Search results

1 – 10 of over 250000
Article
Publication date: 12 September 2010

Biman Das, Jesus M. Sanchez‐Rivas, Alberto Garcia‐Diaz and Corinne A. MacDonald

The purpose of this paper is to develop a computer simulation model to evaluate the bowl phenomenon and the allocation at the end of the line of stations with either greater mean…

1169

Abstract

Purpose

The purpose of this paper is to develop a computer simulation model to evaluate the bowl phenomenon and the allocation at the end of the line of stations with either greater mean operation times or higher variability of operation times.

Design/methodology/approach

The model was developed on the basis of a realistic case problem and applied to a six‐station assembly line. The evaluation criteria were the: minimization of the total elapsed time; maximization of the average percentage of working time; and minimization of the average time in the system.

Findings

The performance of an assembly line with independently normally distributed operation times could be improved by applying the bowl phenomenon. The allocation of large operation mean times to stations located near the end of the line did not produce improved results. Instead a more balanced allocation proved to be more significantly effective. On the other hand, the assignment of larger variability of operation times to the stations near the end of the line improved the performance of the assembly line.

Originality/value

The investigation contributed to the computer simulation approach to solving assembly line problems that dealt with the impact of normally distributed operation times on the bowl phenomenon and assembly lines with increasing mean operation times and higher variability of operation times at the end of the line of stations.

Details

Journal of Manufacturing Technology Management, vol. 21 no. 7
Type: Research Article
ISSN: 1741-038X

Keywords

Article
Publication date: 1 March 2003

Fahad Al‐Mubarak, Basheer M. Khumawala and Cem Canel

This paper is aimed at comparing cellular manufacturing with focused cellular manufacturing. We define focused cellular manufacturing as a layout scheme that groups components by…

2019

Abstract

This paper is aimed at comparing cellular manufacturing with focused cellular manufacturing. We define focused cellular manufacturing as a layout scheme that groups components by end‐items and forms cells of machines to fabricate and assemble end‐items. It is not classified as a cellular manufacturing layout since it does not attempt to take advantage of process similarities. It also is not classified as a flow shop since there are no machines dedicated to individual operations and the machines are not arranged in a series. In addition, this research includes batching and assemble times in its criteria which few researchers in this area have done. The results indicate that the focused cellular manufacturing scheme has a batching advantage. This advantage out‐weighed the set‐up time reduction advantage of the cellular manufacturing scheme for average end‐item completion times and average work‐in‐process inventory levels. The cellular manufacturing scheme overcame the batching advantage only when there were small batch sizes or large set‐up time magnitudes.

Details

International Journal of Operations & Production Management, vol. 23 no. 3
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 1 February 1990

Gordon Wills, Sherril H. Kennedy, John Cheese and Angela Rushton

To achieve a full understanding of the role ofmarketing from plan to profit requires a knowledgeof the basic building blocks. This textbookintroduces the key concepts in the art…

16153

Abstract

To achieve a full understanding of the role of marketing from plan to profit requires a knowledge of the basic building blocks. This textbook introduces the key concepts in the art or science of marketing to practising managers. Understanding your customers and consumers, the 4 Ps (Product, Place, Price and Promotion) provides the basic tools for effective marketing. Deploying your resources and informing your managerial decision making is dealt with in Unit VII introducing marketing intelligence, competition, budgeting and organisational issues. The logical conclusion of this effort is achieving sales and the particular techniques involved are explored in the final section.

Details

Management Decision, vol. 28 no. 2
Type: Research Article
ISSN: 0025-1747

Keywords

Open Access
Article
Publication date: 19 June 2023

Fang Wen, Yun Bai, Xin Zhang, Yao Chen and Ninghai Li

This study aims to improve the passenger accessibility of passenger demands in the end-of-operation period.

Abstract

Purpose

This study aims to improve the passenger accessibility of passenger demands in the end-of-operation period.

Design/methodology/approach

A mixed integer nonlinear programming model for last train timetable optimization of the metro was proposed considering the constraints such as the maximum headway, the minimum headway and the latest end-of-operation time. The objective of the model is to maximize the number of reachable passengers in the end-of-operation period. A solution method based on a preset train service is proposed, which significantly reduces the variables of deciding train services in the original model and reformulates it into a mixed integer linear programming model.

