Search results

1 – 10 of 602

Abstract

Details

Capitalism, Health and Wellbeing
Type: Book
ISBN: 978-1-83797-897-7

Article
Publication date: 21 February 2024

Mohammad Esmaeil Nazari and Zahra Assari

This study aims to solve optimal pricing and power bidding strategy problem for integrated combined heat and power (CHP) system by using a modified heuristic optimization…

Abstract

Purpose

This study aims to solve optimal pricing and power bidding strategy problem for integrated combined heat and power (CHP) system by using a modified heuristic optimization algorithm.

Design/methodology/approach

In electricity markets, generation companies compete according to their bidding parameters; therefore, optimal pricing and bidding strategy are solved. Recently, CHP units are significantly operated by generation companies to meet power and heat, simultaneously.

Findings

For validation, it is shown that profit is improved by 0.04%–48.02% for single and 0.02%–31.30% for double-sided auctions. As heat price curve is extracted, the simulation results show that when CHP system is integrated with other units results in profit increase and emission decrease by 3.04%–3.18% and 2.23%–4.13%, respectively. Also, CHP units significantly affect bidding parameters.

Originality/value

The novelties are pricing and bidding strategy of integrated CHP system is solved; local heat selling is considered in pricing and bidding strategy problem and heat price curve is extracted; the effects of CHP utilization on bidding parameters are investigated; a modified heuristic and deterministic optimization algorithm is presented.

Details

International Journal of Energy Sector Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1750-6220

Keywords

Open Access
Article
Publication date: 26 March 2024

Jose A. Fernández Gallardo and Ricardo Hernandez Rojas

The main objective of this research is to analyze satisfaction with tourist services linked to the concept of sustainability in the context of a visit to the so-called equestrian…

Abstract

Purpose

The main objective of this research is to analyze satisfaction with tourist services linked to the concept of sustainability in the context of a visit to the so-called equestrian show. The equestrian show adds values from the cultures that passed through the city. Specifically, the study focuses on tourist loyalty based on satisfaction with tourist services, satisfaction with the equestrian show and its overall quality. The fieldwork has been conducted in Córdoba, Spain. There are few studies on the relationship between tourist services linked to the concepts of sustainability and loyalty from the perspective of equestrian show management, making this a novel contribution to research.

Design/methodology/approach

The methodology used is based on a partial least squares structural equation modeling (PLS-SEM) approach.

Findings

To achieve the proposed objective, a structured questionnaire was used, and the results obtained confirm that satisfaction with tourist services linked to the concept of sustainability and the assessment of quality positively influence tourist loyalty. Consequently, they recommend returning to the destination and repeating the visit.

Originality/value

Heritage in Córdoba, Spain, is internationally recognized. Its uniqueness, with four world inscriptions along with the cultures that inhabited it, left a material heritage legacy in the city. Over time, this legacy has made it a magnet for visitors, making it essential to delve into its management and how concepts such as satisfaction with tourist services, combined with sustainability, impact the improvement of the visit.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-1266

Keywords

Article
Publication date: 2 January 2024

Wenlong Cheng and Wenjun Meng

This study aims to solve the problem of job scheduling and multi automated guided vehicle (AGV) cooperation in intelligent manufacturing workshops.

Abstract

Purpose

This study aims to solve the problem of job scheduling and multi automated guided vehicle (AGV) cooperation in intelligent manufacturing workshops.

Design/methodology/approach

In this study, an algorithm for job scheduling and cooperative work of multiple AGVs is designed. In the first part, with the goal of minimizing the total processing time and the total power consumption, the niche multi-objective evolutionary algorithm is used to determine the processing task arrangement on different machines. In the second part, AGV is called to transport workpieces, and an improved ant colony algorithm is used to generate the initial path of AGV. In the third part, to avoid path conflicts between running AGVs, the authors propose a simple priority-based waiting strategy to avoid collisions.

Findings

The experiment shows that the solution can effectively deal with job scheduling and multiple AGV operation problems in the workshop.

Originality/value

In this paper, a collaborative work algorithm is proposed, which combines the job scheduling and AGV running problem to make the research results adapt to the real job environment in the workshop.

Details

Robotic Intelligence and Automation, vol. 44 no. 1
Type: Research Article
ISSN: 2754-6969

Keywords

Article
Publication date: 9 April 2024

Charles A. Donnelly, Sushobhan Sen, John W. DeSantis and Julie M. Vandenbossche

The time-varying equivalent linear temperature gradient (ELTG) significantly affects the development of faulting and must therefore be accounted for in pavement design. The same…

Abstract

Purpose

The time-varying equivalent linear temperature gradient (ELTG) significantly affects the development of faulting and must therefore be accounted for in pavement design. The same is true for faulting of bonded concrete overlays of asphalt (BCOA) with slabs larger than 3 x 3 m. However, the evaluation of ELTG in Mechanistic-Empirical (ME) BCOA design is highly time-consuming. The use of an effective ELTG (EELTG) is an efficient alternative to calculating ELTG. In this study, a model to quickly evaluate EELTG was developed for faulting in BCOA for panels 3 m or longer in size, whose faulting is sensitive to ELTG.

