Search results

1 – 10 of over 122000
Article
Publication date: 13 April 2020

Ibrahim Yahaya Wuni and Geoffrey Qiping Shen

For many types of buildings, prefabricated prefinished volumetric construction (PPVC) is increasingly becoming a preferred alternative construction approach. Empirical evidence of…

2959

Abstract

Purpose

For many types of buildings, prefabricated prefinished volumetric construction (PPVC) is increasingly becoming a preferred alternative construction approach. Empirical evidence of project performance has consistently demonstrated that the ultimate success of PPVC projects is directly linked to the key decisions made at the outset of the PPVC project life cycle. However, there is limited knowledge of how to successfully manage these early stages. This research identified and evaluated the critical success factors (CSFs) required for the management of the conception, planning and design stages of the PPVC project life cycle.

Design/methodology/approach

A multistage methodological framework was adopted to identify and evaluate the CSFs for management of the early stages of the PPVC project life cycle. Based on a comprehensive literature review and expert review, a list of the 9 CSFs relevant to the early stages of the PPVC project life cycle was established. Drawing on an online-based international questionnaire survey with global PPVC experts, the CSFs were measured. The data set was statistically tested for reliability and analyzed using several techniques such as mean scores, relativity weightings and significance analysis.

Findings

The analysis revealed that the top 5 most influential CSFs for management of the early stages of the PPVC project life cycle include robust design specifications, accurate drawings and early design freeze; good working collaboration, effective communication and information sharing among project participants; effective stakeholder management; extensive project planning and scheduling; and early engagement of key players. The research further found correlations among the CSFs and proposed a conceptual framework for the management of the early stages of the PPVC project life cycle.

Research limitations/implications

The research recognizes that data quality and reliability risks are the major drawbacks of online questionnaire surveys but the engagement of experts with substantial theoretical and hands-on experiences in PPVC projects helped to minimize these risks. Although small, the sample size was justified and compared with studies that adopted the same data collection approach but analyzed even smaller samples. However, the results should be interpreted against these limitations.

Practical implications

The findings suggest that effective management of the early stages of the PPVC project lifecycle requires early commitment to the PPVC approach in a project; detailed planning and assessment of the suitability of PPVC for the given project; and collaborative design with manufacturers and suppliers to address module production challenges at the detailed design stage. These findings practically instructive and may serve as management support during PPVC implementation.

Originality/value

This research constitutes the first exclusive attempt at identifying the CSFs for successful management of the early stages of the PPVC project life cycle. It provides a fresh and more in-depth understanding of how best to manage the early stages of the PPVC project life cycle. Thus, it contributes to the practice and praxis of the PPVC project implementation discourse.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 January 2022

Aliakbar Kamari, Bartlomiej Marek Kotula and Carl Peter Leslie Schultz

A robust method in environmental load assessment of buildings is urgently required to reduce the environmental burden of the construction industry. While the industry utilizes the…

1082

Abstract

Purpose

A robust method in environmental load assessment of buildings is urgently required to reduce the environmental burden of the construction industry. While the industry utilizes the life cycle assessment (LCA) method to assess environmental impacts of detailed designs, the implementation of changes at that late stage of development is often expensive and undesirable. On the other hand, during the early design stages, the LCA method is severely limited by the lack of information available, e.g., uncertainty about final materials to be used. This research study investigates how building information modeling (BIM) can facilitate LCA analysis at an early design stage.

Design/methodology/approach

A literature review is conducted to establish a framework for BIM and LCA integration, which creates the foundation for the development of a new BIM-based LCA tool. The tool is empirically evaluated on a large case study of a residential building in Denmark.

Findings

Case study results show that the new tool facilitates decision-making in an integrated design process, providing reliable LCA results on an early stage model, while avoiding intermediate manual input by the end user in contrast to other commercial LCA tools.

Originality/value

A first prototype of a BIM-based tool is demonstrated, which allows professionals, small architectural companies, students and researchers to calculate the environmental loads of the building in the early design stage in an automated, transparent and time-saving manner.

Details

Smart and Sustainable Built Environment, vol. 11 no. 2
Type: Research Article
ISSN: 2046-6099

Keywords

Book part
Publication date: 29 March 2016

Marc Wouters, Susana Morales, Sven Grollmuss and Michael Scheer

The paper provides an overview of research published in the innovation and operations management (IOM) literature on 15 methods for cost management in new product development, and…

Abstract

Purpose

The paper provides an overview of research published in the innovation and operations management (IOM) literature on 15 methods for cost management in new product development, and it provides a comparison to an earlier review of the management accounting (MA) literature (Wouters & Morales, 2014).

Methodology/approach

This structured literature search covers papers published in 23 journals in IOM in the period 1990–2014.

Findings

The search yielded a sample of 208 unique papers with 275 results (one paper could refer to multiple cost management methods). The top 3 methods are modular design, component commonality, and product platforms, with 115 results (42%) together. In the MA literature, these three methods accounted for 29%, but target costing was the most researched cost management method by far (26%). Simulation is the most frequently used research method in the IOM literature, whereas this was averagely used in the MA literature; qualitative studies were the most frequently used research method in the MA literature, whereas this was averagely used in the IOM literature. We found a lot of papers presenting practical approaches or decision models as a further development of a particular cost management method, which is a clear difference from the MA literature.

Research limitations/implications

This review focused on the same cost management methods, and future research could also consider other cost management methods which are likely to be more important in the IOM literature compared to the MA literature. Future research could also investigate innovative cost management practices in more detail through longitudinal case studies.

Originality/value

This review of research on methods for cost management published outside the MA literature provides an overview for MA researchers. It highlights key differences between both literatures in their research of the same cost management methods.

Article
Publication date: 1 March 2019

Fadi A. Fatayer, Mohammad A. Hassanain, Abdullatif Abdallah and Abdul-Mohsen Al-Hammad

The purpose of this paper is to investigate the current practices of the early facilities management (FM) involvement during the design development and review stages (DDRS), and…

Abstract

Purpose

The purpose of this paper is to investigate the current practices of the early facilities management (FM) involvement during the design development and review stages (DDRS), and recommend activities aimed at achieving better integration.

Design/methodology/approach

A comprehensive literature review was conducted to ascertain the challenges faced by the integrated design team (IDT) in the absence of the facilities managers’ review of design solutions, and underscore the significance of the early involvement of facilities managers during the DDRS. A questionnaire survey was then developed for collecting data on eight aspects of the current practices of early FM involvement during the DDRS. The questionnaire survey was administered to the FM departments of 13 long established, public universities in Saudi Arabia. Ten responses were obtained and analyzed.

Findings

The findings suggest that the early involvement of the FM department enhances the operation and maintenance of facilities. This has been measured through reductions in the number of architectural, structural, electrical, plumbing, heating, ventilating and air conditioning defects.

Practical implications

Recommendations were provided to facilitate the process of integrating the practices of two influential stakeholders of building projects. These recommendations encompass the need for maintainability considerations at the early schematic stage, the necessity of direct contact between the two parties and the necessity of facility managers’ increased familiarity of the design stage activities, among other recommendations. In this way, the study promotes the awareness of the significance of integrating FM with the IDT at the DDRS.

Originality/value

This study contributes to the literature and practice by presenting a detailed analysis of the integration process between the FM department and the IDT. Furthermore, the outcomes of the integration between the parties were measured to assess the effectiveness of the collaboration and highlight the possible areas of improvement.

Details

International Journal of Building Pathology and Adaptation, vol. 37 no. 5
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 17 October 2023

Hatzav Yoffe, Noam Raanan, Shaked Fried, Pnina Plaut and Yasha Jacob Grobman

This study uses computer-aided design to improve the ecological and environmental sustainability of early-stage landscape designs. Urban expansion on open land and natural…

Abstract

Purpose

This study uses computer-aided design to improve the ecological and environmental sustainability of early-stage landscape designs. Urban expansion on open land and natural habitats has led to a decline in biodiversity and increased climate change impacts, affecting urban inhabitants' quality of life and well-being. While sustainability indicators have been employed to assess the performance of buildings and neighbourhoods, landscape designs' ecological and environmental sustainability has received comparatively less attention, particularly in early-design stages where applying sustainability approaches is impactful.

Design/methodology/approach

The authors propose a computation framework for evaluating key landscape sustainability indicators and providing real-time feedback to designers. The method integrates spatial indicators with widely recognized sustainability rating system credits. A specialized tool was developed for measuring biomass optimization, precipitation management and urban heat mitigation, and a proof-of-concept experiment tested the tool's effectiveness on three Mediterranean neighbourhood-level designs.

Findings

The results show a clear connection between the applied design strategy to the indicator behaviour. This connection enhances the ability to establish sustainability benchmarks for different types of landscape developments using parametric design.

Practical implications

The study allows non-expert designers to measure and embed landscape sustainability early in the design stages, thus lowering the entry level for incorporating biodiversity enhancement and climate mitigation approaches.

Originality/value

This study expands the parametric vocabulary for measuring landscape sustainability by introducing spatial ecosystem services and architectural sustainability indicators on a unified platform, enabling the integration of critical climate and biodiversity-loss solutions earlier in the development process.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2631-6862

Keywords

Article
Publication date: 8 May 2018

Changhyun Park and Heesang Lee

The purpose of this study is to identify the types and features of business relationship when the value co-creation phenomenon is extended to an early stage of the value chain, in…

1686

Abstract

Purpose

The purpose of this study is to identify the types and features of business relationship when the value co-creation phenomenon is extended to an early stage of the value chain, in which technological innovation is essential, in a high-tech business-to-business (B2B) market.

Design/methodology/approach

The methodology of building a theory from a case study is adopted in this study to propose an early-stage value co-creation network. Qualitative data are coded on the basis of grounded theory coding after collecting the triangulation data from multiple sources.

Findings

In a high-tech B2B market, three types of business relationships (supplier–customer mutual, supplier-centric and network-based business relationships) co-create values at an early stage of the value chain. Intellectual resource, efficiency resource and supplier-centric business relationships are uniquely found in this stage.

Research limitations/implications

This study provides new insight suggesting that the notion of value co-creation can be extended to early stages of the value chain in a high-tech B2B market. In addition, this research identifies vital business relationships and how these relationships develop successfully at an early-stage value co-creation network in a high-tech B2B market.

Practical implications

Technology development managers at an early stage of the value chain can co-create relationship benefits by building proposed business relationships integrating resources in a high-tech B2B market. In addition, marketing managers should consider the early stage as another source of value co-creation.

Originality/value

The notion of value co-creation is extended from the later stage to an early stage of the value chain in a high-tech B2B market. Consolidated framework of a value co-creation network integrating actors, resources and relationships, suggested in this study, will be valuable for further theoretical research and business application.

Details

Journal of Business & Industrial Marketing, vol. 33 no. 4
Type: Research Article
ISSN: 0885-8624

Keywords

Article
Publication date: 20 June 2019

Maxim Tyan, Jungwon Yoon, Nhu Van Nguyen, Jae-Woo Lee and Sangho Kim

Major changes of an aircraft configuration are conducted during the early design stage. It is important to include the airworthiness regulations at this stage while there is…

Abstract

Purpose

Major changes of an aircraft configuration are conducted during the early design stage. It is important to include the airworthiness regulations at this stage while there is extensive freedom for designing. The purpose of this paper is to introduce an efficient design framework that integrates airworthiness guidelines and documentation at the early design stage.

Design/methodology/approach

A new design and optimization process is proposed that logically includes the airworthiness regulations as design parameters and constraints by constructing a certification database. The design framework comprises requirements analysis, preliminary sizing, conceptual design synthesis and loads analysis. A design certification relation table (DCRT) describes the legal regulations in terms of parameters and values suitable for use in design optimization.

Findings

The developed framework has been validated and demonstrated for the design of a Federal Aviation Regulations (FAR) 23 four-seater small aircraft. The validation results show an acceptable level of accuracy to be applied during the early design stage. The total mass minimization problem has been successfully solved while satisfying all the design requirements and certification constraints specified in the DCRT. Moreover, successful compliance with FAR 23 subpart C is demonstrated. The proposed method is a useful tool for design optimization and compliance verifications during the early stages of aircraft development.

Practical implications

The new certification database proposed in this research makes it simpler for engineers to access a large amount of legal documentation related to airworthiness regulations and provides a link between the regulation text and actual design parameters and their bounds.

Originality/value

The proposed design optimization framework integrates the certification database that is built of several types of legal documents such as regulations, advisory circulars and standards. The Engineering Requirements and Guide summarizes all the documents and design requirements into a single document. The DCRT is created as a summary table that indicates the design parameters affected by a given regulation(s), the design stage at which the parameter can be evaluated and its value bounds. The introduction of the certification database into the design optimization framework significantly reduces the engineer’s load related for airworthiness regulations.

Details

Aircraft Engineering and Aerospace Technology, vol. 91 no. 7
Type: Research Article
ISSN: 1748-8842

Keywords

Article
Publication date: 4 April 2016

Brendon Lim, Madhav P. Nepal, Martin Skitmore and Bo Xiong

Preliminary cost estimates for construction projects are often the basis of financial feasibility and budgeting decisions in the early stages of planning and for effective project…

2019

Abstract

Purpose

Preliminary cost estimates for construction projects are often the basis of financial feasibility and budgeting decisions in the early stages of planning and for effective project control, monitoring and execution. The purpose of this paper is to identify and better understand the cost drivers and factors that contribute to the accuracy of estimates in residential construction projects from the developers’ perspective.

Design/methodology/approach

The paper uses a literature review to determine the drivers that affect the accuracy of developers’ early stage cost estimates and the factors influencing the construction costs of residential construction projects. It used cost variance data and other supporting documentation collected from two case study projects in South East Queensland, Australia, along with semi-structured interviews conducted with the practitioners involved.

