Search results

1 – 10 of 135
Case study
Publication date: 9 September 2020

Rajni Kant Rajhans

The case is focused to meet the following learning objectives: the readers will be able to recall basic cash flow estimation concepts; and the readers will be able to explain…

Abstract

Learning outcomes

The case is focused to meet the following learning objectives: the readers will be able to recall basic cash flow estimation concepts; and the readers will be able to explain various features of capital cash flow (CCF). The participants will be able to implement the CCF model in real estate firm valuation. The participants will be able to compare CCF and free cash flow to the firm (FCFF) models. The participants will be able to evaluate the benefits of CCF over FCFF. The readers will be able to construct the CCF valuation model for firm valuation.

Case overview/synopsis

On 19th April 2019, Mr Kai, an analyst tracking real estate firms was excited to present to his team a new robust technique of firm valuation suitable for real estate companies, namely, the CCF technique and was also keen to deliberate on its application. Though the investment scope using this technique could be located in Godrej properties (GP), a reputed brand and the largest listed real estate developer by sales in 2018, yet, he was concerned about the assumptions of growth of real estate industry in India, in general, and the GP in particular. Importantly, this was because the real estate market in India was undergoing many structural changes. For instance, the buyers’ preferences were changing and unsold inventory in the industry was at its peak. Under these market conditions, an announcement was made by GP about a target return on equity of 20% in 2018–2023 expecting a dominant place in the real estate market in India, which also carried the threat of jeopardizing the reputation of GP, if under any circumstance the target was not accomplished.

Complexity academic level

Masters program.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS: 11 Strategy.

Details

Emerald Emerging Markets Case Studies, vol. 10 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 12 November 2021

Susan Smith

The case uses Carillion plc, a company which focussed on providing maintenance, facilities management and energy services to buildings and large property estates, in public and…

Abstract

Research methodology

The case uses Carillion plc, a company which focussed on providing maintenance, facilities management and energy services to buildings and large property estates, in public and private sectors; infrastructure services for roads, railways and utility networks, with contracts including road and hospital construction and many strategic service contracts, e.g. free school meals. The case uses financial analysis techniques to explore whether the failure was foreseeable and questions the extent to which existing international financial reporting standards support or inhibit the decision usefulness they aspire to. The case uses only publicly available information.

Complexity academic level

This case can be used in undergraduate financial reporting and current issues in accounting courses/modules at the postgraduate level.

Details

The CASE Journal, vol. 18 no. 1
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 5 August 2022

Pervin A. Gandhi and Sujo Thomas

The case proposes a discussion of the time value of money and capital budgeting concepts, including determining the effective overall cost of capital, estimating working capital…

Abstract

Research methodology

The case proposes a discussion of the time value of money and capital budgeting concepts, including determining the effective overall cost of capital, estimating working capital requirements, consideration of all relevant cash flows – including opportunity costs, finding the present value of future cash flows (annuities and lump-sum cash flows) by linking the concepts of weighted average cost of capital and working capital and net present value (NPV) and internal rate of return (IRR).

Case overview/synopsis

Jehan Wadia, a newly appointed finance manager of Tembo Global Industries Ltd., is facing a dilemma in recommending an investment decision to Mr Variava, Chief Finance Officer. Implementation of the project requires an investment of INR 82m. Ms Stella, funding division head, proposed financing through equity and term loans in the proportion of 3:2, respectively. Mr Shrinivasan, handling the short-term financial needs of the firm, suggested a finance mix having a higher weight-age of debt. Mr Variava desires to maximize the wealth by taping the opportunity. The case is written for an experience in the capital budgeting dichotomy faced by managers in real-life situations.

Complexity academic level

This case can be used in various contexts – as a preparatory case in a foundation course of Financial Management at the graduate level to instill the fundamentals for evaluating long-term investment decisions or in courses of Strategic Financial Management or Corporate Finance at the undergraduate or graduate level as a capstone case to reinforce the application of multiple concepts in strategic financial decision making.

Details

The CASE Journal, vol. 18 no. 6
Type: Case Study
ISSN: 1544-9106

Keywords

Case study
Publication date: 20 January 2017

Péter Esö, Graeme Hunter, Peter Klibanoff and Karl Schmedders

An asset management company must replace the manager of its two signature mutual funds, who is about to retire. Two candidates have been short-listed. The management team is…

Abstract

An asset management company must replace the manager of its two signature mutual funds, who is about to retire. Two candidates have been short-listed. The management team is divided and cannot decide which of the two candidates would make the better mutual fund manager. The retiring manager presents a linear regression model to examine success factors of mutual fund managers. This linear regression is the starting point for the subsequent analysis.

Application of linear regression analysis to analyze the performance of mutual fund managers.