Findings

The results of the case study of Wuhan Metro show that the solution method can obtain high-quality solutions in a shorter time; and the shorter the time interval of passenger flow data, the more obvious the advantage of solution speed; after optimization, the number of passengers reaching the destination among the passengers who need to take the last train during the end-of-operation period can be increased by 10%.

Originality/value

Existing research results only consider the passengers who take the last train. Compared with previous research, considering the overall passenger demand during the end-of-operation period can make more passengers arrive at their destination. Appropriately delaying the end-of-operation time can increase the proportion of passengers who can reach the destination in the metro network, but due to the decrease in passenger demand, postponing the end-of-operation time has a bottleneck in increasing the proportion of passengers who can reach the destination.

Article
Publication date: 1 August 2005

Hong Zhang and C.M. Tam

This paper proposes introducing how to consider the break which cyclically happens and has nothing to do with resource availabilities in modeling of a construction process through…

2040

Abstract

Purpose

This paper proposes introducing how to consider the break which cyclically happens and has nothing to do with resource availabilities in modeling of a construction process through an activity‐based simulation.

Design/methodology/approach

In consideration of the variable break‐frequency and break‐duration for different activities, concepts of time‐cycle and time‐window are discussed. Then an algorithm to determine the execution of the activities facing the cyclical break is proposed, in which pre‐emption or non‐pre‐emption cases and overtime are taken into account together. This algorithm is incorporated into an activity‐based simulation so that the improved construction simulation is able to consider the cyclical break and model the construction process more reasonably. Computational analyses are presented to address the effectiveness of the improved activity‐based simulation.

Findings

The computational analyses demonstrate that the improved activity‐based simulation can consider the cyclical break in modeling a construction process, which cannot be achieved by the traditional simulation tools, especially when non‐pre‐emptive activities are concerned. It is also shown that the overtime use for the non‐pre‐emptive activities can lead to reduction of the project duration when the cyclical break is considered.

Originality/value

The proposed simulation‐based methodology is an alternative means to deal with the cyclical break that is destined for some activities and irrelevant to resource availabilities in modeling of a construction process.

Details

Engineering, Construction and Architectural Management, vol. 12 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Abstract

Details

City Logistics
Type: Book
ISBN: 978-0-08-043903-7

Article
Publication date: 4 April 2008

Sami Habib and Maytham Safar

The purpose of this paper is to propose a four‐level hierarchy model for multimedia documents representation to be used during the dynamic scheduling and altering of multimedia…

Abstract

Purpose

The purpose of this paper is to propose a four‐level hierarchy model for multimedia documents representation to be used during the dynamic scheduling and altering of multimedia contents.

Design/methodology/approach

The four‐level hierarchy model (object, operation, timing, and precedence), offers a fine‐grain representation of multimedia contents and is embedded within a research tool, which is called WEBCAP. WEBCAP utilizes the four‐level hierarchy to synchronize the retrieval of objects in the multimedia document employing Allen's temporal relations, and then applies the Bellman‐Ford's algorithm on the precedence graph to schedule all operations (fetch, transmit, process, and render), while satisfying the in‐time updating and all web workload's resources constraints.

Findings

The experimental results demonstrate the effectiveness of the model in scheduling the periodical updating multimedia documents while considering a variety of workloads on web/TCP.

Research limitations/implications

WEBCAP should be enhanced to automatically measure and/or approximate the available bandwidth of the system using sophisticated measurement of end‐to‐end connectivity. In addition, WEBCAP should be expanded and enhanced to examine system infrastructure for more real‐time applications, such as tele‐medicine and e‐learning.

Practical implications

WEBCAP can be used as an XML markup language for describing multimedia presentations. It can be used to create online presentations similar to PowerPoint on desktop environment, or used as an interactive e‐learning tool. An HTML browser may use a WEBCAP plug‐in to display a WEBCAP document embedded in an HTML/XML page.

