Article
Publication date: 28 September 2021

Martin Evans, Peter Farrell, Emad Elbeltagi and Helen Dion

Built environment organisations face global challenges between business units, especially since the coronavirus pandemic (COVID-19) has profoundly disrupted the construction…

1441

Abstract

Purpose

Built environment organisations face global challenges between business units, especially since the coronavirus pandemic (COVID-19) has profoundly disrupted the construction industry worldwide, including the management of construction megaprojects (CMPs). This research aims to develop a competency framework, for global integrated delivery (GID) transformative initiatives and future of work (FOW) global initiatives, to manage integration between lean construction (LC) practices and integrated project delivery (IPD) on CMPs in contemporary multinational engineering organisations.

Design/methodology/approach

“Mixed research methods” involves a two-stage quantitative and qualitative research approach. In the context of CMPs, stage one consisted of a qualitative research methodology comprising a literature review to examine competencies, COVID-19 impacts, responses and key drivers (KDs) to integrate LeanIPD&GID; stage one outcomes propose a conceptualisation of LeanIPD&GID, a competency framework and future of work (FOW) global initiatives. Stage two involved an empirical questionnaire survey for a set of 30 KDs arranged into five-factor clusters (FCs), 226 respondents from 23 countries with an extensive cosmopolitan experience; analysis adopted structural equation modelling (SEM), descriptive and inferential statistics, percentage scoring analysis, principal component analysis (PCA) and eigenvalues.

Findings

In the context of CMPs, stage one outcomes delivered a conceptualisation of LeanIPD&GID, a proposed competency framework and FOW global initiatives. Stage two concluded that the most significant KDs are “collaboration in design, construction works and engineering management,” “coordination and planning of construction work,” “senior organisational management support,” “boosting implementation of LC, and integrating project delivery” and “earlier and precise 3D visualisation of designs”. building information modelling (BIM) adoption in the MENA region is higher than LC; the second is still taking its first steps, while IPD has little implementation. LeanBIM is slightly integrated, while LeanIPD integration is almost not present.

Originality/value

The research findings, conceptualised LeanIPD&GID principles, a proposed competency framework and FOW global initiatives, provided future research streams and directions; the study has provided a competency framework and FOW global initiatives for effective practical strategies for enhancing integration of LeanIPD&GID transformative initiatives on CMPs and will allow project key stakeholders to place emphasis on boosting LeanIPD&GID KDs.

Article
Publication date: 3 August 2021

Martin Evans, Peter Farrell, Emad Elbeltagi and Helen Dion

The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International…

1067

Abstract

Purpose

The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International businesses, multinational AEC organisations, technical professionals, project and portfolio management organisations face global connectivity challenges between business units, especially during the outbreak of novel coronavirus pandemic, to manage construction megaprojects (CMPs). That raises the need to manage global connectivity as a main strategic goal of global organisations. This paper aims to investigate barriers to integrating lean construction (LC) practices and integrated project delivery (IPD) on CMPs towards the global integrated delivery (GID) transformative initiatives and develop future of work (FOW) global initiatives in contemporary multinational AEC organisations.

Design/methodology/approach

A two-stage quantitative and qualitative research approach is adopted. The qualitative research methodology consists of a literature review to appraise barriers to integrating LeanIPD&GID on CMPs. Barriers are arranged into six-factor clusters (FCs), with a conceptualisation of LeanIPD&GID, GID strategy placements and FOW global initiatives with multiple validations. This analysis also involved semi-structured interviews and focus group techniques. Stage two consisted of an empirical questionnaire survey that shaped the foundation of analysis and findings of 230 respondents from 23 countries with extensive cosmopolitan experience in the construction of megaprojects. The survey examined a set of 28 barriers to integrating LeanIPD&GID on CMPs resulting from a detailed analysis of extant literature after validation. Descriptive and inferential statistical tests were exploited for data analysis, percentage scoring analysis, principal component analysis (PCA) and eigenvalues were used to elaborate on clustered factors.

Findings

The research conceptualised LeanIPD&GID principles and proposed GID strategy placements for LeanIPD&GID transformative initiatives and FOW global initiatives. It concluded that the most significant barriers to integration of LeanIPD&GID on CMPs are “lack of mandatory building information modelling (BIM) and LC industry standards and regulations by governments”, “lack of involvement and support of governments”, “high costs of BIM software licenses”, “resistance of industry to change from traditional working practices” and “high initial investment in staff training costs of BIM”. PCA revealed the most significant FCs are “education and knowledge-related barriers”, “project objectives-related barriers” and “attitude-related barriers”. Awareness of BIM in the Middle East and North Africa (MENA) region is higher than LC and LC awareness is higher than IPD knowledge. Whilst BIM adoption in the MENA region is higher than LC; the second is still taking its first steps, whilst IPD has little implementation. LeanBIM is slightly integrated, whilst LeanIPD integration is almost not present.