Details

Kellogg School of Management Cases, vol. no.
Type: Case Study
ISSN: 2474-6568
Published by: Kellogg School of Management

Keywords

Case study
Publication date: 20 January 2017

Robert F. Bruner, Michael J. Innes and William J. Passer

Set in September 1992, this exercise provides teams of students the opportunity to negotiate terms of a merger between AT&T and McCaw Cellular. AT&T, one of the largest U.S…

Abstract

Set in September 1992, this exercise provides teams of students the opportunity to negotiate terms of a merger between AT&T and McCaw Cellular. AT&T, one of the largest U.S. corporations, was the dominant competitor in long-distance telephone communications in the United States. McCaw was the largest competitor in the rapidly growing cellular-telephone communications industry. Prior to the negotiations, AT&T had no position in cellular communications. This case and its companion (F-1143) are designed to allow students to be assigned roles to play. The case may pursue some or all of the following teaching objectives: exercising valuation skills, practicing strategic analysis, exercising bargaining skills, and illustrating practical aspects of mergers and acquisitions.

Details

Darden Business Publishing Cases, vol. no.
Type: Case Study
ISSN: 2474-7890
Published by: University of Virginia Darden School Foundation

Keywords

Case study
Publication date: 19 December 2022

Juan Ernesto Perez Perez

At the end of the case students will be able to:1. Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh…

Abstract

Learning outcomes

At the end of the case students will be able to:

1. Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh Edition guide.

2. Determine high-level risks by articulating the WBS and RBS of a construction project.

3. Perform a qualitative and quantitative analysis of the probability and impact of risks through the heat map tool and the Expected Monetary Value (EMV) technique.

4. Propose the different response strategies contemplated in the risk management through the formulation of a response and contingency plan.

Case overview/synopsis

MORESA S.A.S was a family company founded in 1994, whose value proposition focused on construction and permanent advice for the execution of innovative and contemporary projects with more than 27 years of experience in the city of San José de Cucuta, department of Norte de Santander, Colombia. The objective of the case is to Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh Edition guide; Determine high-level risks by articulating the WBS and RBS of a construction project; Perform a qualitative and quantitative analysis of the probability and impact of risks through the heat map tool and the Expected Monetary Value (EMV) technique and propose the different response strategies contemplated in the risk management through the formulation of a response and contingency plan. The teaching case is designed for academic programs in areas of knowledge of civil engineering, architecture and at postgraduate level such as: Master’s in civil engineering, Master’s in risk management, Master in project management or MBA. For this case, an expert judgment was developed with professionals belonging to different areas of knowledge. Likewise, secondary information was collected from the organization's strategic documents and the analogous estimation through the historical records of the project portfolio developed by the construction company. Finally, the case, classified in the Built Environment, a challenge that project managers must face in VUCA environment through risk management.

Complexity academic level

The teaching case is designed for academic programs in areas of knowledge of civil engineering, architecture and at postgraduate level such as: Master’s in civil engineering, Master’s in risk management, Master’s in project management or MBA. In the modules of risk management, project management, international standards, the case guides the applicability of methods and artifacts used in risk management considering the process identification, quantitative, qualitative analysis, and development of response strategies and contingency plans.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 17 October 2012

Japhet Gabriel Mbura

This case study intends to add knowledge and understanding of supply chain management particularly with respect to international logistics.

Abstract

Subject area

This case study intends to add knowledge and understanding of supply chain management particularly with respect to international logistics.

Study level/applicability

The case study can be used in both undergraduate and postgraduate levels. Students pursuing Master of Science in Logistics, Supply Chain Management and those doing bachelor degrees in the same areas can have a better insight and special interest of the case. Professional boards may also use the case to empirically make students understand this area.

Case overview

The railway sub-sector in East Africa – Tanzania in particular – is an important transport mode but has a declining performance. The market share is estimated at only 4 percent of the freight market. Still knowledge about traffic, particularly for freight, is scant. The main dilemma is whether traffic of the central corridor is more intra- or inter-Tanzania. The case studies techniques appropriate for meaningful traffic forecasting and through a simple regression model it resolves the freight conflicts between Kenya rail and the Central Corridor. It provides students with applied traffic forecasting tools.

Expected learning outcomes

The case focuses on techniques of traffic forecasting, development of traffic scenarios and on issues related to intermodal transport especially between road, rail and ocean. At the end of using this Case students should be able to: explain the methods, techniques and models used in traffic forecasting; understand intermodal linkages in international Logistics; use different approaches to make logistics market assessment; and forecast traffic in all modes using different scenarios.

Supplementary materials

Teaching notes are available for educators only. Please contact your library to gain login details or e-mail support@emeraldinsight.com to request teaching notes.

