Article
Publication date: 7 August 2017

Lovelin Ifeoma Obi, Mohammed Arif and Dennis J. Kulonda

This study aims to develop a success factor model to understand and facilitate improved cost management system (CMS) implementation in low-cost housing (LcH) project delivery in…

Abstract

Purpose

This study aims to develop a success factor model to understand and facilitate improved cost management system (CMS) implementation in low-cost housing (LcH) project delivery in Nigeria.

Design/methodology/approach

Literature findings highlight 13 drivers affecting effective implementation within the CMS and uses series of brainstorming sessions and questionnaire surveys to validate the drivers. Factor analysis (FA) identifies possible contextual relationships among the validated drivers and groups them into three success factors. The results of the FA are refined using interpretive structural modelling (ISM). The ISM identifies and models the influential drivers and aids the development of the success factor model.

Findings

Effective team qualities, information and management actions and a stable operational environment are the three essential success factors for effective CMS implementation.

Practical implications

The paper highlights effective team qualities as the most important CMS considerations for Nigerian LcH project delivery. This finding creates the needed awareness to guide project sponsors and project managers in the appropriate selection of the project management team (PMT) as well as the procurement system that facilitates their collaboration.

Originality/value

This study is a novel research using FA and ISM to investigate the influence of success factors needful for effective implementation within the CMS. It further develops a hierarchy model that aids the PMT with better understanding of the drivers and factors interrelationships for use on LcH projects within the Nigerian context.

Details

Journal of Financial Management of Property and Construction, vol. 22 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 10 May 2021

Adekunle Sabitu Oyegoke, Robert Powell, Saheed Ajayi, Godawatte Arachchige Gimhan Rathnagee Godawatte and Temidayo Akenroye

This paper aims to identify and analyse the factors affecting the selection of effective cost control techniques in the UK construction industry and assess their importance. The…

1414

Abstract

Purpose

This paper aims to identify and analyse the factors affecting the selection of effective cost control techniques in the UK construction industry and assess their importance. The study examines these key areas; the factors that have significant impacts on cost overruns, the most effective cost control techniques and the factors for selecting cost control techniques for a project.

Design/methodology/approach

The study relies on a mixed-method research approach; a qualitative exploration of the most effective cost control techniques and the factors affecting the selection of cost control techniques, followed by a questionnaire survey and follow-up interviews. Relative importance index (RII) is used for ranking the factors.

Findings

The budgeting technique is ranked first with-0.821RII, followed by cost forecasting-0.800RII and cashflow monitoring-00.733RII, as the most effective cost control techniques. On factors that influenced the choice of the techniques used, cost information/cost-related factors are ranked first with-0.611RII, followed by the size of the company-0.509RII and the effectiveness of the technique-0.572RII.

Research limitations/implications

Although the scope of the study was limited to the UK construction industry, the results could be interpreted for critical learning in other developed/developing countries.

Originality/value

Identifying and ranking the factors affecting the selection of effective cost control techniques in the UK construction industry has been the focal point of this study. The study also proposes a simple but effective model which can be used for critical learning on mitigating cost overruns and the effective use of cost control techniques in the construction industry.

Details

Journal of Financial Management of Property and Construction , vol. 27 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 25 January 2021

Lovelin Ifeoma Obi, Mohammed Arif, Bankole Awuzie, Rubina Islam, Aman Deep Gupta and Robert Walton

Effective cost performance is a crucial criterion measuring successful project management in public-housing projects. This paper aims to analyse the vital underlying factors…

1209

Abstract

Purpose

Effective cost performance is a crucial criterion measuring successful project management in public-housing projects. This paper aims to analyse the vital underlying factors surrounding the successful cost management process (CMP) outcomes in public housing projects (PHPs).

Design/methodology/approach

The research was conducted in three stages. The first stage consisted of a detailed literature review to document success factors affecting cost performances and management. In stage two, brainstorming sessions were undertaken with construction experts knowledgeable in cost management practices and have been involved in PHPs. These sessions were used to refine those success factors for the PHPs settings and define their criticality with respect to the CMP stages using interpretive ranking process. In stage three, focus group sessions were performed to validate the interrelationships of the contextualised critical success factors.

Findings

The top three most critical factors for successful implementation and outcomes at all CMP stages in PHPs settings were found to relate to competencies, team qualities and collaborative practices of the project team. Early contractor involvement and effective construction planning and management also emerged relevant to the process.

Practical implications

Government project departments, project managers and construction organisations (consultants and contractors) need to commit and mandate continuous development of cost management competencies for all professionals engaged in PHPs. Channels supporting team integration and collaborative practices between design and construction teams are required to increase the likelihood of successful project cost management practice and outcomes in PHPs.

Originality/value

The research has developed a factor-process relationship model that can be used to improve and evaluate the efficacy of CMP implementation in PHP settings.

Details

Construction Innovation , vol. 21 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 11 September 2019

Emmanuel Tayo Adu and Akintayo Opawole

Effort towards improving project performance has necessitated the need for effective teamwork among the stakeholders in the construction industry. The purpose of this paper is to…

1001

Abstract

Purpose

Effort towards improving project performance has necessitated the need for effective teamwork among the stakeholders in the construction industry. The purpose of this paper is to identify the major attributes of effective teamwork and the challenges encountered by the team during construction with a view to improving performance of projects.

Design/methodology/approach

Data for the study were obtained through 420 structured questionnaires, which were administered to a sample of project participants including clients’, contractors’ and consultants’ organizations’ representatives in South-Southern region of Nigeria. Data collected were analyzed using percentage, mean item score and Kruskal–Wallis rank test.

Findings

The findings revealed leadership skills, top management support and interpersonal dynamics of the team among the critical attributes for effective teamwork. The prevailing challenges of effective teamwork were identified as essentially; poor leadership, poor rapport among team members and lack of effective communication.

Practical implications

The study ultimately provides implication for effective team building among clients’, consultants’ and contractors’ organizations towards efficient delivery of construction projects. Moreover, the stakeholders in the industry would find the results of this research useful in managing human and non-human components of construction projects through the understanding of the attributes and challenges of teamwork with ultimate aim of achieving effective project performance.

Originality/value

The findings reveal that all the key stakeholders’ organizations; clients, consultants and contractors’ organizations exhibit similar perceptions of the attributes and challenges confronting teamwork in construction project delivery. The empirical evidence provided on the attributes and challenges would therefore offer robust information in building effective project team by stakeholders during the planning and implementation stages, which is a right step towards enhancing construction project performance.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 25 May 2023

Francisco Villena Manzanares, Tatiana García-Segura and Eugenio Pellicer

Building information modeling (BIM) is a growing technology and methodology for project design in the construction industry. However, when the project design team designs with BIM…

Abstract

Purpose

Building information modeling (BIM) is a growing technology and methodology for project design in the construction industry. However, when the project design team designs with BIM in a free-form manner (without a qualified instructor), it is not clear how behavior or trust might develop among project team members, nor if there are variables that might influence the improvement of such collaboration.

Design/methodology/approach

A sample of 92 responses was obtained from managers of project design firms in the architecture, engineering and construction (AEC) sector. The questionnaire data were analyzed using partial least square structural equation modeling (PLS-SEM).

Findings

This paper provides an explanation, from a happiness management perspective, to reflect on the importance of establishing policies to enhance effective communication between project team members in BIM design, as it improves trust between team members and their collaborators, developing the overall satisfaction of all the agents involved in the project.

Originality/value

The researchers suggest that there is a gap in the literature on how effective communication influences the implementation of BIM methodology.

Details

Management Decision, vol. 62 no. 2
Type: Research Article
ISSN: 0025-1747

Keywords

Article
Publication date: 18 August 2022

Ofer Zwikael, Michelle Salmona, Jack Meredith and Seyed Ashkan Zarghami

Although the literature is clear on what comprises effective project stakeholder management, communication between key stakeholders and project managers is often ineffective…

2084

Abstract

Purpose

Although the literature is clear on what comprises effective project stakeholder management, communication between key stakeholders and project managers is often ineffective. Research is silent on stakeholders' insufficient knowledge of project management terminology, which is a barrier for such effective communication. This paper aims to identify the project management concepts that key stakeholders should understand to improve effective communication.

Design/methodology/approach

This paper employs a three-step research design. In the first step, based on threshold concept theory, the authors identify the key project management concepts through interviews with 20 project management practitioners, trainers and trainees. In the second step, the authors confirm the findings from the first step and identify effective approaches to enhance project stakeholders' communication through seven additional interviews with project stakeholders. In the third step, the authors construct a functional model of the research findings by employing a system-level modeling tool.

Findings

This research identifies five project management threshold concepts (TC) that are challenging for project stakeholders to understand (1) project benefits, (2) the iron triangle, (3) the critical path, (4) uncertainty and (5) project leadership. Following these knowledge barriers, the paper proposes unique approaches to develop effective project stakeholder communication.

Originality/value

This paper advances project stakeholder management research by identifying knowledge barriers and providing project managers with more effective approaches to better engage with their stakeholders.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 25 October 2021

Yaser Gamil and Ismail Abd Rahman

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in…

14032

Abstract

Purpose

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in construction projects using Smart-PLS.

Design/methodology/approach

The first method of this research is to identify the causes and effects factors of poor communication in construction projects from the extant of literature. The data used to develop the model was collected using a questionnaire survey, which targeted construction practitioners in the Malaysian construction industry. A five-point Likert type scale was used to rate the significance of the factors. The factors were classified under their relevant construct/group using exploratory factor analysis. A hypothetical model was developed and then transformed into Smart-PLS in which the hypothetical model suggested that each group of the cause factors has a direct impact on the effect groups. The hypothesis was tested using t-values and p-values. The model was assessed for its inner and outer components and achieved the threshold criterion. Further, the model was verified by engaging 14 construction experts to verify its applicability in the construction project setting.

