Search results
1 – 3 of 3Heather Keathley-Herring, Eileen Van Aken and Geert Letens
This study assesses performance measurement (PM) system implementation efforts across various organizational contexts and investigates which factors are critical to achieving…
Abstract
Purpose
This study assesses performance measurement (PM) system implementation efforts across various organizational contexts and investigates which factors are critical to achieving implementation success (IS).
Design/methodology/approach
An empirical field study was conducted to refine a framework of PM system IS that consists of 5 dimensions of success and 29 factors. A survey questionnaire was used to investigate actual organizational practice and exploratory factor analysis was conducted to refine constructs corresponding to potential factors and dimensions of IS. The resulting variables were then investigated using multiple regression analysis to identify critical success factors for implementing PM systems.
Findings
The survey was completed by representatives from 124 organizations and the exploratory factor analysis results indicated that there are three underlying dimensions of IS (i.e. Use of the System, PM System Performance, and Improved Results and Processes) and 12 factors. Of the factors, nine can be considered critical success factors having a significant relationship with at least one dimension of IS: Leader Support, Design and Implementation Approach, Reward System Alignment, Organizational Acceptance, Organizational Culture and Climate, Easy to Define Environment, IT Infrastructure Capabilities, PM System Design Quality, and PM Participation and Training.
Originality/value
The results show that there are distinct dimensions of IS and, although some factors are associated with all dimensions, most are more closely related to only one dimension. This suggests that different strategies should be utilized based on the types of challenges experienced during implementation.
Details
Keywords
Manjeet Kharub, Himanshu Gupta, Sudhir Rana and Olivia McDermott
The study's goal was to identify the factors contributing to the practical completion of Kaizen events (KEs). The effect of the work-study man's characteristics, the supervisor's…
Abstract
Purpose
The study's goal was to identify the factors contributing to the practical completion of Kaizen events (KEs). The effect of the work-study man's characteristics, the supervisor's conduct and the autonomy of the Kaizen team are analysed in this study.
Design/methodology/approach
Data were collected from 249 respondents working in the manufacturing sector in India, mainly those who had been involved in Kaizen projects. Three-step procedures, namely, exploratory factor analysis, confirmatory factor analysis and partial least squares, have been applied to test the research hypotheses through structural equational modelling.
Findings
The exploratory factor analysis extracted in-role performance, creative performance and human aspect as latent variables explaining work-study man's performance (eigenvalue = 1). The study's findings indicate that the performance of work-study man (in-role, creative and human) and supervisors' conduct is directly related to the success of KEs. It was shown that supervisors might influence the outcomes of KEs only by moderating the human aspects. Additionally, the degree of autonomy of the Kaizen team was found having a significant positive relationship with the success of KEs.
Practical implications
The current study suggests that in-role and creative performance are prime assets of a work-study man. At the same time, the human aspect is a delicate issue that can affect the supervisor's behaviour. Therefore, the study implies that work-study men have the tactics and abilities to work with other co-workers to make a Kaizen project successful.
Originality/value
Although the significance of Kaizen projects has been widely emphasised, past research has failed to establish what factors contribute to the success of Kaizen efforts. Similarly, the supervisor's critical role has been highlighted several times. However, it is unclear how their conduct influences the relationship between work-study man's performance and the effectiveness of Kaizen projects. This study contributes significantly to organisational culture and human resource management by answering these questions.
Details
Keywords
Louisi Francis Moura, Edson Pinheiro de Lima, Fernando Deschamps, Dror Etzion and Sergio E. Gouvea da Costa
This conceptual paper presents a proposal for improving a performance measurement (PM) system implementation process based on enterprise engineering (EE) guidelines, which gives…
Abstract
Purpose
This conceptual paper presents a proposal for improving a performance measurement (PM) system implementation process based on enterprise engineering (EE) guidelines, which gives the process a sense of completeness.
Design/methodology/approach
This paper analyzes a well-known process for PM systems implementation organized in two phases: identifying, designing and implementing the top-level performance measures; and cascading the top-level measures and identify appropriate lower-level performance measures. The proposed improvements to the studied process derive from the EE guidelines, which establish a basis for the structure of an organizational management system, the formalization and synchronization of processes, performance expectations, exception handling and change management.
Findings
The study reveals that not all EE guidelines are covered by the analyzed process, with four of them having no evidence of being adopted: involvement of people in process design and implementation; ensuring interoperability between different systems in the information structure; addressing of all possible exceptions; coherence and consistency of semantics across all processes.
Originality/value
By the lens of EE guidelines, this paper advances a how-to-guide. This paper can support managers and researchers on PM system design and implementation, given the importance and relevance of EE recommendations having a consistent and well-structured procedure.
Details