Article
Publication date: 15 December 2022

Mumtaz Ali, Ahmed Samour, Foday Joof and Turgut Tursoy

This study aims to assess how real income, oil prices and gold prices affect housing prices in China from 2010 to 2021.

Abstract

Purpose

This study aims to assess how real income, oil prices and gold prices affect housing prices in China from 2010 to 2021.

Design/methodology/approach

This study uses a novel bootstrap autoregressive distributed lag (ARDL) testing to empirically analyze the short and long links among the tested variables.

Findings

The ARDL estimations demonstrate a positive impact of oil price shocks and real income on housing market prices in both the phrases of the short and long run. Furthermore, the results reveal that gold price shocks negatively affect housing prices both in the short and long run. The result can be attributed to China’s housing market and advanced infrastructure, resulting in a drop in housing prices as gold prices increase. Additionally, the prediction of housing market prices will provide a base and direction for housing market investors to forecast housing prices and avoid losses.

Originality/value

To the best of the authors’ knowledge, this is the first attempt to analyze the effect of gold price shocks on housing market prices in China.

Details

International Journal of Housing Markets and Analysis, vol. 17 no. 3
Type: Research Article
ISSN: 1753-8270

Keywords

Article
Publication date: 12 January 2023

Jia Jia Chang, Zhi Jun Hu and Changxiu Liu

In this study, a dynamic contracting model is developed between a venture capitalist (VC) and an entrepreneur (EN) to explore the influence of asymmetric beliefs regarding…

Abstract

Purpose

In this study, a dynamic contracting model is developed between a venture capitalist (VC) and an entrepreneur (EN) to explore the influence of asymmetric beliefs regarding output-relevant parameters, agency conflicts and complementarity on the VC's posterior beliefs through the EN's unobservable effort choices to influence the optimal dynamic contract.

Design/methodology/approach

The authors construct the contracting model by incorporating the VC's effort, which is ignored in most studies. Using backward induction and a discrete-time approximation approach, the authors solve the continuous-time contract design problem, which evolves into a nonlinear ordinary differential equation (ODE).

Findings

The optimal equity share that the VC provides to the EN decreases over time. In accordance with the empirical evidence, the EN's optimistic beliefs regarding the project's profitability positively affect its equity share. However, the interactions between the optimal equity share, project risk and both partners' degrees of risk aversion are not monotonic. Moreover, the authors find that the optimal equity share increases with the degree of complementarity, which indicates that the EN is willing to cooperate with the VC. This study’s results also show that the optimal equity shares at each time are interdependent if the VC is risk-averse and independent if the VC is risk-neutral.

Research limitations/implications

In conclusion, the authors highlight two potential directions for future research. First, the authors only considered a single VC, whereas in practice, a risk project may be carried out by multiple VCs, and it is interesting to discuss how the degree of complementarity affects the number of VCs that ENs contract. Second, the authors may introduce jumps and consider more general multivariate stochastic volatility models for output dynamics and analyze the characteristics of the optimal contracts. Third, further research can deal with other forms of discretionary output functions concerning complementarity, such as Cobb–Douglas and constant elasticity of substitution (See Varian, 1992).

Social implications

The results of this study have several implications. First, it offers a novel approach to designing dynamic contracts that are specific and easy to operate. To improve the complicated venture investment situation and abate conflict between contractual parties, this study plays a good reference role. Second, the synergy effect proposed in this study provides a theoretical explanation for the executive compensation puzzle in economics, in which managers are often “rewarded for luck” (Bertrand and Mullainathan, 2001; Wu et al., 2018). This result indicates a realistic perspective on financing and establishing cooperative relationships, which enhances the efficiency of venture investment. Third, from an empirical standpoint, one can apply this framework to study research and development (R&D) problems.

Originality/value

First, the authors introduce asymmetric beliefs and Bayesian learning to study the dynamic contract design problem and discuss their effects on equity share. Second, the authors incorporate the VC's effort into the contracting problem, and analyze the synergistic effect of effort complementarity on the optimal dynamic contract.

Details

Kybernetes, vol. 53 no. 4
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 26 March 2024

Jing An, Suicheng Li and Xiao Ping Wu

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study…

Abstract

Purpose

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study focuses on resource-constrained project scheduling in multi-project environments. The research simplifies the problem by adopting a single-project perspective using gain coefficients.

Design/methodology/approach

It employs uncertainty theory and multi-objective programming to construct a model. The optimal solution is identified using Matlab, while LINGO determines satisfactory alternatives. By combining these methods and considering actual construction project situations, a compromise solution closely approximating the optimal one is derived.

