Search results

1 – 10 of over 1000
Open Access
Article
Publication date: 11 January 2024

Adewale Allen Sokan-Adeaga, Godson R.E.E. Ana, Abel Olajide Olorunnisola, Micheal Ayodeji Sokan-Adeaga, Hridoy Roy, Md Sumon Reza and Md. Shahinoor Islam

This study aims to assess the effect of water variation on bioethanol production from cassava peels (CP) using Saccharomyces cerevisiae yeast as the ethanologenic agent.

Abstract

Purpose

This study aims to assess the effect of water variation on bioethanol production from cassava peels (CP) using Saccharomyces cerevisiae yeast as the ethanologenic agent.

Design/methodology/approach

The milled CP was divided into three treatment groups in a small-scale flask experiment where each 20 g CP was subjected to two-stage hydrolysis. Different amount of water was added to the fermentation process of CP. The fermented samples were collected every 24 h for various analyses.

Findings

The results of the fermentation revealed that the highest ethanol productivity and fermentation efficiency was obtained at 17.38 ± 0.30% and 0.139 ± 0.003 gL−1 h−1. The study affirmed that ethanol production was increased for the addition of water up to 35% for the CP hydrolysate process.

Practical implications

The finding of this study demonstrates that S. cerevisiae is the key player in industrial ethanol production among a variety of yeasts that produce ethanol through sugar fermentation. In order to design truly sustainable processes, it should be expanded to include a thorough analysis and the gradual scaling-up of this process to an industrial level.

Originality/value

This paper is an original research work dealing with bioethanol production from CP using S. cerevisiae microbe.

Highlights

  1. Hydrolysis of cassava peels using 13.1 M H2SO4 at 100 oC for 110 min gave high Glucose productivity

  2. Highest ethanol production was obtained at 72 h of fermentation using Saccharomyces cerevisiae

  3. Optimal bioethanol concentration and yield were obtained at a hydration level of 35% agitation

  4. Highest ethanol productivity and fermentation efficiency were 17.3%, 0.139 g.L−1.h−1

Hydrolysis of cassava peels using 13.1 M H2SO4 at 100 oC for 110 min gave high Glucose productivity

Highest ethanol production was obtained at 72 h of fermentation using Saccharomyces cerevisiae

Optimal bioethanol concentration and yield were obtained at a hydration level of 35% agitation

Highest ethanol productivity and fermentation efficiency were 17.3%, 0.139 g.L−1.h−1

Details

Arab Gulf Journal of Scientific Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1985-9899

Keywords

Open Access
Article
Publication date: 7 December 2023

Neil Govender, Samuel Laryea and Ron Watermeyer

Competitive tendering in South Africa is often associated with procurement based on the lowest fee tendered. Previous research on this topic did not provide in-depth examinations…

Abstract

Purpose

Competitive tendering in South Africa is often associated with procurement based on the lowest fee tendered. Previous research on this topic did not provide in-depth examinations of how pricing within consulting engineering companies was affected by competitive tendering nor did it illuminate the extent to which professional services were impacted by competitive tendering. This paper aims to examine the implications of competitive tendering on pricing and delivery of consulting engineering services in South Africa.

Design/methodology/approach

A survey research strategy with a questionnaire as the research instrument elicited qualitative data from 28 experienced consulting engineers in South Africa. Thematic analysis was used to analyse qualitative data from the questionnaires.

Findings

Three key themes were identified, namely: considerations when determining consulting engineering fees on competitively tendered projects; the impact of reduced fees due to competitive tendering on the delivery of consulting engineering services; and interventions to prevent unsustainably “low” professional fees. Many consulting engineers in South Africa still determine fees using fee scales, while other considerations include resources, project complexity, risk, etc. Most participants asserted that design optimisation/value engineering, training, meetings and construction monitoring were adversely impacted by “low” fees.

