Book part
Publication date: 16 January 2024

Ayodeji E. Oke and Seyi S. Stephen

Considering the gradual move into the information age, digital technologies have become the new trend in different industries ranging from agriculture, manufacturing…

Abstract

Considering the gradual move into the information age, digital technologies have become the new trend in different industries ranging from agriculture, manufacturing, transportation and banking, among others. The construction industry has also evolved progressively since the last decade to explore and adopt digital transformation considering the immense contribution it has towards productivity. More so, the need to combat global warming has compelled experts to begin to seek new technologies in achieving the green effect. This has led experts and researchers in the industry to seek how digital technologies can help to achieve sustainability and further functional construction. There has been a huge gap as to maximising the impact of digital transformation as many organisations in the industry are still struggling to successfully adopt and implement digital construction. This chapter will help to fill this gap and provide clear insight into how digital can help further sustainable construction.

Details

A Digital Path to Sustainable Infrastructure Management
Type: Book
ISBN: 978-1-83797-703-1

Keywords

Article
Publication date: 1 October 2021

Jemima Yarnold, Saeed Banihashemi, Charles Lemckert and Hamed Golizadeh

The purpose of this study is to examine, review and analyse the current literature on building and construction quality and determine the related themes and gaps.

Abstract

Purpose

The purpose of this study is to examine, review and analyse the current literature on building and construction quality and determine the related themes and gaps.

Design/methodology/approach

A systematic review approach was adopted on the building quality literature, and keywords such as “construction” or “building”; “defect” and “quality” or “rework” were searched through the Scopus, Web of Science and Google Scholar databases. A number of articles were found and filtered by title, abstract and keyword relevancy. Further articles were cross-referenced from these and again filtered by title, abstract and keyword relevancy. The time period for the search was 2000–2020. A total of 97 articles were found and analysed on the topic.

Findings

A number of recurring themes were found throughout the literature. They are safety, occupier satisfaction, cost, time, licensing, culture, training, software and building quality frameworks, classifications and recommendations. These themes were linked to display relationships between them from the literature. Based on the project lifecycle stages, an amalgamated classification system was developed and is presented here. The gaps in the current literature have been analysed and reported on.

Originality/value

A comprehensive descriptive, thematic and gap analysis was conducted on the available literature of building and construction quality. The emerging themes were discovered, their relationships were demonstrated and the research gaps were identified. A new classification system positioned in the project lifecycle stages is presented.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 5
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 4 August 2022

Nayana Dissanayake, Bo Xia, Martin Skitmore, Bambang Trigunarsyah and Vanessa Menadue

The purpose of this study was to prioritize the appropriate generic contractor selection criteria for Engineering–Procurement–Construction (EPC) projects in the construction…

Abstract

Purpose

The purpose of this study was to prioritize the appropriate generic contractor selection criteria for Engineering–Procurement–Construction (EPC) projects in the construction industry.

Design/methodology/approach

Proceeding from a review of previous studies and validation by a small group of experts, a preliminary set of 16 criteria was first identified. This was followed by three rounds of Delphi surveys: firstly, with 64 experienced participants confirming the relevance of the 16 criteria; secondly, with a reduced subgroup of 47 more experienced participants scoring the importance of each; and finally, providing the opportunity for these 47 to revise their scores in the light of knowing the aggregated results of the previous round.

Findings

The results show the consensus view, of which the most important criteria are ranked as past performance, project understanding, technical attributes, key personnel, health and safety, past experience, time, management, financial, contractual and legal, quality, cost, relationships, environmental and sustainability, organizational and industrial relations, and geographic location.

Originality/value

The findings are useful for both practitioners and academics in making a significant contribution to the body of knowledge of the EPC process. This will assist in providing a better understanding of criteria importance and pave the way to developing an EPC contractor selection model involving the criteria most needed to objectively identify potential contractors and evaluate tenders.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 August 2021

Ramin Asadi, Suzanne Wilkinson and James Olabode Bamidele Rotimi

The high rate of rework that occurs in construction projects has a negative effect on the performance of the construction projects. Although several mechanisms have been…

Abstract

Purpose

The high rate of rework that occurs in construction projects has a negative effect on the performance of the construction projects. Although several mechanisms have been implemented to control reworking, a comprehensive list of rework causes is yet to be provided to present the common causes that contribute to rework in construction contracts. This paper aims to investigate the most common rework causes that need to be addressed in construction contracts.

