Article
Publication date: 22 January 2021

Patrick Manu, Richard Ohene Asiedu, Abdul-Majeed Mahamadu, Paul Olaniyi Olomolaiye, Colin Booth, Emmanuel Manu, Saheed Ajayi and Kofi Agyekum

Effective procurement of infrastructure is linked to the attainment of the sustainable development goals set by the United Nations. While the capacity of organisations is…

Abstract

Purpose

Effective procurement of infrastructure is linked to the attainment of the sustainable development goals set by the United Nations. While the capacity of organisations is generally thought to be related to organisational performance, there is a lack of empirical insights concerning the contribution of procurement capacity of public organisations towards the attainment of procurement objectives in infrastructure procurement. Thus, it is unclear which aspects of the capacity of public procurement organisations contribute the most to the attainment of procurement objectives in the procurement of infrastructure. This research sought to address this gap.

Design/methodology/approach

The research used a survey of public procurement professionals which yielded 590 responses.

Findings

Exploratory factor analysis of 23 organisational capacity items revealed three components of organisational procurement capacity: “management of the procurement process”; “human and physical resources”; and “financial resources and management”. Multiple regression modelling of the relationship between the components and the attainment of 12 procurement objectives further reveals that there is a significant positive relationship between the three components and all the objectives. However, “management of the procurement process” emerged as the greatest contributor to the attainment of seven objectives, whereas “human and physical resources”, and “financial resources and management” were the greatest contributor to the attainment of one objective and four objectives, respectively.

Originality/value

The study provides strong empirical justification for investment in the development of procurement capacity of public agencies involved in procurement of infrastructure. Furthermore, procurement capacity development of specific capacity components can be prioritised based on the relative contribution of capacity components to the attainment of desired procurement objectives. This should be useful to government policymakers as well as multilateral organisations that fund infrastructure and procurement reforms in various countries.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2019

Abdul-Majeed Mahamadu, Lamine Mahdjoubi, Colin Booth, Patrick Manu and Emmanuel Manu

In spite of emerging research on building information modelling (BIM) capability assessment, there is a general dearth of knowledge about the links between often pre-emptive…

1303

Abstract

Purpose

In spite of emerging research on building information modelling (BIM) capability assessment, there is a general dearth of knowledge about the links between often pre-emptive capability measurement attributes and actual delivery success. More so, current studies have not considered success from the wider construction supply chain (CSC) perspective. So far, the perceived importance of capability metrics is not based on post-project evaluations of their contribution to BIM delivery success. This paper aims to identify relevant BIM capability attributes used for qualifying CSC organisations for projects and further aims to investigate their relative importance and influence on some key aspects of BIM delivery success.

Design/methodology/approach

Based on heretofore validated set of BIM capability attributes from semi-structured interviews and a Delphi study, a survey of CSC firms on BIM-enabled projects was used to model the influence of BIM capability attributes on BIM delivery success. Multiple regression modelling was performed to ascertain the nature of the relationship between BIM capability attributes and the key aspects of BIM delivery success as identified from the literature.

Findings

BIM staff experience and the suitability of proposed methodology prior to project commencement were identified as the most influential on BIM delivery quality, as well as delivery within schedule and on budget. Conversely, the administrative and strategic-level capacities were found as the most influential in leveraging collaboration, coordination or integration of the CSC on projects through BIM.

Originality/value

This study provides a step change in prioritising BIM capability criteria based on evidence of their contribution to delivery success in key performance areas, rather than their perceived importance as capability metrics as widely practised.

Details

Construction Innovation, vol. 19 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 31 March 2021

Collins Ameyaw, Blondel Akun Abaitey, Sarfo Mensah and Emmanuel Manu

The purpose of this study was to determine the transaction cost (TC) contractors incur when tendering for a project as well as establish a correlation between the TC of tender and…

Abstract

Purpose

The purpose of this study was to determine the transaction cost (TC) contractors incur when tendering for a project as well as establish a correlation between the TC of tender and tender amount of projects procured through the national competitive bidding procurement method.