Findings

The study developed a structural equation model to clarify the relationships between causes and effects of poor communication in construction projects. The model explained the degree of relationships among causes and effects of poor communication in construction projects.

Originality/value

The published academic and non-academic literature introduced many studies on the issue of communication including the definitions, importance, barriers to effective communication and means of poor communication. However, these studies ended up only on the general issue of communication lacking an in-depth investigation of the causes and effects of poor communication in the construction industry. The study implemented advanced structural modeling to study the causes and effects. The questionnaire, the data and concluding results fill the identified research gap of this study. The addressed issue is also of interest because communication is considered one of the main knowledge areas in construction management.

Details

Journal of Facilities Management , vol. 21 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 6 May 2014

H. Frank Cervone

The purpose of this review is to look at some of the common mistakes made related to communication within a project and how those mistakes can be avoided. Communication in projects

17891

Abstract

Purpose

The purpose of this review is to look at some of the common mistakes made related to communication within a project and how those mistakes can be avoided. Communication in projects is a critical factor in a project’s success. Many times, project teams forget some basic rules for communicating with their stakeholders.

Design/methodology/approach

The approach of this paper is to provide a general overview of common themes in the project management literature related to communication within projects.

Findings

While communication failures in projects are caused by many factors, the project team ultimately bears the burden for ensuring successful communication within a project. There are several common causes of communication failures. Thankfully, there are also some simple things that project teams can do to lessen the likelihood of miscommunication.

Research limitations/implications

As this is a general overview, this article only explores the more commonly experienced issues related to project miscommunication.

Originality/value

By observing some relatively easy to remember questions and concerns related to communication, a project team can be more effective in communicating with their project stakeholders. Effective communication will generally lead to better outcomes and, therefore, a higher likelihood for overall project success.

Details

OCLC Systems and Services: International digital library perspectives, vol. 30 no. 2
Type: Research Article
ISSN: 1065-075X

Keywords

Article
Publication date: 14 October 2020

Elnaz Safapour, Sharareh Kermanshachi and Shirin Kamalirad

Effective internal communication facilitates the transfer of data and information among project parties throughout the execution of construction projects. It minimizes the…

1463

Abstract

Purpose

Effective internal communication facilitates the transfer of data and information among project parties throughout the execution of construction projects. It minimizes the distortion of data and major cost overruns and delays. The aim of this study was to determine main components of the project characteristics that affect quality of internal communication within owners, designers and contractors in construction projects.

Design/methodology/approach

Project characteristics that significantly affect quality of internal communication were identified through existing literature. Forty case studies associated with national and international construction projects were gathered. Since data regarding other aspects of collected case studies, which were not included in the case study data, were required, a structured survey was developed and distributed to the primary stakeholders. The factor analysis method was adopted to determine the key components of effective internal communication.

Findings

The results demonstrated that project targets, bureaucracy, location and coordination affect the quality of internal communication among owner entities. Additionally, design and technology, clarity of the project’s scope, resources, delivery, construction management and design management affect quality of internal communication within design entities. Qualified field labor, objectives, restrictions, material quality, equipment quality, availability of qualified project managers and equipment turnovers affect the quality of internal communication within contractors.

Originality/value

The findings of this study help project managers evaluate the effectiveness of internal communication of a construction project during the early stages of the project. Additionally, the outcomes guide project managers to allocate sufficient resources to their projects and adopt proactive strategies which prevent/reduce miscommunications and their unintended consequences.

Details

Built Environment Project and Asset Management, vol. 11 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 20 February 2020

Jeffrey Boon Hui Yap and Martin Skitmore

Legions of projects fail to attain their time and cost objectives due to ineffective coordination. This is often due to a lack of essential learning from projects because of…

2282

Abstract

Purpose

Legions of projects fail to attain their time and cost objectives due to ineffective coordination. This is often due to a lack of essential learning from projects because of insufficient communication and working experience. One of the key reasons why this occurs is that managers are unaware of what knowledge needs to be retained. In contrast with knowledge management research, which mostly focuses on the systems and processes for capturing, storing, and retrieval of knowledge, this paper investigates the nature of project communication and learning and their role on project time and cost control.

Design/methodology/approach

A stratified proportional purposive sampling approach was adopted in choosing the interview participants for the study. They are experienced industry practitioners working on building construction projects in Malaysia. Content analysis was then performed on the interview data. The identified variables were further validated by 11 industry experts from the three primary construction stakeholders.

Findings

The results of a series of 12 in-depth interviews with industry practitioners are provided to reveal the effective communication tools for sharing and learning in a project-based environment, the learning inducing situations involved, and the use of reusable project experiences to improve project time and cost control.

Research limitations/implications

A possible limitation of the study is its focus on a small group of Malaysian practitioners delimits the generalizability of the findings.

Originality/value

A two-phase model with three-step project management process of input, tools, and output is developed from the Project Management Body of Knowledge (PMBOK) Guide as an aid for more effective knowledge reuse in project time and cost control in the future.

Details

International Journal of Managing Projects in Business, vol. 13 no. 4
Type: Research Article
ISSN: 1753-8378