1 – 10 of over 3000Mehmet Kursat Oksuz and Sule Itir Satoglu
Disaster management and humanitarian logistics (HT) play crucial roles in large-scale events such as earthquakes, floods, hurricanes and tsunamis. Well-organized disaster response…
Abstract
Purpose
Disaster management and humanitarian logistics (HT) play crucial roles in large-scale events such as earthquakes, floods, hurricanes and tsunamis. Well-organized disaster response is crucial for effectively managing medical centres, staff allocation and casualty distribution during emergencies. To address this issue, this study aims to introduce a multi-objective stochastic programming model to enhance disaster preparedness and response, focusing on the critical first 72 h after earthquakes. The purpose is to optimize the allocation of resources, temporary medical centres and medical staff to save lives effectively.
Design/methodology/approach
This study uses stochastic programming-based dynamic modelling and a discrete-time Markov Chain to address uncertainty. The model considers potential road and hospital damage and distance limits and introduces an a-reliability level for untreated casualties. It divides the initial 72 h into four periods to capture earthquake dynamics.
Findings
Using a real case study in Istanbul’s Kartal district, the model’s effectiveness is demonstrated for earthquake scenarios. Key insights include optimal medical centre locations, required capacities, necessary medical staff and casualty allocation strategies, all vital for efficient disaster response within the critical first 72 h.
Originality/value
This study innovates by integrating stochastic programming and dynamic modelling to tackle post-disaster medical response. The use of a Markov Chain for uncertain health conditions and focus on the immediate aftermath of earthquakes offer practical value. By optimizing resource allocation amid uncertainties, the study contributes significantly to disaster management and HT research.
Details
Keywords
Jing An, Suicheng Li and Xiao Ping Wu
Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study…
Abstract
Purpose
Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study focuses on resource-constrained project scheduling in multi-project environments. The research simplifies the problem by adopting a single-project perspective using gain coefficients.
Design/methodology/approach
It employs uncertainty theory and multi-objective programming to construct a model. The optimal solution is identified using Matlab, while LINGO determines satisfactory alternatives. By combining these methods and considering actual construction project situations, a compromise solution closely approximating the optimal one is derived.
Findings
The study provides fresh insights into modeling and resolving resource-constrained project scheduling issues, supported by real-world examples that effectively illustrate its practical significance.
Originality/value
The research highlights three main contributions: effective resource utilization, project prioritization and conflict management, and addressing uncertainty. It offers decision support for project managers to balance resource allocation, resolve conflicts, and adapt to changing project demands.
Details
Keywords
Yuzhuo Wang, Chengzhi Zhang, Min Song, Seongdeok Kim, Youngsoo Ko and Juhee Lee
In the era of artificial intelligence (AI), algorithms have gained unprecedented importance. Scientific studies have shown that algorithms are frequently mentioned in papers…
Abstract
Purpose
In the era of artificial intelligence (AI), algorithms have gained unprecedented importance. Scientific studies have shown that algorithms are frequently mentioned in papers, making mention frequency a classical indicator of their popularity and influence. However, contemporary methods for evaluating influence tend to focus solely on individual algorithms, disregarding the collective impact resulting from the interconnectedness of these algorithms, which can provide a new way to reveal their roles and importance within algorithm clusters. This paper aims to build the co-occurrence network of algorithms in the natural language processing field based on the full-text content of academic papers and analyze the academic influence of algorithms in the group based on the features of the network.
Design/methodology/approach
We use deep learning models to extract algorithm entities from articles and construct the whole, cumulative and annual co-occurrence networks. We first analyze the characteristics of algorithm networks and then use various centrality metrics to obtain the score and ranking of group influence for each algorithm in the whole domain and each year. Finally, we analyze the influence evolution of different representative algorithms.
Findings
The results indicate that algorithm networks also have the characteristics of complex networks, with tight connections between nodes developing over approximately four decades. For different algorithms, algorithms that are classic, high-performing and appear at the junctions of different eras can possess high popularity, control, central position and balanced influence in the network. As an algorithm gradually diminishes its sway within the group, it typically loses its core position first, followed by a dwindling association with other algorithms.
Originality/value
To the best of the authors’ knowledge, this paper is the first large-scale analysis of algorithm networks. The extensive temporal coverage, spanning over four decades of academic publications, ensures the depth and integrity of the network. Our results serve as a cornerstone for constructing multifaceted networks interlinking algorithms, scholars and tasks, facilitating future exploration of their scientific roles and semantic relations.
Details
Keywords
This study develops a model and algorithm to solve the decentralized resource-constrained multi-project scheduling problem (DRCMPSP) and provides a suitable priority rule (PR) for…
Abstract
Purpose
This study develops a model and algorithm to solve the decentralized resource-constrained multi-project scheduling problem (DRCMPSP) and provides a suitable priority rule (PR) for coordinating global resource conflicts among multiple projects.