Originality/value

This paper proposed a dynamic scheduling of multimedia documents with frequent updates taking into consideration the network's workload to reduce the packet lost ratio in the TCP flow, especially in the early stages. WEBCAP can be used to guide distributed systems designers/managers to schedule or tune their resources for optimal or near optimal performance, subject to minimizing the cost of document retrieval while satisfying the in time constraints.

Details

International Journal of Web Information Systems, vol. 4 no. 1
Type: Research Article
ISSN: 1744-0084

Keywords

Article
Publication date: 1 December 2004

Hong Zhang, Heng Li and C.M. Tam

Construction‐oriented discrete‐event simulation often faces the problem of defining uncertain information input, such as subjectivity in selecting probability distributions that…

1463

Abstract

Construction‐oriented discrete‐event simulation often faces the problem of defining uncertain information input, such as subjectivity in selecting probability distributions that result from insufficient or lack of site productivity data. This paper proposes incorporation of fuzzy set theory with discrete‐event simulation to handle the vagueness, imprecision and subjectivity in the estimation of activity duration, especially when insufficient or no sample data are available. Based upon an improved activity scanning simulation algorithm, a fuzzy distance ranking measure is adopted in fuzzy simulation time advancement and event selection for simulation experimentation. The uses of the fuzzy activity duration and the probability distribution‐modeled duration are compared through a series of simulation experiments. It is observed that the fuzzy simulation outputs are arrived at through only one cycle of fuzzy discrete‐event simulation, still they contain all the statistical information that are produced through multiple cycles of simulation experiments when the probability distribution approach is adopted.

Details

Engineering, Construction and Architectural Management, vol. 11 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 August 2016

Chin-Fu Kuo, Yung-Feng Lu and Bao-Rong Chang

The purpose of this paper is to investigate the scheduling problem of real-time jobs executing on a DVS processor. The jobs must complete their executions by their deadlines and…

Abstract

Purpose

The purpose of this paper is to investigate the scheduling problem of real-time jobs executing on a DVS processor. The jobs must complete their executions by their deadlines and the energy consumption also must be minimized.

Design/methodology/approach

The two-phase energy-efficient scheduling algorithm is proposed to solve the scheduling problem for real-time jobs. In the off-line phase, the maximum instantaneous total density and instantaneous total density (ITD) are proposed to derive the speed of the processor for each time instance. The derived speeds are saved for run time. In the on-line phase, the authors set the processor speed according to the derived speeds and set a timer to expire at the corresponding end time instance of the used speed.

Findings

When the DVS processor executes a job at a proper speed, the energy consumption of the system can be minimized.

Research limitations/implications

This paper does not consider jobs with precedence constraints. It can be explored in the further work.

Practical implications

The experimental results of the proposed schemes are presented to show the effectiveness.

Originality/value

The experimental results show that the proposed scheduling algorithm, ITD, can achieve energy saving and make the processor fully utilized.

Details

Engineering Computations, vol. 33 no. 6
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 1 February 2013

Juha‐Matti Lehtonen, Paulus Torkki, Antti Peltokorpi and Teemu Moilanen

Previous studies approach surgery scheduling mainly from the mathematical modeling perspective which is often hard to apply in a practical environment. The aim of this study is to…

Abstract

Purpose

Previous studies approach surgery scheduling mainly from the mathematical modeling perspective which is often hard to apply in a practical environment. The aim of this study is to develop a practical scheduling system that considers the advantages of both surgery categorization and newsvendor model to surgery scheduling.

Design/methodology/approach

The research was carried out in a Finnish orthopaedic specialist centre that performs only joint replacement surgery. Four surgery categorization scenarios were defined and their productivity analyzed by simulation and newsvendor model.

Findings

Detailed analyses of surgery durations and the use of more accurate case categories and their combinations in scheduling improved OR productivity 11.3 percent when compared to the base case. Planning to have one OR team to work longer led to remarkable decrease in scheduling inefficiency.

Practical implications

In surgical services, productivity and cost‐efficiency can be improved by utilizing historical data in case scheduling and by increasing flexibility in personnel management.

Originality/value

The study increases the understanding of practical scheduling methods used to improve efficiency in surgical services.

Details

International Journal of Health Care Quality Assurance, vol. 26 no. 2
Type: Research Article
ISSN: 0952-6862

Keywords

1 – 10 of over 250000