Design/methodology/approach

A mixed-method using both the qualitative and quantitative approach is used in this paper. First of all, the study adopted a four-step literature review to introduce the rework research trends and provide statistical reports using descriptive analysis. Next, a comprehensive review has been completed using content analysis to identify the common causes of rework in construction projects. Finally, the common causes in construction contracts are further investigated through a quantitative questionnaire survey to validate the initial results.

Findings

The results of the review showed an increasing trend of publications on rework over the last three decades. Most of the studies were conducted in Australia, the UK, Nigeria and Hong Kong. Based on further investigation in the study area of sources of rework, 37 causes of rework causes were identified and classified in five groups. Then, the most significant causes of rework in construction contracts were compiled in the list of 22 items.

Research limitations/implications

The paper’s reported result, contributes to the contract management body of knowledge by proposing a list of common rework causes that can be used by practitioners during the contract negotiation to prevent contractual issues. The result of the review can also be used for further investigation of the relationship between rework and contract conditions.

Originality/value

The proposed list of common causes of rework in construction contracts allows project parties to improve the terms of the contract in addressing rework, this could result in fewer contractual claims and disputes. The findings of this study will also guide the investigations into the contract conditions, thus the approach used is constructive.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 11 July 2022

Abdul Habib Zaray, Abid Hasan, Sparsh Johari, Parvez Ahmad Hashmat and Kumar Neeraj Jha

The poor quality of construction work in war-affected regions is a significant issue. The large-scale destruction to the existing infrastructure from the war necessitates cost and…

Abstract

Purpose

The poor quality of construction work in war-affected regions is a significant issue. The large-scale destruction to the existing infrastructure from the war necessitates cost and time-efficient delivery of construction projects during and post-war to bring normalcy to affected lives and places. Consequently, there is always a tendency to finish construction projects in the shortest possible time on a limited budget without following the proper quality management processes. However, the poor quality of construction projects continues to affect the country's development, growth, credibility, reputation, and public safety for several years after the war. To this end, the present study was conducted to evaluate the significant attributes and factors contributing to the poor quality of construction projects in the war-affected Afghan construction sector.

Design/methodology/approach

A total of 31 attributes influencing construction project quality were ranked based on 110 completed survey responses collected from Afghan construction professionals. Moreover, independent samples t-test, Spearman's rank correlation test, and exploratory factor analysis were conducted.

Findings

The study found a moderate consensus between clients and contractors on attributes' rankings. In addition, the independent samples t-test showed statistically significant differences in means values of responses from clients and contractors for eight attributes. Based on factor analysis, 19 important attributes (median value greater than or equal to four) were classified into 4 latent factors – (1) poor-quality assurance and control, (2) unethical practices, (3) design and drawing errors, and (4) knowledge and skills gap.

Originality/value

Evaluating the factors affecting the quality of construction projects will help clients, government departments, and construction practitioners improve the construction quality management practices. The findings will also inform the policies and procedures of international aid providers.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 June 2022

Atul Kumar Sahu, Prabhu M. and K.T. Vigneswara Rao

The occurrence of COVID-19 has impacted the wide-reaching dimensions of manufacturing, materials, procurement, management, etc., and has loaded disruptions in the wide range of…

Abstract

Purpose

The occurrence of COVID-19 has impacted the wide-reaching dimensions of manufacturing, materials, procurement, management, etc., and has loaded disruptions in the wide range of supply chain (SC) activities. The impact of COVID-19 has twisted supplier performance and influenced stakeholders’ thinking towards selecting supplier sources and making strategic sourcing decision for convinced arrangement of construction management (CM) resources. Nowadays, suppliers are intently evaluated by stakeholders in post-COVID-19 phase to induce agile availability of CM resources. Accordingly, this paper aims to demonstrate competent CM dimensions under post COVID-19 scenario for ease managing construction projects by the stakeholders.

