Search results
1 – 10 of 540This case deals with several types of uncertainties faced by project team in an oil company north east in India. These challenges and uncertainties are in the areas drawing…
Abstract
This case deals with several types of uncertainties faced by project team in an oil company north east in India. These challenges and uncertainties are in the areas drawing approval, supply chain, critical equipment availability, soll type, control room, soil type, employee availability, environmental clearances, safety and wildlife clearances. This project demonstrates the ownership issues, why it is difficult to complete a project on time in the Northeast of India or why public sector project gets delayed.
Details
Keywords
This case describes the challenges faced by Amul in organising dairy farmers into a co-operative and creating continuous opportunities for value addition. Participants in the case…
Abstract
This case describes the challenges faced by Amul in organising dairy farmers into a co-operative and creating continuous opportunities for value addition. Participants in the case discussion are required to review the developments in the organisation and recommend a strategy for the future.
Details
Keywords
Supply chain management.
Abstract
Subject area
Supply chain management.
Study level/applicability
The case is suitable for post graduates in management, and for those managing small sector supply and manufacturing systems.
Case overview
ACPL is an organisation which moved from trading to manufacturing a technology product instrument transformers (ITs) for power utility companies for 11 years, competing with the best in industry, reducing internal costs, and modernising the supply chain. ACPL was started as a trading organisation in electrical items in Delhi by Munish Kumar, an engineer by profession in 2001. In 2004 he ventured into manufacturing, which expanded in two locations in Ghaziabad, NCR Delhi. Later his two sons, engineer and management graduate, respectively, joined the organisation. In less than a decade, by 2007, ACPL had grown to be a private limited organisation. ACPL manufactures ITs required by power boards and companies for conversion and usage of high voltage (11 kV/33 kV) transmitted power into 220 V single phase/440 V three phase power. From tender/enquiry through manufacturing to inspection and despatch takes a long supply chain cycle time holding space as well as inventory. An interview with the chairman of ACPL in the case highlights issues affecting its margins and growth. The long process to delivery time may be in vogue in this type of industry but this holds up a huge inventory. The company management has been working to resolve this crisis along with an urgent need to grow in a competitive environment. The problem is being addressed.
Expected learning outcomes
This case study should help students to understand the concept of the supply chain and supply cycle, in a manufacturing company in particular. It has been found that students understand the supply chain as part of the marketing function dealing with finished stocks, warehousing and delivery to end customers as per agreements, and arranging payments from customers. The supply chain also deals with in bound materials management. Raw materials planning, purchasing, inventory management are crucial for effective business operations management in any organisation.
Supplementary materials
Teaching notes are available; please contact your librarian for access.
Details
Keywords
Thillai Rajan and Josephine Gemson
Infrastructure finance.
Abstract
Subject area
Infrastructure finance.
Study level/applicability
II MBA/Executive MBA (Project Finance, Infrastructure Finance).
Case overview
It is generally believed that the economy of India is on the threshold of achieving significant growth in the coming years. The availability of adequate infrastructure facility will play a key role in realizing this growth potential. To accelerate the process of creating infrastructure capacity, the Government of India has opened up many infrastructure sectors for private sector investment. Creation of international standard airport facilities is an important component of such new infrastructure creation. This case study presents the initial development and financing closure of Bengaluru International Airport Limited (BIAL), the first major private sector airport in India. In retrospect, it is generally felt that BIAL was an important milestone in the privatization of airports in India. The blueprint for the greenfield PPP airport in Hyderabad was closely modelled on the BIAL project. The experience gained in the development of BIAL also played a major role in subsequent brownfield PPP airport expansion projects in Mumbai and Delhi.
Expected learning outcomes
The goal of this case study is to illustrate the complexities that exist in the process of infrastructure development and financing. This following are the expected learning outcomes:
The importance of using an appropriate project structure.
The prevalence of early returns to project sponsors as compared to lenders.
The process of achieving financial closure.
Analyzing project risks and returns.
The importance of using an appropriate project structure.
The prevalence of early returns to project sponsors as compared to lenders.
The process of achieving financial closure.
Analyzing project risks and returns.
Supplementary materials
Teaching notes.
Details
Keywords
Miroslava Ivko Jordović Pavlović, Siniša Ranðić and Lidija Paunović
Management, Information technologies.
Abstract
Subject area
Management, Information technologies.
Study level/applicability
Courses at the senior university level in social and organizational sciences.