Originality/value

The research findings, conclusion and recommendation and proposed GID strategy placements for LeanIPD&GID transformative initiatives to integrating LeanIPD&GID on CMPs. This will allow project key stakeholders to place emphasis on tackling LeanIPD&GID barriers identified in this research and commence GID strategies. The study has provided effective practical strategies for enhancing the integration of LeanIPD&GID transformative initiatives on CMPs.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 14 March 2022

Ayman Mashali, Emad Elbeltagi, Ibrahim Motawa and Mohamed Elshikh

The construction industry is facing massive challenges due to the huge construction development, and stakeholder management (SM) practices, especially on megaprojects. The purpose…

1316

Abstract

Purpose

The construction industry is facing massive challenges due to the huge construction development, and stakeholder management (SM) practices, especially on megaprojects. The purpose of this paper is to investigate critical success factors (CSFs) encountered by key construction stakeholders to enhance SM practices on mega construction projects (MCPs).

Design/methodology/approach

A questionnaire survey is carried out among the most important construction companies in Qatar. Three steps are used to finalize and evaluate the questionnaire before proceeding with the full survey, validity, pretesting and pilot study. Quantitative data analysis was conducted using the Statistical Package for Social Science software.

Findings

This paper identifies the key factors contributing to improving SM performance in MCPs; none of these is uncommon, but here they come together in a more integrative way.

Research limitations/implications

The limitations related to this research are briefly outlined as follows: the research was carried out in the State of Qatar. So, the findings are limited to the Qatari construction industry. The construction industry in Qatar is different from other countries where public projects have the priority to develop the infrastructure of the country prior to the world cup competition. The scope of this research is limited to MCPs. The impact of low awareness and knowledge of SM is not considered. However, the study is still reasonable and fortunately suitable to evaluate SM in MCPs.

Practical implications

Identifying these factors is expected to assist project participants in MCPs in improving projects’ performance and completing construction within the predefined time and cost.

Originality/value

This study makes a significant contribution through identifying the CSFs that lead to develop efficient SM in MCPs. Moreover, the research findings are important for project stakeholders, organizations, contractors, engineers and local authorities who implement SM in MCPs. Moreover, it will enhance the application of SM practices in construction megaprojects and allow project key stakeholders to place emphasis on tackling the crucial challenges identified in this research.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 16 May 2016

Emad Elbeltagi, Mohammed Ammar, Haytham Sanad and Moustafa Kassab

Developing an optimized project schedule that considers all decision criteria represents a challenge for project managers. The purpose of this paper is to provide a…

1834

Abstract

Purpose

Developing an optimized project schedule that considers all decision criteria represents a challenge for project managers. The purpose of this paper is to provide a multi-objectives overall optimization model for project scheduling considering time, cost, resources, and cash flow. This development aims to overcome the limitations of optimizing each objective at once resulting of non-overall optimized schedule.

Design/methodology/approach

In this paper, a multi-objectives overall optimization model for project scheduling is developed using particle swarm optimization with a new evolutionary strategy based on the compromise solution of the Pareto-front. This model optimizes the most important decisions that affect a given project including: time, cost, resources, and cash flow. The study assumes each activity has different execution methods accompanied by different time, cost, cost distribution pattern, and multiple resource utilization schemes.

Findings

Applying the developed model to schedule a real-life case study project proves that the proposed model is valid in modeling real-life construction projects and gives important results for schedulers and project managers. The proposed model is expected to help construction managers and decision makers in successfully completing the project on time and reduced budget by utilizing the available information and resources.

Originality/value

The paper presented a novel model that has four main characteristics: it produces an optimized schedule considering time, cost, resources, and cash flow simultaneously; it incorporates a powerful particle swarm optimization technique to search for the optimum schedule; it applies multi-objectives optimization rather than single-objective and it uses a unique Pareto-compromise solution to drive the fitness calculations of the evolutionary process.

Details

Engineering, Construction and Architectural Management, vol. 23 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 May 2022

Nan Liu, Rui Zhou, Ruoyu Jin, Qing Xiao and Zhipeng Hu

The purpose of this paper is to summarize the research of construction conflict from 1991 to 2020 and propose research directions for future scholarly work. During the recent…

Abstract

Purpose

The purpose of this paper is to summarize the research of construction conflict from 1991 to 2020 and propose research directions for future scholarly work. During the recent decades, it is widely accepted that construction conflict is inevitable, and conflict management has become an important component of project management. However, few works were done to map the global study in this field, there is limited review that evaluates the current stage of construction conflict research.

Design/methodology/approach

This study adopted a holistic literature review approach that incorporates bibliometric search and scientometric analysis. A total of 698 bibliographic records from the Web of Science core collection database were collected for the scientometric analysis. CiteSpace5.7 was adopted for the science mapping purpose in this study.

Findings

Through co-authorship analysis, co-word analysis and co-citation analysis, influential scholars and journals are identified. Several research trends are highlighted according to the scientometric analyses of the construction conflict topics. For example, the application of simulation and algorithms to the study of construction conflict management systems.

Practical implications

Construction is a resource-intensive, multi-participant and multi-targeted industry. Conflicts always exist in the whole life cycle of construction projects, it is important for industry practitioners to be updated of the latest movement and progress of the academic research.

Originality/value

This study contributed to the body of knowledge in construction conflict and bridge the research gap in the thorough review of previous research work.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords