Article
Publication date: 22 March 2023

Cinzia Battistella, Thomas Bortolotti, Stefania Boscari, Fabio Nonino and Giulia Palombi

Diverse cultures may make people behave differently and this, in turn, can impact project management. While the relationship between culture and project success has been widely…

Abstract

Purpose

Diverse cultures may make people behave differently and this, in turn, can impact project management. While the relationship between culture and project success has been widely explored, there is a need of addressing the gap in the relationship between culture and project management performance outcomes, that is, the performance in implementing project management processes and practices. The purpose of this paper is to investigate this gap by studying the role of cultural dimensions on project management performance.

Design/methodology/approach

An explorative survey including 200 observations relating to the experiences of project managers with a big experience on projects involving many different national cultures has been conducted to collect primary data on the relationship between the nationality observed and the project management performance outcomes shown. Nationality has been used as a proxy to link individual cultural dimensions and project management performance.

Findings

The results of this paper show that individualism impacts project dynamics and project control positively. Moreover, masculinity impacts project dynamics positively, and uncertainty avoidance impacts project control negatively. When recognized, different cultural dimensions can drive project management performance outcomes. The increasing awareness on this topic can be a valid instrument to control the cultural effect and take advantage of it to enhance project success.

Originality/value

This study contributes to the theory of project management by recognizing linkages between cultural dimensions and project management performance. Moreover, this study overcomes the concept of nationality, focusing on individuals and their unique set of cultural dimensions.

Details

International Journal of Organizational Analysis, vol. 32 no. 1
Type: Research Article
ISSN: 1934-8835

Keywords

Open Access
Article
Publication date: 31 May 2022

Kari-Pekka Tampio and Harri Haapasalo

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in…

1037

Abstract

Purpose

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in practical projects. The main aim is to describe how these different methods impact value creation.

Design/methodology/approach

Action design research was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the second author acted as an “outside researcher”. Two workshops were organised to evaluate the direct and indirect challenges and benefits of the applied four methods and to explain how different methods enable value creation.

Findings

All the studied methods provide good results in terms of usability and commitment to the aims of the project, thus delivering the direct benefits expected. Process, people and tools logic works well in this case project when applying the methods properly. Significant evidence was provided on secondary deliverables of the methods, and all analysed methods had a significant impact in the area of leading people, clarifying what “focus on people” means and how it is enabled.

Practical implications

Focus on people can be achieved through different operative methods if applied in the right way. It is necessary to select the most suitable methods based on all the direct and indirect deliverables.

Originality/value

This case project offered a platform to analyse integration methods in a real-life project using the collaborative contract method. The authors were able to participate in the analysis by taking action from the very beginning of the project in terms of training, learning, continuous development and coaching of these methods and evaluating the applicability.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 March 2024

Hilary Omatule Onubi

The impact of mankind on the environment and the usage of natural resources might be influenced by spirituality, through the consciousness of creating an improved moral sense…

Abstract

Purpose

The impact of mankind on the environment and the usage of natural resources might be influenced by spirituality, through the consciousness of creating an improved moral sense regarding the consequences of human activities and the necessity to alter these to achieve sustainable development. However, the spiritual element in the form of ecospirituality (ES) has not been sufficiently considered in pro-environmental studies as it relates to the influence of green training (GT) on voluntary workplace green behaviour (VWGB) in the construction sector. This study aims to determine the effect of GT on VWGB and the mediating effect of ES on the relationship between GT and VWGB on construction projects.

Design/methodology/approach

This study’s data were gathered through a questionnaire survey of construction site managers and project managers by adopting the probability sampling method. 249 appropriately completed questionnaires were returned. The data obtained were analysed by means of the partial least squares structural equation modelling technique (PLS-SEM).

Findings

The outcomes of the study show that GT has a significant positive impact on VWGB, while ES has a significant mediating effect on the relationship between GT and VWGB, both supporting the study’s hypotheses.

Practical implications

These findings point to the fact that the hitherto conflicting results reported in earlier studies on the GT–VWGB relationship can be attributed to the lack of consideration given to ES. Hence, special attention should be given to ES.

Originality/value

This research presents actions to enhance the transformation of GT into VWGB by giving due consideration to ES, which was not taken into account in previous studies.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 3 October 2022

Libiao Bai, Shuyun Kang, Kaimin Zhang, Bingbing Zhang and Tong Pan

External stakeholder risks (ESRs) caused by unfavorable behaviors hinder the success of project portfolios (PPs). However, due to complex project dependency and numerous risk…

323

Abstract

Purpose

External stakeholder risks (ESRs) caused by unfavorable behaviors hinder the success of project portfolios (PPs). However, due to complex project dependency and numerous risk causality in PPs, assessing ESRs is difficult. This research aims to solve this problem by developing an ESR-PP two-layer fuzzy Bayesian network (FBN) model.