Case overview
This case aims to observe modes, levels and specific problems in application of information technologies in informing, information sharing and collaboration as important aspects in ensuring quality in control of the processes that occur at school. Some deficiencies in application of information technology within these processes have been identified and alternatives to solving them have been offered. The discussion concerning the solutions was performed according to the parameters that were singled out as important in the analysis of the problems. A school that is recognized in Zlatibor region and elsewhere in Serbia for its advanced development tendencies was selected for the case study. The proposed solutions are practically applicable in any work collective.
Expected learning outcomes
Modern management strategy in education; the importance of process management in insuring quality of whole management system; the importance of implementation of modern information technologies in school management system.
Supplementary materials
Teaching Notes are available for educators only. Please contact your library to gain login details or email support@emeraldinsight.com to request teaching notes.
Details
Keywords
Pauline Ang, A.K Siti-Nabiha and Lian-Kee Phua
Accounting and Finance (Performance Management and Management Control System).
Abstract
Subject area
Accounting and Finance (Performance Management and Management Control System).
Study level/applicability
Postgraduate Students in Business and Management.
Case overview
This is a case of SmartBay System Integrator (SSI), an IT infrastructure system integrator based in Malaysia, a company that was facing declining profit margins. SSI was reputed to be a well-established locally owned system integrators in the northern region of the country, and the services it provided included building IT systems with high-end servers, networking solutions and software applications. Apart from the urgent need to improve sales, SSI intended to reduce the number of one-off customers and resolve the issue of increasing customer complaints. The complaints given to the company by customers revolved around the sluggish response to customers' requests, including delays in quotations and proposals, constant rescheduling of meeting with customers as well as unfavorable perceptions regarding the competency of SSI engineers. This case requires the analysis of the structure and control systems adopted by SSI to determine whether they are appropriate for the nature of the business and have suitable systems in place to resolve the issue of customer complaints.
Expected learning outcomes
This case can be used to teach the use of control systems in managing human resource issues in the context of highly specialised technical professionals in small service firms. In addition, the case also illustrates the need to match an appropriate control system to a specific type of organisational structure. In addition, the case can be relied upon to teach the differences between the various types of organisational structures and the different forms of control systems.
Supplementary materials
Teaching notes are available for educators only. Please contact your library to gain login details or email support@emeraldinsight.com to request teaching notes.
Details
Keywords
This telecommunications international business case study is the second in a series (A, B and C) of Vodafone cases.
Abstract
Subject area
This telecommunications international business case study is the second in a series (A, B and C) of Vodafone cases.
Study level/applicability
This case is intended to be used in MBA graduate and undergraduate business courses in strategy, cross-cultural management and human resources.
Case overview
This case examined organizational structures and human resource operating strategies of Vodafone Egypt from 2002 until 2007. Vodafone’s business model, how Vodafone addressed the differences in national culture between Britain and Egypt and how Vodafone fostered adoption of the Vodafone corporate culture are the main themes of this case. Further, this case examined business issues, products, processes and people systems that challenged Vodafone to grow quickly from zero local operations in 1998 to 4,000 employees and national mobile coverage in 2007.
Expected learning outcomes
The students who have used this case in the author’s classes have gained a clearer understanding of how international managers often have to develop a change culture and structure as a catalyst for firm growth in emerging markets. Adaptation to the local culture may not be an option for fast growth technology firms and may be ill-suited to meet corporate objectives.
Supplementary materials
Teaching notes are available for educators only. Please contact your library to gain login details or email support@emeraldinsight.com to request teaching notes.
Subject code
CSS 5: International Business.
Details
Keywords
David Zamora and Juan Carlos Barahona
Management of Innovation and Technology/Management Information Systems.
Abstract
Subject area
Management of Innovation and Technology/Management Information Systems.
Study level/applicability
Information Systems.
Case overview
SER (Sugar, Energy & Rum) was a company belonging to the Grupo Pellas Corporation. The company operated in four countries, had six subsidiaries, employed more than 25,000 people, had more than 43,500 manzanas of sugarcane crops in Nicaragua alone and had global annual sales of more than US$400m. In 2008, due to the negative effects of the crisis on the company’s business model (increasing costs due to higher prices for fuel and decreasing income because of low international sugar prices), the company decided to implement a business intelligence (BI) system to optimize its processes to reduce costs and increase productivity. At that time, the company had more than 100 years of data, information systems that fed into their main business processes and a culture that appreciated data as the basis for decision-making. However, there were inconsistencies among data systems, users received highly complex reports in Excel or green screens and process monitoring happened long after the tasks had been completed. As a response, SER used extract–transform–load to collect and clean data that would be used in the BI system (the case leaves the questions regarding the systems selection unsolved for discussion). Based on their business model, they selected the most critical processes and defined key performance indicators to measure the impact of changes in those processes. They considered graphic design as a tool to make the system more accepted by users and worked together with users so that reports only offered the most important information. The result was improved costs and productivity. They decreased manual time spent by 14 per cent, automated time spent by 10 per cent, and eliminated 1,556 hours of dead time for equipment in the field, which allowed them to increase productivity by US$1m just in sugar. They saved 20,000 trips from the fields to the factories, which represented more than US$1m in savings by monitoring the weight of wagons loaded with sugarcane in real time. They improved client perceptions about the company both locally and internationally by implementing a sugar traceability system.