Design/methodology/approach

The research draws extensively documentary analysis, observation and interviews to collect cost data on 14 different tenders submitted by a D1/K1 contractor. Using TC theory, the data are analyzed and the actual cost is determined. Further, Spearman rank correlation is employed to establish a relationship between tender price (TP) and the cost of tender by the aid of Statistical Package for Social Sciences.

Findings

The research developed a tender preparation conceptual framework highlighting the components of TC in competitive tendering in Ghana and also revealed that, apart from the emotional and psychological costs, contractors in Ghana incur approximately Gh₵ 4,625 (US$ 925)–Gh₵ 2,520 (US$ 504) to prepare and submit a competitive tender. In relation to the tender figure, the TC of tender in Ghana ranges from 0.05% to 0.65% and an average of 0.33%. Also, there is an inverse correlation between TP and the percentage cost of tender.

Research limitations/implications

The research relied on 14 competitive tenders and also limited to public sector works. Findings from the study should therefore be applied with caution.

Originality/value

This study is the only known research that has focused on assessing the TC of public sector competitive tendering from a contractor's perspective and within a developing sub-Saharan African context.

Details

Built Environment Project and Asset Management, vol. 11 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 6 June 2017

Saad Sarhan, Christine Pasquire, Emmanuel Manu and Andrew King

The construction industry has been subject to substantial criticism for its short-term “hit-and-run” relationships which are focussed on win-lose situations. Despite the wide…

1107

Abstract

Purpose

The construction industry has been subject to substantial criticism for its short-term “hit-and-run” relationships which are focussed on win-lose situations. Despite the wide recognition of these problems the industry persistently resists the radical demanded of it. Therefore, the purpose of this paper is twofold. First, to investigate why this might be the case by reviewing the governance problem confronting clients and decision makers in construction procurement, as conceptualised in transaction cost economics (TCE). Second, to critically analyse and question the efficiency and effectiveness of various safeguarding approaches, which are taken for granted and commonly practiced in construction, from a lean perspective.

Design/methodology/approach

The analysis of this paper is based on an in-depth critical review of 76 construction procurement and contractual-related articles, ranging from 1994 to 2016, using theories of Lean construction and TCE as an analytical lens.

Findings

Findings reveal that clients and decision makers often tend to safeguard their project-specific assets, against opportunism and exploitation, through the deployment of formal contractual arrangements and governance structures. These arrangements and structures typically dominate the management of the project delivery often to the detriment of the project itself; but because there is a belief that interests are safeguarded, clients and decision makers feel they have taken the best course of action. This goes a long way to explaining the coherence of the current construction model.

Research limitations/implications

To the best of the authors’ knowledge, this paper is the first to demonstrate the usefulness of using principles of Lean construction in association with TCE when analysing construction-procurement-related issues. In particular, the use of a “lean” lens helps to expose the impact of procurement governance arrangements on process flow. The study also provides a potential research agenda that can lead to the development of prescriptive conceptual frameworks for causal analysis of institutionalised waste in construction.

Practical implications

The paper attempts to expose to clients and decision makers the amount of waste (and unnecessary cost) they embed by adhering to prevailing unfit-for-purpose contractual governance approaches. It also helps decision makers to consider alternative procurement arrangements and organisational techniques that could be of value and support collaborative ways of working.

Originality/value

The study contributes to the overall understanding of waste in construction by providing insight into various imperfect procurement and contractual arrangements, which are taken for granted and impede efficiency and improvement efforts in construction. The findings presented provide a theoretical anchor and rationale for developing alternative approaches to the design and delivery of capital projects.