Design/methodology/approach

A two-layer FBN model for evaluating ESRs with risk causality and project dependency is proposed. The directed acyclic graph (DAG) of an ESR-PP network is first constructed, and the conditional probability tables (CPTs) of the two-layer network are further presented. Next, based on the fuzzy Bayesian network, key variables and the impact of ESRs are assessed and analyzed by using GeNIe2.3. Finally, a numerical example is used to demonstrate and verify the application of the proposed model.

Findings

The proposed model is a useable and effective approach for ESR assessment while considering risk causality and project dependency in PPs. The impact of ESRs on PP can be calculated to determine whether to control risk, and the most critical and heavily contributing risks and project(s) in the developed model are identified based on this.

Originality/value

This study extends prior research on PP risk in terms of stakeholders. ESRs that have received limited attention in the past are explored from an interaction perspective in the PP domain. A new two-layer FBN model considering risk causality and project dependency is proposed, which can synthesize different dependencies between projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 July 2023

Haitham Alajmani, Salma Ahmed and Sameh Monir El-Sayegh

This paper aims to measure the severity, frequency and importance of the factors causing delays in the United Arab Emirates (UAE) construction industry following the Covid-19…

Abstract

Purpose

This paper aims to measure the severity, frequency and importance of the factors causing delays in the United Arab Emirates (UAE) construction industry following the Covid-19 pandemic onset. The study also measures the likelihood of the effects caused by these delays.

Design/methodology/approach

A mixed approach of both qualitative and quantitative. Literature review was conducted to extract 40 factors of delays and 10 effects of delays. A survey was then administered to construction professionals in the UAE to collect the perceptions on the severity and frequency of factors of the causes of delays using a Likert Scale of 1–5 where 1 represented very low and 5 represented very high. Similarly, the respondents were also asked to rate the likelihood of the occurrence of the effects of the delays based on a Likert scale of 1–5 as well. Furthermore, Spearman’s rank correlation was also conducted to compute the level of agreement between the different parties; owner, consultants and contractors.

Findings

The results revealed that the top five factors of delays include: award the project for the lowest bidder, delay in progress payment, change orders by the owner, poor subcontractor performance and inadequate planning and scheduling by the contractor. The findings of this study emphasize the financial challenges and economic crisis brought upon the construction industry due to the pandemic. Furthermore, the pandemic also shifted the perceptions of construction professionals, who are now more aware of the delays caused by awarding the project to the lowest bidder who would not have the required qualifications to conduct efficient planning and scheduling that are relevant in the case of extraordinary events such as Covid-19. Moreover, a high level of agreement between the consultants and contractors was observed, with a Spearman’s rank correlation of 0.804. Additionally, the most likely effects of delays concluded from this study were time overrun/extension and poor quality of work.

Originality/value

Literature review is very rich in the field of construction projects delays. However, there is very limited research on the impact of Covid-19 in the context of construction projects delays, and insights from construction professionals regarding this matter are particularly lacking in literature. Therefore, this paper bridges the gap in literature by providing perceptions of construction professionals on the impact of Covid-19 on the factors causing delays in the UAE construction industry. The findings of this research are expected to be an invaluable resource for future to help the construction industry heal faster when encountering similar epidemics or extraordinary events.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 15 April 2024

Hamed Khadivar, Miles Murphy and Thomas Walker

This study investigates the impact of financial health and corporate governance on aviation safety, aiming to fill a critical gap in existing research. The purpose of this study…

Abstract

Purpose

This study investigates the impact of financial health and corporate governance on aviation safety, aiming to fill a critical gap in existing research. The purpose of this study is to identify how these factors influence the safety records of airlines and provide insights for regulators, airlines and stakeholders to enhance aviation safety.

Design/methodology/approach

Using a comprehensive international sample spanning 1950–2009 and later, this empirical analysis draws on diverse databases. The authors examine 372 airlines across 70 countries from 1990 to 2016. The research uses statistical models to analyze the relationship between financial indicators, corporate governance quality and aviation safety, addressing limitations of prior single-country studies.

Findings

The findings reveal a significant inverse relationship between financial health and accident propensity, with profitable airlines exhibiting lower accident rates. Additionally, airlines with higher corporate governance quality, characterized by qualified directors and stable leadership, experience fewer accidents. The study identifies key factors such as pilot errors, mechanical failures and adverse weather, contributing to approximately 75% of accidents, emphasizing the importance of organizational control.

Practical implications

This research has crucial implications for aviation safety policies and practices. Regulators and international organizations, such as International Civil Aviation Organization and International Air Transport Association, should allocate resources to supervise financially vulnerable airlines and those with lower governance quality. Governments might consider incentivizing safety practices through tax deductibility for relevant expenses. Shareholders are encouraged to prioritize qualified, younger and less busy directors, recognizing their impact on safety performance.

Originality/value

This study contributes to existing literature by addressing methodological biases and offering a comprehensive international perspective. The identification of a link between financial health, corporate governance and accident rates in the aviation industry provides valuable insights. The research informs policymakers, regulators and industry stakeholders on effective strategies to improve safety by considering financial and governance factors under their control.