Findings

It is found that many cost drivers or factors of cost uncertainty identified in the literature for large-scale projects are not as apparent and relevant for developers’ small-scale residential construction projects. Specifically, the certainty and completeness of project-specific information, suitability of historical cost data, contingency allowances, methods of estimating and the estimator’s level of experience significantly affect the accuracy of cost estimates. Developers of small-scale residential projects use pre-established and suitably priced bills of quantities as the prime estimating method, which is considered to be the most efficient and accurate method for standard house designs. However, this method needs to be backed with the expertise and experience of the estimator.

Originality/value

There is a lack of research on the accuracy of developers’ early stage cost estimates and the relevance and applicability of cost drivers and factors in the residential construction projects. This research has practical significance for improving the accuracy of such preliminary cost estimates.

Details

Journal of Financial Management of Property and Construction, vol. 21 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 13 April 2012

Patrick T.I. Lam, Franky W.H. Wong, Albert P.C. Chan, Wilson C.Y. Shea and Jo W.S. Lau

The purpose of this paper is to depict the developmental process of a buildability assessment model for use at the scheme design stage of building projects, which have a priority…

1593

Abstract

Purpose

The purpose of this paper is to depict the developmental process of a buildability assessment model for use at the scheme design stage of building projects, which have a priority requirement for functional performance rather than aesthetic performance.

Design/methodology/approach

First, major decisions made at the scheme design stage of building projects were identified through pilot interviews and a questionnaire survey on designers. Second, these decisions were rated for their relative importance towards buildability through another questionnaire survey on contractors, analysed using the reliability interval method. Based on these results, a list of buildable and non‐buildable features and their impacts is compiled by interviewing major contractors. These findings were incorporated into a modified framework of buildability assessment for complete design, substituting information available at the scheme design stage. Validation was carried out using four sample projects and feedback from practitioners.

Findings

The results obtained from the Scheme Design Buildability Assessment Model have been demonstrated as reflective of actual buildability level. Buildable and non‐buildable features, as exemplified by typical building projects in Hong Kong Special Administrative Region, have been identified.

Originality/value

This is the first model which provides a tool for use by the design team to evaluate the buildability of their designs at an early stage, so that necessary improvements can be made without affecting the development program.

Details

Construction Innovation, vol. 12 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 12 March 2020

Tofigh Hamidavi, Sepehr Abrishami, Pasquale Ponterosso, David Begg and Nikos Nanos

The paper aims to leverage the importance of the integrated automatic structural design for tall buildings at the early stage. It proposes to use an automatic prototype to perform…

Abstract

Purpose

The paper aims to leverage the importance of the integrated automatic structural design for tall buildings at the early stage. It proposes to use an automatic prototype to perform the structural design, analysis and optimisation in a building information modelling (BIM)-based platform. This process starts with extracting the required information from the architectural model in Revit Autodesk, such as boundary conditions and designs different options of the structural models in Robot Autodesk. In this process, Dynamo for Revit is used to define the mathematical functions to use different variables and generate various structural models. The paper aims to expand the domain of automation in the BIM platform to reduce the iterative process in different areas such as conceptual structural design and collaboration between architects and structural engineers to reduce the time and cost at the early stages.

Design/methodology/approach

The paper begins with an exploratory research by adopting a qualitative methodology and using open-ended questions to achieve more information about the phenomenon of automation and interoperability between structural engineers and architects and gain new insight into this area. Furthermore, correlation research is used by adopting quantitative and short questions to compare the proposed prototype with the traditional process of the structural design and optimisation and the interoperability between architects and engineers and consequently, validate the research.

Findings

As an outcome of the research, a structural design optimisation (SDO) prototype was developed to semi-automate the structural design process of tall buildings at the early stages. Moreover, the proposed prototype can be used during the early stage of structural design in different areas such as residential buildings, bridges, truss, reinforced concrete detailing, etc. Moreover, comprehensive literature regarding using automation in structural design, optimisation process and interoperability between architects and engineers is conducted that provides a new insight to contribute to future research and development.

Research limitations/implications

Due to the time limit, the paper results may lack in a comprehensive automatic structural design process. Therefore, the researchers are encouraged to expand the workability of the prototype for a comprehensive automatic design check such as automatic design for the minimum deflection, displacement of different types of buildings.

Practical implications

The prototype includes implications for the development of different automatic designs.

Originality/value

The focus of this paper is the optimisation of the structural design in the BIM platform by using automation. This combination is one of the novelties of this paper, and the existing literature has a very limited amount of information and similar work in this area, especially interoperability between architects and engineers.

1 – 10 of over 122000