Design/methodology/approach
This study addresses the DRCMPSP, which respects the information privacy requirements of project agents; that is, there is no single manager centrally in charge of generating multi-project scheduling. Accordingly, a three-stage model was proposed for the decentralized management of multiple projects. To solve this model, a three-stage solution approach with a repeated negotiation mechanism was proposed.
Findings
The experimental results obtained using the Multi-Project Scheduling Problem LIBrary confirm that our approach outperforms existing methods, regardless of the average utilization factor (AUF). Comparative analysis revealed that delaying activities in the lower project makespan produces a lower average project delay. Furthermore, the new PR LMS performed better in problem subsets with AUF < 1 and large-scale subsets with AUF > 1.
Originality/value
A solution approach with a repeated-negotiation mechanism suitable for the DRCMPSP and a new PR for coordinating global resource allocation are proposed.
Details
Keywords
Pengyun Zhao, Shoufeng Ji and Yuanyuan Ji
This paper aims to introduce a novel structure for the physical internet (PI)–enabled sustainable supplier selection and inventory management problem under uncertain environments.
Abstract
Purpose
This paper aims to introduce a novel structure for the physical internet (PI)–enabled sustainable supplier selection and inventory management problem under uncertain environments.
Design/methodology/approach
To address hybrid uncertainty both in the objective function and constraints, a novel interactive hybrid multi-objective optimization solution approach combining Me-based fuzzy possibilistic programming and interval programming approaches is tailored.
Findings
Various numerical experiments are introduced to validate the feasibility of the established model and the proposed solution method.
Originality/value
Due to its interconnectedness, the PI has the opportunity to support firms in addressing sustainability challenges and reducing initial impact. The sustainable supplier selection and inventory management have become critical operational challenges in PI-enabled supply chain problems. This is the first attempt on this issue, which uses the presented novel interactive possibilistic programming method.
Details
Keywords
Libiao Bai, Mengqin Yang, Tong Pan and Yichen Sun
Selecting and scheduling optimal project portfolio simultaneously is a complex decision-making problem faced by organizations to realize the strategy. However, dynamic synergy…
Abstract
Purpose
Selecting and scheduling optimal project portfolio simultaneously is a complex decision-making problem faced by organizations to realize the strategy. However, dynamic synergy relationships among projects complicate this problem. This study aims at constructing a project portfolio selection and scheduling (PPSS) model while quantifying the dynamic synergetic effects to provide decision support for managing PPSS problems.
Design/methodology/approach
This study develops a mathematical model for PPSS with the objective of maximal project portfolio benefits (PPBs). To make the results align with the strategy, comprehensive PPBs are divided into financial and non-financial aspects based on the balanced scorecard. Then, synergy benefits evolve dynamically in the time horizon, and system dynamics is employed to quantify them. Lastly, a case example is conducted to verify the applicability of the proposed model.
Findings
The proposed model is an applicable model for PPSS while incorporating dynamic synergy. It can help project managers obtain the results that which project should be selected and when it should start while achieving optimal PPBs.
Originality/value
This study complements prior PPSS research in two aspects. First, financial and non-financial PPBs are designed as new criteria for PPSS, making the results follow the strategy. Second, this study illuminates the dynamic characteristic of synergy and quantifies the synergetic effect. The proposed model provides insights into managing a PPSS effectively.
Details
Keywords
The purpose of this study is to provide an optimal joint strategy of multi-period pricing and sales effort for a retailer with a logit choice demand in an integrated channel.
Abstract
Purpose
The purpose of this study is to provide an optimal joint strategy of multi-period pricing and sales effort for a retailer with a logit choice demand in an integrated channel.
Design/methodology/approach
Customer demand is characterized by a logit choice model, it varies over time and is influenced by price and sales effort. The multi-period decision model for the retailer is constructed using a discrete-time dynamic programming method to determine the optimal price and sales effort in each period.
Findings
When the inventory level does not exceed a certain threshold, decreasing price and increasing sales effort over time or as inventory level increases are the optimal strategies. However, once the inventory level exceeds the threshold, the optimal strategy is to maintain both price and sales effort constant as the inventory level changes or to increase price and decrease sales effort over time. Additionally, the greater the influence of sales effort on demand or the higher the arrival rate of customers, the higher the optimal price and the greater the optimal sales effort level.
Originality/value
This study contributes to the existing research on dynamic pricing and sales effort in integrated channels by incorporating a logit choice model. Furthermore, it provides valuable management insights for retailers operating in an integrated channel to make pricing and sales effort decisions based on inventory level and time period.
Details
Keywords
Jiaojiao Xu and Sijun Bai
This paper aims to develop an algorithm to study the impact of dynamic resource disruption on project makespan and provide a suitable resource disruption ratio for various complex…
Abstract
Purpose
This paper aims to develop an algorithm to study the impact of dynamic resource disruption on project makespan and provide a suitable resource disruption ratio for various complex industrial and emergency projects.