Design/methodology/approach

The authors have implicated Grey Sets Theory along with decision-making trial and evaluation laboratory (DEMATEL) technique for understanding significant outcomes. Varieties of diverse decision aspects responsible for strategically influencing supplier sourcing decision is projected under post COVID-19 scenario for handling construction projects by the stakeholders.

Findings

This study investigated sustainable construction management dimensions (SCMD) at the stage of resource deliveries and client aspirations under post COVID-19 situation. The study demonstrated “Lead time” as the most crucial, “Product Range” as the second and “Customers dealings and relationship” as the third crucial aspect considering by the stakeholders for selecting supplier sources based on the attainment of performance score of 0.1338, 0.1273 and 0.1268, respectively. It is found that high lead time stimulates the stakeholders to divert their orders to other competent supplier sources holding a low degree of lead time as compared.

Research limitations/implications

The present study rollovers its existence by serving critical thinking, conceptual modelling, criteria identification and evaluation under CM domain for drafting effectual strategies by the suppliers. The study investigated the impact of COVID-19 on stakeholders’ decision-making and enlisted SCMD that strategically stimulated them in choosing supplier sourcing decision.

Originality/value

The present study realizes the insights of stakeholders in the post COVID-19 scenario related to the supplier sources based on performance score. The study quantified sustainable supplier attribute for construction work and practices. The study analysed the expectations of the stakeholders purchasing different varieties of construction materials from supplier sources for civil works in the post COVID-19 scenario.

Details

Journal of Global Operations and Strategic Sourcing, vol. 16 no. 2
Type: Research Article
ISSN: 2398-5364

Keywords

Article
Publication date: 2 May 2022

Shima Amini, Alireza Rezvani, Mohsen Tabassi and Seyed Saeed Malek Sadati

Cost overruns have been identified as the most significant challenge for construction sector stakeholders. Like many developing countries, the Iranian construction industry…

1382

Abstract

Purpose

Cost overruns have been identified as the most significant challenge for construction sector stakeholders. Like many developing countries, the Iranian construction industry suffers from poor cost performance. So, the current research aims to investigate the causes of cost overrun in Iranian construction projects. This paper also reviews the findings of similar studies conducted in several Asian countries.

Design/methodology/approach

This paper includes a literature review and a quantitative method with a questionnaire survey. The review is limited to the studies investigating the causes of cost overrun in an Asian country in the last decade. Moreover, the current research was conducted through a questionnaire prepared based on 43 common factors identified through the literature review. The required data were gathered from the representatives involved in handling construction activities in Iran. The collected data were analyzed based on relative importance index (RII), using the SPSS software package.

Findings

The results showed that poor site management, improper planning, fluctuation of prices of materials, lack of experience, and poor economic condition are the critical reasons for cost overrun in Iranian construction projects. The findings also indicated that among the studies conducted in Asian countries, the first three factors have the highest frequency.

Originality/value

This paper highlighted most studies concerning the cost overrun factors in construction projects in different Asian countries in recent years. Up-to-date knowledge helps to understand the complexity of this field in various periods and therefore minimizes the risk of cost overrun. This research can also be used as a benchmark for further studies to clarify similar issues in other developing countries.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 November 2022

Babar Ali, Ajibade A. Aibinu and Vidal Paton-Cole

Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and…

Abstract

Purpose

Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and synthesize the contributions of previous research undertaken in this area and propose future directions for improving the process of delay and disruption claims.

Design/methodology/approach

This study adopted a holistic systematic review of literature following Preferred Reporting Items for Systematic Reviews and Meta-Analysis guidelines. A total of 230 articles were shortlisted related to delay and disruption claims in construction using Scopus and Web of Science databases.

Findings

Six research themes were identified and critically reviewed including delay analysis, disruption analysis, claim management, contract administration, dispute resolution and delay and disruption information and records. The systematic review showed that there is a dearth of research on managing the wide-ranging information required for delay and disruption claims, ensuring the transparency and uniformity in delay and disruption claims’ information and adopting an end-user’s centred research approach for resolving the problems in the process of delay and disruption claims.