Details

Aircraft Engineering and Aerospace Technology, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1748-8842

Keywords

Article
Publication date: 3 August 2023

Tien Dung Nguyen, Hung Gia Hoang and Le Thi Hoa Sen

The paper aimed to examine the determinants of agricultural commercialisation of farmers and measured its commercialisation level in the highland of Vietnam.

Abstract

Purpose

The paper aimed to examine the determinants of agricultural commercialisation of farmers and measured its commercialisation level in the highland of Vietnam.

Design/methodology/approach

A sample size of 360 was randomly chosen from a total population of 5,771 farmers, and a structured questionnaire was developed to collect data. Descriptive and inferential statistics, including linear regression analysis, were used to analyse the data.

Findings

The descriptive statistics showed that the average commercialisation level of farmers was 56.3%. The regression model result indicated that number of off-farm income sources, farmer's risk perception, farming practices, number of agricultural activities, motorbikes value, ethnicity, distance from the city centre, number of customers, non-traded inputs value, participation in training programmes, family size, farm size, mobile phones value, traded inputs value, land tenure, distance from the local market and education of household head significantly affected agricultural commercialisation of farmers.

Originality/value

Any development strategies that assist farmers in adopting commercial farming in the highland of developing countries should consider these determinants.

Peer review

The peer review history for this article is available at: https://publons.com/publon/10.1108/IJSE-03-2022-0161

Details

International Journal of Social Economics, vol. 51 no. 3
Type: Research Article
ISSN: 0306-8293

Keywords

Article
Publication date: 8 April 2024

Arshdeep Singh, Kashish Arora and Suresh Chandra Babu

Climate change-related weather events significantly affect rice production. In this paper, we investigate the impact of and interrelationships between agriculture inputs, climate…

Abstract

Purpose

Climate change-related weather events significantly affect rice production. In this paper, we investigate the impact of and interrelationships between agriculture inputs, climate change factors and financial variables on rice production in India from 1970–2021.

Design/methodology/approach

This study is based on the time series analysis; the unit root test has been employed to unveil the integration order. Further, the study used various econometric techniques, including vector autoregression estimates (VAR), cointegration test, autoregressive distributed lag (ARDL) model and diagnostic test for ARDL, fully modified least squares (FMOLS), canonical cointegrating regression (CCR), impulse response functions (IRF) and the variance decomposition method (VDM) to validate the long- and short-term impacts of climate change on rice production in India of the scrutinized variables.

Findings

The study's findings revealed that the rice area, precipitation and maximum temperature have a significant and positive impact on rice production in the short run. In the long run, rice area (ß = 1.162), pesticide consumption (ß = 0.089) and domestic credit to private sector (ß = 0.068) have a positive and significant impact on rice production. The results show that minimum temperature and direct institutional credit for agriculture have a significant but negative impact on rice production in the short run. Minimum temperature, pesticide consumption, domestic credit to the private sector and direct institutional credit for agriculture have a negative and significant impact on rice production in the long run.

Originality/value

The present study makes valuable and original contributions to the literature by examining the short- and long-term impacts of climate change on rice production in India over 1970–2021. To the best of the authors’ knowledge, The majority of the studies examined the impact of climate change on rice production with the consideration of only “mean temperature” as one of the climatic variables, while in the present study, the authors have considered both minimum as well as maximum temperature. Furthermore, the authors also considered the financial variables in the model.

Details

China Agricultural Economic Review, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1756-137X

Keywords

Article
Publication date: 5 December 2023

Hui Tao, Hang Xiong, Liangzhi You and Fan Li

Smart farming technologies (SFTs) can increase yields and reduce the environmental impacts of farming by improving the efficient use of inputs. This paper is to estimate farmers'…

Abstract

Purpose

Smart farming technologies (SFTs) can increase yields and reduce the environmental impacts of farming by improving the efficient use of inputs. This paper is to estimate farmers' preference and willingness to pay (WTP) for a well-defined SFT, smart drip irrigation (SDI) technology.

Design/methodology/approach

This study conducted a discrete choice experiment (DCE) among 1,300 maize farmers in North China to understand their WTP for various functions of SDI using mixed logit (MIXL) models.

Findings

The results show that farmers have a strong preference for SDI in general and its specific functions of smart sensing and smart control. However, farmers do not have a preference for the function of region-level agronomic planning. Farmers' preferences for different functions of SDI are heterogeneous. Their preference was significantly associated with their education, experience of being village cadres and using computers, household income and holding of land and machines. Further analysis show that farmers' WTP for functions facilitated by hardware is close to the estimated prices, whereas their WTP for functions wholly or partially facilitated by software is substantially lower than the estimated prices.

Practical implications

Findings from the empirical study lead to policy implications for enhancing the design of SFTs by integrating software and hardware and optimizing agricultural extension strategies for SFTs with digital techniques such as videos.

Originality/value

This study provides initial insights into understanding farmers' preferences and WTP for specific functions of SFTs with a DCE.

Details

China Agricultural Economic Review, vol. 16 no. 1
Type: Research Article
ISSN: 1756-137X

Keywords

1 – 10 of 28