Design/methodology/approach
This paper addresses the RCPSP in dynamic environments, which assumes resources will be disrupted randomly, that is, the information about resource disruption is not known in advance. To this end, a reactive scheduling model is proposed for the case of random dynamic disruptions of resources. To solve the reactive scheduling model, a hybrid genetic algorithm with a variable neighborhood search is proposed.
Findings
The results obtained on the PSLIB instances prove the performance advantage of the algorithm; through sensitivity analysis, it can be obtained, the project makespan increases exponentially as the number of disruptions increase. Furthermore, if more than 50% of the project's resources are randomly disrupted, the project makespan will be significantly impacted.
Originality/value
The paper focuses on the impact of dynamic resource disruptions on project makespan. Few studies have considered stochastic, dynamic resource uncertainty. In addition, this research proposes a reasonable scheduling algorithm for the research problem, and the conclusions drawn from the research provide decision support for project managers.
Details
Keywords
Sumiyana Sumiyana, Efa Agus Agus Susanto, Dian Kartika Kartika Rahajeng and Rijardh Djatu Winardi
This study aims to investigate the dynamic capabilities of Indonesia’s local government internal auditors (LGIAs). LGIAs are the functional civil apparatus that is responsible for…
Abstract
Purpose
This study aims to investigate the dynamic capabilities of Indonesia’s local government internal auditors (LGIAs). LGIAs are the functional civil apparatus that is responsible for the main task of auditing local governments at the provincial, regency and municipal levels. Meanwhile, the LGIAs are also a spearhead in identifying and analysing errors, irregularities and fraudulent actions in the finance and development of local government.
Design/methodology/approach
The exploratory case study methodology was used, gathering insights from 18 individuals through interviews. In addition, the authors use a critical perspective of the LGIAs’ behaviours in enhancing their capabilities in compliance with the regulations. Moreover, the authors discuss the low motivation of LGIAs in terms of achievement in knowledge acquisition, a mechanistic curriculum creating a climate of low spirit, mental models in rooted ordinariness and behavioural anxiety in hierarchical systems of expertise.
Findings
This paper infers that the LGIAs reflect inertia in terms of capabilities because its curriculum, environment and organisation have pervasively changed the culture of the work environment. Consequently, although immorally convenient and practical, the LGIAs work with professional discipline and expedient behaviours. In addition, the LGIAs behave performativity, presenting task performances with undynamic capabilities. Lastly, these behaviours imply the need to enhance the LGIAs’ dynamic capabilities by structuring local governments’ adaptive environment. Hence, this adaptive environment, in turn, could facilitate LGIAs’ further being in high spirits in enhancing knowledge-based expertise.
Practical implications
This study firstly implies that the research findings indicate the need for environmental-, organisational- and curriculum-made transformations to change the capabilities and competencies of LGIAs in the future, facilitating them to increase assimilation-learning abilities. Furthermore, the research shows that mental models dominate LGIAs, resulting in low spirits and reluctance to develop their dynamic capabilities. The paper recommends creating a work culture where anxiety is not dominant and changing the flexibility of the professional structure for LGIAs so that they can be promoted from functional to structural officers.
Originality/value
LGIAs work in a cultural environment that is always structured to fulfil what the regulations require. So, this study’s first novelty is that it underlines the ordinary job practices of LGIAs and the low incentives to enhance their dynamic capabilities. Secondly, it is highlighted that the institution’s auspices do not facilitate LGIAs to advance their dynamic capabilities because of the static competency-based development curriculum. Thirdly, the research shows that the LGIAs are a civil apparatus whose employment system in Indonesia implies a no-dismissal culture and halo effect in measuring performance.
Details
Keywords
Xin Zou and Zhuang Rong
In repetitive projects, repetition offers more possibilities for activity scheduling at the sub-activity level. However, existing resource-constrained repetitive scheduling…
Abstract
Purpose
In repetitive projects, repetition offers more possibilities for activity scheduling at the sub-activity level. However, existing resource-constrained repetitive scheduling problem (RCRSP) models assume that there is only one sequence in performing the sub-activities of each activity, resulting in an inefficient resource allocation. This paper proposes a novel repetitive scheduling model for solving RCRSP with soft logic.
Design/methodology/approach
In this paper, a constraint programming model is developed to solve the RCRSP using soft logic, aiming at the possible relationship between parallel execution, orderly execution or partial parallel and partial orderly execution of different sub activities of the same activity in repetitive projects. The proposed model integrated crew assignment strategies and allowed continuous or fragmented execution.
Findings
When solving RCRSP, it is necessary to take soft logic into account. If managers only consider the fixed logic between sub-activities, they are likely to develop a delayed schedule. The practicality and effectiveness of the model were verified by a housing project based on eight different scenarios. The results showed that the constraint programming model outperformed its equivalent mathematical model in terms of solving speed and solution quality.
Originality/value
Available studies assume a fixed logic between sub-activities of the same activity in repetitive projects. However, there is no fixed construction sequence between sub-activities for some projects, e.g. hotel renovation projects. Therefore, this paper considers the soft logic relationship between sub-activities and investigates how to make the objective optimal without violating the resource availability constraint.