Expected learning outcomes
The case “Business Intelligence at the Grupo Pellas SER Company” has as its objective to respond to the question: How does a company make its BI system implementation successful? As such, the case: Discusses what a BI system is and what it provides to a business analyses challenges, benefits and context when implementing a BI system; analyses success factors and recommendations in the BI system implementation process; analyses the process of implementing a BI and highlights the importance of the system priority questions and technological alternatives.
Supplementary materials
Teaching notes are available for educators only. Please contact your library to gain login details or email support@emeraldinsight.com to request teaching notes.
Subject code
CSS 11: Strategy
Details
Keywords
Abstract
Subject area
Strategic Management.
Study level/applicability
The case is designed for a) MBA students b) Short-duration executive MBA courses.
Case overview
The case refers to India’s leading steel company Tata Steel. Tata Tiscon, the steel rebar brand, is the organization’s leading retail brand. The case chronicles the period between the birth of the retail brand in the year 2000, its dramatic rise and dominance, to the end of 2013 when some of its initiatives had failed. Tata Tiscon was established as a pan Indian brand on the dint of a distribution network comprising 33 distributors and over 2000 retailers, many of them exclusive to the brand. The brand spawned a series of innovation in the category like “selling by piece”, fixed price concept and “free” home delivery. Together with its channel partners, the company achieved dramatic success which was reflected in its leading market share coupled with significant price premium in a category where price had traditionally being the only selling pitch. After 2010, the company saw an emerging challenge in the form of a new business model, where some companies were gearing to provide the complete portfolio of construction material including cement, steel, etc., and a turnkey construction solution for house builders. Tata Tiscon responded by attempting to enter the service space by launching a building design solution and later a construction supervision solution. Both of these initiatives failed. The protagonist of the case is Mr Keshav Viswanath (Chief of Marketing for retail business at Tata Steel), who is concerned with the failures of these key initiatives and is wondering how to ensure the “leader” status of Tata Tiscon in coming years.
Expected earning outcomes
The students are expected to understand how a core strategy like differentiation is implemented successfully in “practice”; understand the exploitation–exploration dichotomy in an organization; appreciate difference between radical innovation (based on new organizational routines, new business partners and new relationships) and incremental innovation based on fine tuning of existing organizational routines and relationships.
Supplementary materials
Rebar production: www.youtube.com/watch?v=J6n9sci8j-8; Tata TISCON AV: www.youtube.com/watch?v=89kOUsbnaYQ; TQM – The Toyota Way: www.youstube.com/watch?v=qf3gdrIMxRw; Disruptive vs. Incremental Innovation: www.youtube.com/watch?v=kOOL_GiaLTo; Approach to innovation is dead wrong: www.youtube.com/watch?v=pii8tTx1UYM
Subject code
CSS 11: Strategy.
Details
Keywords
Jacob A. Massoud and Christopher Leeds
Entrepreneurship.
Abstract
Subject area
Entrepreneurship.
Level/applicability
The portable solar cooker case is appropriate for upper division undergraduate and graduate students in entrepreneurship, international, strategy or sustainability courses.
Case overview
xCRUZA, a small industrial design studio in Buenos Aires, Argentina, has experienced limited success and expansion since the company was founded in 2005. Focusing on eco design principles, xCRUZA has maintained an eclectic design mix pertaining to product development in children's toys, medicine, and cleaning products. Challenged by a struggling Argentine economy, a population not focused on environmental concerns, and a general lack of capital availability, the founders of xCRUZA chose to design, develop, market and sell a portable solar cooker. The cooker was originally designed by two of the founders while studying engineering at university. While innovative and award winning in design, xCRUZA's solar cooker has proven to be a challenge to the founders' success both in getting their product to market and fulfilling the mission of the studio.
Expected learning outcomes
The learning objectives for the case include: to explore the challenges of an entrepreneurial start-up dedicated to eco design and sustainability principles, to examine market opportunities and consider approaches to selling in dissimilar markets, generate a discussion on strategies that xCRUZA has and can employ, to analyze the mission and direction of xCRUZA. Are they on the right track?
Supplementary materials
Teaching notes are available for educators only. Please contact your library to gain login details or email support@emeraldinsight.com to request teaching notes.
Details