Originality/value

This paper provides in-depth qualitative feedback from experienced consulting engineers (most having more than 20 years’ experience) on a topical issue in the South African construction industry. Thematic analysis was a novel method of analysis that was not used previously in this area of study.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Content available
Book part
Publication date: 18 January 2024

Abstract

Details

Artificial Intelligence, Engineering Systems and Sustainable Development
Type: Book
ISBN: 978-1-83753-540-8

Open Access
Article
Publication date: 5 July 2023

Tiyamike Ngonda, Richard Nkhoma and Thabo Falayi

The study compares how work-integrated learning (WIL) placement positioning, duration, assessment strategies and environment at three Southern African universities influence…

Abstract

Purpose

The study compares how work-integrated learning (WIL) placement positioning, duration, assessment strategies and environment at three Southern African universities influence engineering students' academic and employability outcomes.

Design/methodology/approach

The study used a qualitative case study approach that drew on the principles of collaborative autoethnography (CAE). The researchers reflected on WIL placement practices, structure, assessment, environment and outcomes at their universities and then analysed the reflections using comparative descriptive techniques.

Findings

The study reports no uniformity among the universities in positioning WIL placement in the curriculum. It is done during end-of-year vacations, between the penultimate and final year or in the last year. The study found WIL placement positioning does not influence academic outcomes; however, the influence on employability outcomes needs further investigation. Components of WIL placement assessment are similar, presentations, logbooks and reports. However, there are differences in the weightings of the various assessment components and the contribution of the industry supervisor. There is a growing trend towards placing students within universities to mitigate the challenges of limited opportunities of placements available in the industry. The impact of this also needs to be further investigated. Lastly, there are policy-related challenges in placing international students. Work restrictions on student visas limit international students’ access to WIL placement. Southern African universities need to lobby the waivers to student visa restrictions that limit their participation in WIL programs if there are to succeed in their internationalisation efforts.

Originality/value

The study highlights the gaps in understanding Southern African universities' WIL placement practices, particularly relating to the positioning of WIL placement in the curriculum, the assessment methods used and the theory to work integration and employability outcomes.

Details

Higher Education, Skills and Work-Based Learning, vol. 14 no. 1
Type: Research Article
ISSN: 2042-3896

Keywords

Article
Publication date: 26 March 2024

Mughees Aslam, Edmund Baffoe-Twum and Sohail Malik

Lean construction (LC) is an innovative approach in the construction industry that has shown significant success in developed countries. Although LC has potential in the…

Abstract

Purpose

Lean construction (LC) is an innovative approach in the construction industry that has shown significant success in developed countries. Although LC has potential in the construction sector of Pakistan, it has not been extensively explored. This study aims to address this knowledge gap by identifying and predicting current lean practices and assessing the strengths and weaknesses of LC implementation in Pakistan.

Design/methodology/approach

Using robust statistical methods to analyze 92 valid responses, the study reveals that approximately 54% of lean practices are currently in use in the construction industry of Pakistan, with a population mean ranging from 52.7% to 55.6%.

Findings

Surprisingly, the research identifies instances where some construction firms in Pakistan are implementing LC practices, even though they have only a limited understanding of its underlying principles. Notably, certain subprinciples, such as visual management, top management commitment to change, employee training, process cycle time reduction and production optimization, are less integrated within the construction industry. Exploring the possibility of implementing LC, recommendations for strategies to implement LC in Pakistan are suggested, aligning with the conceptual model proposed by the researchers.

Originality/value

The novelty of this work offers insights that can serve as a comprehensive guide for developing nations. It provides a structured approach to assess and benchmark LC practices, which, in turn, can contribute to a more efficient and effective construction industry. Moreover, the strategies proposed in this research can aid developing countries in the efficient implementation of LC. This will have a positive implication for both economic and developmental outcomes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Book part
Publication date: 29 November 2023

Abstract

Details

The Emerald Handbook of Research Management and Administration Around the World
Type: Book
ISBN: 978-1-80382-701-8

Content available

Abstract

Details

Sustainable Road Infrastructure Project Implementation in Developing Countries: An Integrated Model
Type: Book
ISBN: 978-1-83753-811-9

Open Access
Article
Publication date: 17 May 2022

Douglas Aghimien, Clinton Aigbavboa, Ayodeji Emmanuel Oke and John Aliu

Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the…

1496

Abstract

Purpose

Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the right people to drive the implementation of these technologies and attaining strategic organisational goals is essential. While most studies have focused on the use of emerging technologies in the construction industry, less attention has been given to the ‘people’ dimension. Therefore, this study aims to assess the people-related features needed for construction digitalisation.