Details

International Journal of Managing Projects in Business, vol. 10 no. 3
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 4 January 2022

Sa’id Namadi Ahmed, Christine Pasquire and Emmanuel Manu

Extensive research on the importance of collaborative working (CW) and aligning stakeholders’ interests in construction has been widely conducted. But often the practice of…

Abstract

Purpose

Extensive research on the importance of collaborative working (CW) and aligning stakeholders’ interests in construction has been widely conducted. But often the practice of commercial actors during CW has often been overlooked, particularly within the UK setting, where scholars have lamented on the lack of industry-wide collaboration. This study aims to explore the factors affecting commercial actors in CW, specific to the UK construction industry.

Design/methodology/approach

The research used a context-based approach to seek stakeholders’ perspectives on the key factors affecting commercial actors in CW within the UK. Semi-structured interviews with individuals (contractors, cost consultants, designers among others) from construction and infrastructure organisations were conducted, using multiple case study investigations. The collected data was analysed using a case study approach, and principles of inductive thematic analysis to identify the key factors.

Findings

Findings from the analysis identified “institutional” factors such as transactional cost economic influence, the prevailing construction model influence and professional related drivers. Key drivers within these factors include commercial background and training, custom and practice, misaligned interests in projects, clients’ perception of consultants, cost-driven environment, conventional procurement protocols and bureaucratic functions.

Originality/value

In conclusion, these factors continue to affect CW with undue influence on commercial actors in the UK, thus preventing performance improvement demanded by successive UK Government reports. The context-based approach applied in this study is expected to provide some insight in construction management research, especially from a commercial perspective in the UK, to gain an understanding of how these factors are manifesting.

Details

Journal of Financial Management of Property and Construction , vol. 27 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 24 February 2021

Samuel Gyedu, Heng Tang, Albert Henry Ntarmah and Emmanuel Kwaku Manu

This study has dealt with the gap in the literature, by probing the influence of innovation capability on business performance. This paper aims to test the moderation role of…

Abstract

Purpose

This study has dealt with the gap in the literature, by probing the influence of innovation capability on business performance. This paper aims to test the moderation role of technological turbulence (TT) and market turbulence (MT) on the relationship between innovation capability (IC) and business performance (BP).

Design/methodology/approach

The study used a quantitative survey and a sample size of 579 departmental heads. Branch managers and permanent staff from the Greater Accra, Ashanti and Western Region in the Ghana telecommunication sector. The obtained data was analysed through the STATA 15.0 and AMOS statistical software package.

Findings

The empirical results from multiple linear regressions revealed that product/service innovation, process innovation, marketing innovation and administrative innovation had positive effects on business performance. The outcome of the moderation analysis further shown that technological turbulence positively moderates the relationship that existed between the various constructs of innovation capability and business performance indicating that technological turbulence significantly strengthens the relationship between these variables. On the contrary, market turbulence significantly weakens the relationship between the various innovation capability constructs and business performance.

Research limitations/implications

Although this research has made significant contributions to both theory and practice, there are certainly some limitations and future research directions that need to be considered to appropriately position the study findings. Firstly, because of the limited sample size (579), further testing of these constructs needs to be carried out in future research using alternative data. Related to this, it would be prudent if the instruments and models developed in this research were tested in different industry contexts. Also, because the Ghana telecommunication sector is made up of foreign companies, comparative research could be conducted to compare the IC and performance of Ghana and the other countries where these companies operate. Indeed, analyses of IC and BP associated with the same companies in different countries may prove to be very beneficial in the global context. Secondly, this research used only TT and MT to test the moderating effect of ET on the association of IC with BP. Future research can include competition intensity which may change or confirm the outcome of these studies. Thirdly, only qualitative data were used for the measurement of IC and the level of BP. Therefore, future research could use quantitative or both qualitative and quantitative data to confirm if there will be significant differences in the results obtained.

Practical implications

Literature has examined the moderation effect of ET on different variables and relationships in different organizational settings. This study has tried to analyse the moderating effect of ET on the relationship of IC with BP. The outcomes of this study are similar to the previous research studies mentioned above, however, limited studies have been conducted on IC and its relationship with BP in the context of ET especially in the most vibrant sector of Ghana’s economy. These findings are very innovative and contribute enormously to literature and knowledge by indicating which moderating ET positively and significantly strengthens and the type which weakens the existing relationship between IC and BP within the Ghanaian telecommunication sector which no researcher has conducted. These findings will go a long way by aiding the players in this sector to tauten their IC wings to achieve resilient performance around the globe.

Social implications

This will also contribute to the growth of Ghana’s economy as sources of revenue and employment. Additionally, the results obtained from this study will prompt managers to make more informed and effective decisions regarding innovation activities and the environments in which they operate.

Originality/value

This paper adds knowledge and literature to the existing ones. It is a new development in the research field of Ghana. This is the first journal this study has been submitted.

Details

International Journal of Innovation Science, vol. 13 no. 4
Type: Research Article
ISSN: 1757-2223

Keywords

Article
Publication date: 8 July 2020

Emmanuel Adinyira, Patrick Manu, Kofi Agyekum, Abdul-Majeed Mahamadu and Paul Olaniyi Olomolaiye

Work on construction sites involves individuals with diverse character, temperament,age, physical strength, culture, religion and experience level. A good number of these…

Abstract

Purpose

Work on construction sites involves individuals with diverse character, temperament,age, physical strength, culture, religion and experience level. A good number of these individuals are also alleged to involve themselves in substance and alcohol abuse due to the physically demanding nature of their work. These could promote the prevalence of violence on construction sites which could in turn affect safety on construction sites. However, there is a lack of empirical insight into the effect of violent behaviour and unsafe behaviour on construction sites. This study therefore pioneers an empirical inquiry into the relationship between violent behaviour and unsafe behaviour on construction sites.

Design/methodology/approach

Seventeen violent behaviours and 15 unsafe behaviours were measured on 12 construction sites among 305 respondents using a structured questionnaire. A total of 207 valid questionnaire responses were collected from site workers. Partial least square–structural equation modelling (PLS-SEM) technique was used to examine the relationship between violent behaviour and unsafe behaviour.

Findings

The results indicate that there is a significant positive relationship between violent behaviour and unsafe behaviour on construction sites.

Originality/value

The findings from this study provide valuable insight into a less investigated dimension of the problem of construction site safety management. A focus on attitudinal issues such as how workers relate toward others and toward self should be an important consideration in safety improvement interventions on construction sites.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 April 2022

Andrew Ebekozien, Mohamad Shaharudin Samsurijan, Clinton Aigbavboa, Emmanuel Omoniyi Awe, Godpower C. Amadi and Faith Ebekozien Emuchay

Procurement management in infrastructure development has gained considerable attention in developing countries. It is because of the success in the developed nations. Studies have…

Abstract

Purpose

Procurement management in infrastructure development has gained considerable attention in developing countries. It is because of the success in the developed nations. Studies have shown that Nigeria's infrastructure development needs far exceed its current provision. Also, studies are scarce to reveal whether procurement management has been successful in infrastructure development projects in Nigeria. Therefore, this paper investigated the root cause of the perceived encumbrances impeding procurement management in infrastructure development projects and proffered policy measures to improve future Nigeria's infrastructure development.

Design/methodology/approach

Data were collected via unexplored exploratory virtual interviews and selected cases from secondary sources. The engaged construction and engineering consultants have been involved in the procurement management of infrastructure projects in Nigeria. Thematic analysis was adopted to analyse the collected data.

Findings

The root causes of the pitfalls that emerged from the study include lack of competition and transparency, embezzlement and mismanagement of public funds, snail speed bureaucracy and bottleneck and lack of skills and knowledge. Others are collusion/bid-rigging/price-fixing/cartel formation, corruption, lack of professionalism, unbridled politicking, embezzlement and mismanagement of public funds, incompetence of tender boards, lack of patriotism to national service and lack of government organisations’ procurement capacity.

Research limitations/implications

This paper is restricted to unravelling the encumbrances in procurement management of Nigeria's infrastructure development projects. Future research is desirable to adopt a quantitative approach for more extensive coverage and validate findings from this paper.