Design/methodology/approach

A database of EELTG responses was generated for 144 BCOAs at 169 locations throughout the continental United States, which was used to develop a series of prediction models. Three methods were evaluated: multiple linear regression (MLR), artificial neural networks (ANNs), and multi-gene genetic programming (MGGP). The performance of each method was compared, considering both accuracy and model complexity.

Findings

It was shown that ANNs display the highest accuracy, with an R2 of 0.90 on the validation dataset. MLR and MGGP models achieved R2 of 0.73 and 0.71, respectively. However, these models consisted of far fewer free parameters as compared to the ANNs. The model comparison performed in this study highlights the need for researchers to consider the complexity of models so that their direct implementation is feasible.

Originality/value

This research produced a rapid EELTG prediction model for BCOAs that can be incorporated into the existing faulting model framework.

Article
Publication date: 21 November 2023

Pham Duc Tai, Krit Jinawat and Jirachai Buddhakulsomsiri

Distribution network design involves a set of strategic decisions in supply chains because of their long-term impacts on the total logistics cost and environment. To incorporate a…

Abstract

Purpose

Distribution network design involves a set of strategic decisions in supply chains because of their long-term impacts on the total logistics cost and environment. To incorporate a trade-off between financial and environmental aspects of these decisions, this paper aims to determine an optimal location, among candidate locations, of a new logistics center, its capacity, as well as optimal network flows for an existing distribution network, while concurrently minimizing the total logistics cost and gas emission. In addition, uncertainty in transportation and warehousing costs are considered.

Design/methodology/approach

The problem is formulated as a fuzzy multiobjective mathematical model. The effectiveness of this model is demonstrated using an industrial case study. The problem instance is a four-echelon distribution network with 22 products and a planning horizon of 20 periods. The model is solved by using the min–max and augmented ε-constraint methods with CPLEX as the solver. In addition to illustrating model’s applicability, the effect of choosing a new warehouse in the model is investigated through a scenario analysis.

Findings

For the applicability of the model, the results indicate that the augmented ε-constraint approach provides a set of Pareto solutions, which represents the ideal trade-off between the total logistics cost and gas emission. Through a case study problem instance, the augmented ε-constraint approach is recommended for similar network design problems. From a scenario analysis, when the operational cost of the new warehouse is within a specific fraction of the warehousing cost of third-party warehouses, the solution with the new warehouse outperforms that without the new warehouse with respective to financial and environmental objectives.

Originality/value

The proposed model is an effective decision support tool for management, who would like to assess the impact of network planning decisions on the performance of their supply chains with respect to both financial and environmental aspects under uncertainty.

Article
Publication date: 26 July 2022

Hiwa Esmaeilzadeh, Alireza Rashidi Komijan, Hamed Kazemipoor, Mohammad Fallah and Reza Tavakkoli-Moghaddam

The proposed model aims to consider the flying hours as a criterion to initiate maintenance operation. Based on this condition, aircraft must be checked before flying hours…

Abstract

Purpose

The proposed model aims to consider the flying hours as a criterion to initiate maintenance operation. Based on this condition, aircraft must be checked before flying hours threshold is met. After receiving maintenance service, the model ignores previous flying hours and the aircraft can keep on flying until the threshold value is reached again. Moreover, the model considers aircraft age and efficiency to assign them to flights.

Design/methodology/approach

The aircraft maintenance routing problem (AMRP), as one of the most important problems in the aviation industry, determines the optimal route for each aircraft along with meeting maintenance requirements. This paper presents a bi-objective mixed-integer programming model for AMRP in which several criteria such as aircraft efficiency and ferrying flights are considered.

Findings

As the solution approaches, epsilon-constraint method and a non-dominated sorting genetic algorithm (NSGA-II), including a new initializing algorithm, are used. To verify the efficiency of NSGA-II, 31 test problems in different scales are solved using NSGA-II and GAMS. The results show that the optimality gap in NSGA-II is less than 0.06%. Finally, the model was solved based on real data of American Eagle Airlines extracted from Kaggle datasets.

Originality/value

The authors confirm that it is an original paper, has not been published elsewhere and is not currently under consideration of any other journal.