Design/methodology/approach

The study adopted pragmatic thinking using a mixed-method approach. A Delphi was used to achieve the qualitative aspect of the research, while a questionnaire survey conducted among 222 construction professionals was used to achieve the quantitative aspect. The data gathered were analysed using frequency, percentage, mean item score, Kruskal–Wallis H test, exploratory factor analysis and confirmatory factor analysis.

Findings

Based on acceptable reliability, validity and model fit indices, the study found that the people-related factors needed for construction digitalisation can be grouped into technical capability of personnel, attracting and retaining digital talent and organisation’s digital culture.

Practical implications

The findings offer valuable benefits to construction organisations as understanding these identified people features can help lead to better deployment of digital tools and the attainment of the digital transformation.

Originality/value

This study attempts to fill the gap in the shortage of literature exploring the people dimension of construction digitalisation. The study offers an excellent theoretical backdrop for future works on digital talent for construction digitalisation, which has gained less attention in the current construction digitalisation discourse.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Book part
Publication date: 29 November 2023

Kris Monahan, Toni Shaklee and Deborah Zornes

In North America, the profession known as ‘research management’ elsewhere across the globe, is often known as ‘research administration’ and encompasses the activities and work…

Abstract

In North America, the profession known as ‘research management’ elsewhere across the globe, is often known as ‘research administration’ and encompasses the activities and work associated with developing, administering, accounting for and complying with sponsor requirements, guidelines, procedures, and laws relating to externally funded projects. In the United States and Canada, the expansion of respective federal government agencies and programmes was the major factor for the need and growth of the research administration profession. Initially, administrative and business staff often administered research funding, however over the decades, a fully-fledged profession has evolved with distinct specialisations. Both the United States and Canada now have maturing professions and professional societies to organise and advance research administration. This chapter outlines the chronological origins, growth, and professionalisation of research administration in North America, with a focus on the United States and Canada. Mexico has not yet evolved a formalised research administration infrastructure.

Details

The Emerald Handbook of Research Management and Administration Around the World
Type: Book
ISBN: 978-1-80382-701-8

Keywords

Open Access
Article
Publication date: 19 May 2022

Douglas Aghimien, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Nicholas Chileshe and Bhekinkosi Jabulani Dlamini

This paper presents the findings of assessing the strategies required for improved work-life balance (WLB) of construction workers in Eswatini. This was done to improve the…

2232

Abstract

Purpose

This paper presents the findings of assessing the strategies required for improved work-life balance (WLB) of construction workers in Eswatini. This was done to improve the work-life relationship of construction workers and, in turn, improve the service delivery of the construction industry in the country.

Design/methodology/approach

The study adopted a quantitative research approach using a questionnaire administered to construction professionals in the country. The data gathered were analysed using frequency, percentage, Mann–Whitney U test, exploratory and confirmatory factor analysis (CFA).

Findings

The findings revealed that the level of implementation of WLB initiatives in the Eswatini construction industry is still low. Following the attaining of several model fitness, the study found that the key strategies needed for effective WLB can be classified into four significant components, namely: (1) leave, (2) health and wellness, (3) work flexibility, and; (4) days off/shared work.

Practical implications

The findings offer valuable benefits to construction participants as the adoption of the identified critical strategies can lead to the fulfilment of WLB of the construction workforce and by extension, the construction industry can benefit from better job performance.

Originality/value

This study is the first to assess the strategies needed for improved WLB of construction workers in Eswatini. Furthermore, the study offers a theoretical platform for future discourse on WLB in Eswatini, a country that has not gained significant attention in past WLB literature.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 1000