Practical implications

Complexities in delay and disruption claims are real-world problems faced by industry practitioners. The findings will help the research community and industry practitioners to prioritize their energies toward information management of delay and disruption claims.

Originality/value

This study contributes to the body of knowledge in delay and disruption claims by identifying the need for conducting more research on its information requirements and management. Subsequently, it provides an insight on the use of modern technologies such as drones, building information modeling, radio frequency identifiers, blockchain, Bigdata and machine learning, as tools for more structured and efficient attainment of required information in a transparent and consistent manner. It also recommends greater use of design science research approach for delay and disruption claims. This will help to ensure delay and disruption claims are the least complex and less dispute-prone process.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 27 July 2023

Mianzhi Yang, Qing Hui, Qingru Yang, Mengwei Fan and Xin Li

China has recently introduced a new audit law that aims to increase the scope of audit supervision and raise the standards for preventing risks in auditing national public…

Abstract

Purpose

China has recently introduced a new audit law that aims to increase the scope of audit supervision and raise the standards for preventing risks in auditing national public projects. This paper presents a systematic research study on the causes of audit risks in national public projects and discusses the process by which these causes contribute to the emergence of such risks. Furthermore, the paper investigates the core risk sources in various types of national construction project audit. This paper aims to provide theoretical support for auditors of national construction projects in risk avoidance when conducting audits.

Design/methodology/approach

In this study, the authors carefully selected five national public audit projects from China and performed a comprehensive analysis of 85 relevant audit documentation. The textual analysis was conducted using Nvivo12 software, and the grounded theory approach was adopted for generalization purposes.

Findings

Based on the research results, the findings suggest that there are five key causes contributing to the audit risk of national construction projects: professional competence, risk awareness, management capacity, level of attention and deliberate fraud. The most critical factor identified is management capability, with 59.93% of the data supporting this view. This conclusion was based on an analysis of state-owned enterprises, administrative organs and public institutions. Building upon this, a framework titled “the mechanism of audit risk factors with management capability as the core” was constructed.

Originality/value

This paper employs qualitative analysis methods to examine national construction projects in China, contributing new literature to the theoretical study of audit risk management. The article also provides practical recommendations for auditors on how to mitigate audit risks and improve the quality of audit services in national project governance.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 July 2022

Pouyan Mahdavi-Roshan and Seyed Meysam Mousavi

Most projects are facing delays, and accelerating the pace of project progress is a necessity. Project managers are responsible for completing the project on time with minimum…

Abstract

Purpose

Most projects are facing delays, and accelerating the pace of project progress is a necessity. Project managers are responsible for completing the project on time with minimum cost and with maximum quality. This study provides a trade-off between time, cost, and quality objectives to optimize project scheduling.

Design/methodology/approach

The current paper presents a new resource-constrained multi-mode time–cost–quality trade-off project scheduling model with lags under finish-to-start relations. To be more realistic, crashing and overlapping techniques are utilized. To handle uncertainty, which is a source of project complexity, interval-valued fuzzy sets are adopted on several parameters. In addition, a new hybrid solution approach is developed to cope with interval-valued fuzzy mathematical model that is based on different alpha-levels and compensatory methods. To find the compatible solution among conflicting objectives, an arithmetical average method is provided as a compensatory approach.

Findings

The interval-valued fuzzy sets approach proposed in this paper is denoted to be scalable, efficient, generalizable and practical in project environments. The results demonstrated that the crashing and overlapping techniques improve time–cost–quality trade-off project scheduling model. Also, interval-valued fuzzy sets can properly manage expressions of the uncertainty of projects which are realistic and practical. The proposed mathematical model is validated by solving a medium-sized dataset an adopted case study. In addition, with a sensitivity analysis approach, the solutions are compared and the model performance is confirmed.

Originality/value

This paper introduces a new continuous-based, resource-constrained, and multi-mode model with crashing and overlapping techniques simultaneously. In addition, a new hybrid compensatory solution approach is extended based on different alpha-levels to handle interval-valued fuzzy multi-objective mathematical model of project scheduling with influential uncertain parameters.

Details

Kybernetes, vol. 52 no. 10
Type: Research Article
ISSN: 0368-492X

Keywords