Article
Publication date: 28 February 2023

Aman Dua, Rishika Chhabra and Deepankar Sinha

The first purpose is to assess the quality of containerized multimodal export and the second is to develop and demonstrate the design of a service network with quality approach.

Abstract

Purpose

The first purpose is to assess the quality of containerized multimodal export and the second is to develop and demonstrate the design of a service network with quality approach.

Design/methodology/approach

The article used the structural equation model to develop a model to measure the quality of multimodal transportation for containerized exports and finalized the model with an alternative approach. The evolutionary algorithm had been used to design a service network based on quality.

Findings

Provided factors affecting quality of multimodal transportation and reverse to one hypothesis, the construct variation in cost, time shape and quantity did not affect the quality of multimodal transportation for containerized exports. The model without variation construct was finalized by exploring causality.

Research limitations/implications

This research had scope till container loading onto the vessel and assessed the quality for containerized cargo only, and second research purpose is limited by assumed values of fitness function and the limited number of nodes, in service network design demonstration.

Practical implications

This research provided a tool to measure the quality of multimodal transportation for containerized exports and demonstrated the field application of the model developed in service network design. This approach included all factors applicable across the container movement. The integrated approach of the article provided an organized method to design a service network for containerized exports.

Originality/value

This work provided the tool to assess the quality of multimodal transportation for containerized exports and developed an approach to design a service network of multimodal transportation based on quality. This approach has considered the factors of multimodal transportation comprehensively in contrast to the optimization approaches based on operation research techniques.

Details

Benchmarking: An International Journal, vol. 31 no. 1
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 8 November 2022

Junlong Peng and Xiang-Jun Liu

This research is aimed to mainly be applicable to expediting engineering projects, uses the method of inverse optimization and the double-layer nested genetic algorithm combined…

Abstract

Purpose

This research is aimed to mainly be applicable to expediting engineering projects, uses the method of inverse optimization and the double-layer nested genetic algorithm combined with nonlinear programming algorithm, study how to schedule the number of labor in each process at the minimum cost to achieve an extremely short construction period goal.

Design/methodology/approach

The method of inverse optimization is mainly used in this study. In the first phase, establish a positive optimization model, according to the existing labor constraints, aiming at the shortest construction period. In the second phase, under the condition that the expected shortest construction period is known, on the basis of the positive optimization model, the inverse optimization method is used to establish the inverse optimization model aiming at the minimum change of the number of workers, and finally the optimal labor allocation scheme that meets the conditions is obtained. Finally, use algorithm to solve and prove with a case.

Findings

The case study shows that this method can effectively achieve the extremely short duration goal of the engineering project at the minimum cost, and provide the basis for the decision-making of the engineering project.

Originality/value

The contribution of this paper to the existing knowledge is to carry out a preliminary study on the relatively blank field of the current engineering project with a very short construction period, and provide a path for the vast number of engineering projects with strict requirements on the construction period to achieve a very short construction period, and apply the inverse optimization method to the engineering field. Furthermore, a double-nested genetic algorithm and nonlinear programming algorithm are designed. It can effectively solve various optimization problems.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 April 2024

Ting Zhou, Yingjie Wei, Jian Niu and Yuxin Jie

Metaheuristic algorithms based on biology, evolutionary theory and physical principles, have been widely developed for complex global optimization. This paper aims to present a…

Abstract

Purpose

Metaheuristic algorithms based on biology, evolutionary theory and physical principles, have been widely developed for complex global optimization. This paper aims to present a new hybrid optimization algorithm that combines the characteristics of biogeography-based optimization (BBO), invasive weed optimization (IWO) and genetic algorithms (GAs).

Design/methodology/approach

The significant difference between the new algorithm and original optimizers is a periodic selection scheme for offspring. The selection criterion is a function of cyclic discharge and the fitness of populations. It differs from traditional optimization methods where the elite always gains advantages. With this method, fitter populations may still be rejected, while poorer ones might be likely retained. The selection scheme is applied to help escape from local optima and maintain solution diversity.

Findings

The efficiency of the proposed method is tested on 13 high-dimensional, nonlinear benchmark functions and a homogenous slope stability problem. The results of the benchmark function show that the new method performs well in terms of accuracy and solution diversity. The algorithm converges with a magnitude of 10-4, compared to 102 in BBO and 10-2 in IWO. In the slope stability problem, the safety factor acquired by the analogy of slope erosion (ASE) is closer to the recommended value.

Originality/value

This paper introduces a periodic selection strategy and constructs a hybrid optimizer, which enhances the global exploration capacity of metaheuristic algorithms.

Details

Engineering Computations, vol. 41 no. 2
Type: Research Article
ISSN: 0264-4401

Keywords

1 – 10 of 602