological identification. For unknown geological condition, the authors…
Abstract
Purpose
The purpose of this paper aims to design an optimization control for tunnel boring machine (TBM) based on geological identification. For unknown geological condition, the authors need to identify them before further optimization. For fully considering multiple crucial performance of TBM, the authors establish an optimization problem for TBM so that it can be adapted to varying geology. That is, TBM can operate optimally under corresponding geology, which is called geology-adaptability.
Design/methodology/approach
This paper adopted k-nearest neighbor (KNN) algorithm with modification to identify geological conditions. The modification includes adjustment of weights in voting procedure and similarity distance measurement, which at suitable for engineering and enhance accuracy of prediction. The authors also design several key performances of TBM during operation, and built a multi-objective function. Further, the multi-objective function has been transformed into a single objective function by weighted-combination. The reformulated optimization was solved by genetic algorithm in the end.
Findings
This paper provides a support for decision-making in TBM control. Through proposed optimization control, the advance speed of TBM has been enhanced dramatically in each geological condition, compared with the results before optimizing. Meanwhile, other performances are acceptable and the method is verified by in situ data.
Originality/value
This paper fulfills an optimization control of TBM considering several key performances during excavating. The optimization is conducted under different geological conditions so that TBM has geological-adaptability.
Details
Keywords
Zhishuo Liu, Qianhui Shen, Jingmiao Ma and Ziqi Dong
This paper aims to extract the comment targets in Chinese online shopping platform.
Abstract
Purpose
This paper aims to extract the comment targets in Chinese online shopping platform.
Design/methodology/approach
The authors first collect the comment texts, word segmentation, part-of-speech (POS) tagging and extracted feature words twice. Then they cluster the evaluation sentence and find the association rules between the evaluation words and the evaluation object. At the same time, they establish the association rule table. Finally, the authors can mine the evaluation object of comment sentence according to the evaluation word and the association rule table. At last, they obtain comment data from Taobao and demonstrate that the method proposed in this paper is effective by experiment.
Findings
The extracting comment target method the authors proposed in this paper is effective.
Research limitations/implications
First, the study object of extracting implicit features is review clauses, and not considering the context information, which may affect the accuracy of the feature excavation to a certain degree. Second, when extracting feature words, the low-frequency feature words are not considered, but some low-frequency feature words also contain effective information.
Practical implications
Because of the mass online reviews data, reading every comment one by one is impossible. Therefore, it is important that research on handling product comments and present useful or interest comments for clients.
Originality/value
The extracting comment target method the authors proposed in this paper is effective.
Details
Keywords
Olanrewaju Ayobami Omoya, Kassandra A. Papadopoulou and Eric Lou
The purpose of this paper is to investigate the application of reliability engineering to oil and gas (O&G) pipeline systems with the aim of identifying means through which…
Abstract
Purpose
The purpose of this paper is to investigate the application of reliability engineering to oil and gas (O&G) pipeline systems with the aim of identifying means through which reliability engineering can be used to improve pipeline integrity, specifically with regard to man-made incidents (e.g. material/weld/equipment failure, corrosion, incorrect operation and excavation damages).
Design/methodology/approach
A literature review was carried out on the application of reliability tools to O&G pipeline systems and four case studies are presented as examples of how reliability engineering can help to improve pipeline integrity. The scope of the paper is narrowed to four stages of the pipeline life cycle; the decommissioning stage is not part of this research. A survey was also carried out using a questionnaire to check the level of application of reliability tools in the O&G industry.
Findings
Data from survey and literature show that a reliability-centred approach can be applied and will improve pipeline reliability where applied; however, there are several hindrances to the effective application of reliability tools, the current methods are time based and focus mainly on design against failure rather than design for reliability.
Research limitations/implications
The tools identified do not cover the decommissioning of the pipeline system. Research validation sample size can be broadened to include more pipeline stakeholders/professionals. Pipeline integrity management systems are proprietary information and permission is required from stakeholders to do a detailed practical study.
Originality/value
This paper proposes the minimum applied reliability tools for application during the design, operation and maintenance phases targeted at the O&G industry. Critically, this paper provides a case for an integrated approach to applying reliability and maintenance tools that are required to reduce pipeline failure incidents in the O&G industry.
Details
Keywords
This paper aims to present a highly accessible and affordable tracking model for earthmoving operations in an attempt to overcome some of the limitations of current tracking…
Abstract
Purpose
This paper aims to present a highly accessible and affordable tracking model for earthmoving operations in an attempt to overcome some of the limitations of current tracking models.
Design/methodology/approach
The proposed methodology involves four main processes: acquiring onsite terrestrial images, processing the images into 3D scaled cloud data, extracting volumetric measurements and crew productivity estimations from multiple point clouds using Delaunay triangulation and conducting earned value/schedule analysis and forecasting the remaining scope of work based on the estimated performance. For validation, the tracking model was compared with an observation-based tracking approach for a backfilling site. It was also used for tracking a coarse base aggregate inventory for a road construction project.
Findings
The presented model has proved to be a practical and accurate tracking approach that algorithmically estimates and forecasts all performance parameters from the captured data.
Originality/value
The proposed model is unique in extracting accurate volumetric measurements directly from multiple point clouds in a developed code using Delaunay triangulation instead of extracting them from textured models in modelling software which is neither automated nor time-effective. Furthermore, the presented model uses a self-calibration approach aiming to eliminate the pre-calibration procedure required before image capturing for each camera intended to be used. Thus, any worker onsite can directly capture the required images with an easily accessible camera (e.g. handheld camera or a smartphone) and can be sent to any processing device via e-mail, cloud-based storage or any communication application (e.g. WhatsApp).
Details