Case study
Publication date: 20 January 2017

Robert F. Bruner

In January 1996, the chief financial officer must fashion a response to a raider who claims that a major business segment of the company should be sold because it is not earning a…

Abstract

In January 1996, the chief financial officer must fashion a response to a raider who claims that a major business segment of the company should be sold because it is not earning a satisfactory rate of return (ROR). The case recounts the debate within the company over the use of a single hurdle rate to evaluate all segments of the company versus a risk-adjusted hurdle rate system. The students’ tasks are to resolve the debate, estimate weighted-average costs of capital (WACC) for the two business segments, and respond to the raider. Because the case was prepared to serve as part of an introduction to estimating investors’ required rates of return, it would best follow one or two class sessions introducing techniques for estimating WACC. Although the numerical calculations required are light, some of the subtleties about the use of risk-adjusted hurdle rates will require time for the novice to absorb. The case can be used to pursue a variety of teaching objectives, including (1) extending risk return (i.e., mean variance) analysis to corporate finance; (2) surveying classic arguments for and against the use of risk-adjusted hurdle rate systems; (3) assessing the assumptions and limitations of risk-adjusted hurdle rate systems; (4) exercising the estimation of segment WACCs; and (5) considering possible organizational barriers to the implementation of risk-adjusted hurdle rates.

Case study
Publication date: 20 January 2017

Craig Furfine and Mitchell Petersen

In April 2012 Bill Nichols, a financial analyst at the real estate investment firm Koenig Capital, was about to enter a unique lease renegotiation. One of Koenig's tenants…

Abstract

In April 2012 Bill Nichols, a financial analyst at the real estate investment firm Koenig Capital, was about to enter a unique lease renegotiation. One of Koenig's tenants, Hasperat Inc., had sixteen years left on its long-term lease of the Kelley Building, a 165,000-square-foot office building in downtown Cleveland. The lease contained a clause giving Hasperat the option to buy the Kelley Building from Koenig. When Nichols tried to place a mortgage on the property to take advantage of low interest rates, he learned that the existence of this option in the lease contract prevented lenders from offering Koenig their lowest rates. As a result, Nichols had been tasked with renegotiating the lease to remove the option clause. This unexpected event offered Nichols the opportunity to use his financial skills. He needed to calculate the fair value of the purchase option to be able to justify to his superiors by how much they should compensate Hasperat. Students will step into the role of Bill Nichols and apply real options modeling techniques to value the purchase option in Hasperat's lease.

After reading and analyzing the case, students will be able to:

  • Apply real options theory to the valuation of a purchase option in a commercial real estate lease

  • Identify the common mistakes in applying traditional discounted cash flow (DCF) analysis to financial problems with option components

Apply real options theory to the valuation of a purchase option in a commercial real estate lease

Identify the common mistakes in applying traditional discounted cash flow (DCF) analysis to financial problems with option components

Details

Kellogg School of Management Cases, vol. no.
Type: Case Study
ISSN: 2474-6568
Published by: Kellogg School of Management

Keywords

Case study
Publication date: 29 November 2020

Rajaram Govindarajan and Mohammed Laeequddin

Learning outcomes are as follows: students will discover the importance of process orientation in management; students will determine the root cause of the problem by applying…

Abstract

Learning outcomes

Learning outcomes are as follows: students will discover the importance of process orientation in management; students will determine the root cause of the problem by applying root cause analysis technique; students will identify the failure modes, analyze their effect, score them on a scale and prioritize the corrective action to prevent the failures; students will analyze the processes and propose error-proof system/s; and students will analyze organizational culture and ethical issues.

Case overview/synopsis

Purpose: This case study is intended as a class-exercise, for students to discover the importance of process-orientation in management, analyze the ethical dilemma in health care and to apply quality management techniques, such as five-why, root cause analysis, failure mode and effect analysis (FMEA) and error-proofing, in the management of the health-care and service industry. Design/methodology/approach: A voluntary reporting of a case of “radiation overdose” in a hospital’s radio therapy treatment unit, which led to an ethical dilemma. Consequently, a study was conducted to establish the causes of the incident and to develop a fail-proof system, to avoid recurrence. Findings: After careful analysis of the process-flow and the root causes, 25 potential failure modes were detected and the team had assigned a risk priority number (RPN) for each potential incident, selected the top ten RPNs and developed an error-proofing system to prevent recurrence. Subsequently, the improvement process was carried out for all the 25 potential incidents and a new control mechanism was implemented. The question of ethical dilemma remained unresolved. Research limitations/implications: Ishikawa diagram, FMEA and Poka-Yoke techniques require a multi-disciplinary team with process knowledge in identifying the possible root causes for errors, potential risks and also the possible error-proofing method/s. Besides, these techniques need frank discussions and agreement among team members on the efforts for the development of action plan, implementation and control of the new processes. Practical implications: Students can take the case data to identify root cause analysis and the RPN (RPN = possibility of detection × probability of occurrence × severity), to redesign the protocols, through systematic identification of the deficiencies of the existing protocols. Further, they can recommend quality improvement projects. Faculty can navigate the case session orientation, emphasizing quality management or ethical practices, depending on the course for which the case is selected.

Complexity academic level

MBA or PG Diploma in Management – health-care management, hospital administration, operations management, services operations, total quality management (TQM) and ethics.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

1 – 10 of 135