Practical implications

The paper findings, including those learnt from each case study evaluated, would undoubtedly influence policymakers and construction and engineering practitioners on the key strategies to employ in implementing future procurement management in Nigeria's infrastructure development projects.

Originality/value

This paper would assist policymakers and other stakeholders desirous of improved infrastructure to focus their priorities in mitigating the identified root cause hindering procurement management in Nigeria's infrastructure management.

Details

Property Management, vol. 41 no. 1
Type: Research Article
ISSN: 0263-7472

Keywords

Article
Publication date: 19 August 2021

Emmanuel Adinyira, Kofi Agyekum, Patrick Manu, Abdul-Majeed Mahamadu and Paul Olomolaiye

Multilateral aid agencies generate most of their funds from taxpayers, and therefore, it is necessary to ensure that recipients or borrowers use the funds for the intended…

Abstract

Purpose

Multilateral aid agencies generate most of their funds from taxpayers, and therefore, it is necessary to ensure that recipients or borrowers use the funds for the intended purposes. The World Bank is one of the major multilateral aid agencies that fund infrastructure projects in developing countries. Like other multilateral aid agencies, the World Bank uses oversight instruments/auditing tools to manage procurement risk on their funded projects. However, empirical insight about the effectiveness of these auditing tools is limited. This paper aims to assess the effectiveness of one of such multilateral aid agencies’ auditing tools (i.e. World Bank’s procurement post review [PPR]) in procurement risk mitigation on funded projects in a developing country context.

Design/methodology/approach

The study is based on secondary data obtained from the World Bank PPR reports carried out in the 2014, 2015 and 2016 financial years. Five projects with the highest loan amounts and five with the lowest loan amounts for the three-year period were selected from the 24 active World Bank projects during the time of the study. A purposive sampling technique was used to select a representative sample from a list of contracts under the 10 projects.

Findings

The results of the analysis showed a clear decline in the number of both major and minor deviations over the three-year period while an increase in the number of contracts with “No Deviation”. The study therefore concludes that procurement risk experienced a decline amongst the World Bank projects in Ghana where post reviews were carried out on yearly basis.

Originality/value

The study identifies the need for more frequent PPR and makes a case for the need to investigate whether PPR is a superior auditing tool compared to the other tools.

Details

Journal of Financial Management of Property and Construction , vol. 27 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 12 May 2022

Emmanuel Asare, De-Graft Owusu-Manu, Joshua Ayarkwa, David John Edwards and I. Martek

The construction industry (CI) is a major contributor to the gross domestic product of most economies. Yet, the industry is characterized by poorly performing projects, plagued…

Abstract

Purpose

The construction industry (CI) is a major contributor to the gross domestic product of most economies. Yet, the industry is characterized by poorly performing projects, plagued with cost overruns, delays, with a relatively high-risk nature and marginal returns. Given that construction projects are financially dynamic, relying on highly fluctuating working capital and cash-flow requirements, there is an imperative need to understand the working capital management (WCM) of the CI. This study aims to review the extant literature on WCM in the CI to present a contemporary positional paper and engender a wider polemic debate on this crucial phenomenon.

Design/methodology/approach

A systematic literature review methodology is used, using Google Scholar as the literature database.

Findings

Despite the importance of this research theme, only 16 publications dedicated to the topic of WCM in the CI are identified. This is an important finding in itself and is indicative of hitherto scant research conducted. Other observations include the lack of experts examining the field, with no authors exploring the theme more than once. Subthemes of WCM are also scarce, with only the topic of the relationship between “WCM and profitability” been revisited and refined in literature; all other topics being cursory.

Originality/value

This study is among pioneering papers in developing economies that have taken stock of WCM in the CI. As a result, the conclusion of this paper is to call out the paucity of research in WCM and set a broad agenda for future research.

Details

Construction Innovation , vol. 23 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 67