Findings

The study provides fresh insights into modeling and resolving resource-constrained project scheduling issues, supported by real-world examples that effectively illustrate its practical significance.

Originality/value

The research highlights three main contributions: effective resource utilization, project prioritization and conflict management, and addressing uncertainty. It offers decision support for project managers to balance resource allocation, resolve conflicts, and adapt to changing project demands.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 November 2022

Junlong Peng and Xiang-Jun Liu

This research is aimed to mainly be applicable to expediting engineering projects, uses the method of inverse optimization and the double-layer nested genetic algorithm combined…

Abstract

Purpose

This research is aimed to mainly be applicable to expediting engineering projects, uses the method of inverse optimization and the double-layer nested genetic algorithm combined with nonlinear programming algorithm, study how to schedule the number of labor in each process at the minimum cost to achieve an extremely short construction period goal.

Design/methodology/approach

The method of inverse optimization is mainly used in this study. In the first phase, establish a positive optimization model, according to the existing labor constraints, aiming at the shortest construction period. In the second phase, under the condition that the expected shortest construction period is known, on the basis of the positive optimization model, the inverse optimization method is used to establish the inverse optimization model aiming at the minimum change of the number of workers, and finally the optimal labor allocation scheme that meets the conditions is obtained. Finally, use algorithm to solve and prove with a case.

Findings

The case study shows that this method can effectively achieve the extremely short duration goal of the engineering project at the minimum cost, and provide the basis for the decision-making of the engineering project.

Originality/value

The contribution of this paper to the existing knowledge is to carry out a preliminary study on the relatively blank field of the current engineering project with a very short construction period, and provide a path for the vast number of engineering projects with strict requirements on the construction period to achieve a very short construction period, and apply the inverse optimization method to the engineering field. Furthermore, a double-nested genetic algorithm and nonlinear programming algorithm are designed. It can effectively solve various optimization problems.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 January 2024

Md. Tareq Hossain Khondoker, Md. Mehrab Hossain and Ayan Saha

Due to its longer length compared to other construction materials and distinctive stacking patterns, obtaining construction steel bars in congested construction sites with limited…

Abstract

Purpose

Due to its longer length compared to other construction materials and distinctive stacking patterns, obtaining construction steel bars in congested construction sites with limited storage capacity becomes challenging. Lack of storage space in crowded places prompts the need for building steel bar storage choice optimization. Therefore, this study aims to optimize the construction steel bar procurement plan by providing when and how much rebar to order and how to stack different sizes of rebar considering limited storage capacity.

Design/methodology/approach

A novel approach has been presented in this paper by integrating 4D building information modelling (BIM) and mixed-integer linear programming (MILP). This technique uses BIM to retrieve material quantities, including rebar, during the design phase. Following that, activities are scheduled depending on the duration determined by crew productivity data and material quantity. Then, based on the prior price, the price of each unit of rebar is projected for the duration of construction using the exponential smoothing method. After that, the MILP approach is used to generate an optimal steel bar procurement plan for limited storage space following the scheduled rebar-related operations.

Findings

The developed strategy minimizes overall procurement costs and ensures the storage of rebar as per standard guidelines. An optimal rebar procurement and storage plan to construct a six-storied RC frame has been presented in this paper as a demonstrative example to show the effectiveness of the proposed method.

Originality/value

This work partially satisfies a long-sought research need for establishing a comprehensive construction steel bar procurement system, making it a very useful source of information for practitioners and researchers. The proposed method can be used to minimize a key performance limitation that the conventional rebar procurement practice for crowded building sites may experience.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 27 November 2023

Velmurugan Kumaresan, S. Saravanasankar and Gianpaolo Di Bona

Through the use of the Markov Decision Model (MDM) approach, this study uncovers significant variations in the availability of machines in both faulty and ideal situations in…

Abstract

Purpose

Through the use of the Markov Decision Model (MDM) approach, this study uncovers significant variations in the availability of machines in both faulty and ideal situations in small and medium-sized enterprises (SMEs). The first-order differential equations are used to construct the mathematical equations from the transition-state diagrams of the separate subsystems in the critical part manufacturing plant.

Design/methodology/approach

To obtain the lowest investment cost, one of the non-traditional optimization strategies is employed in maintenance operations in SMEs in this research. It will use the particle swarm optimization (PSO) algorithm to optimize machine maintenance parameters and find the best solutions, thereby introducing the best decision-making process for optimal maintenance and service operations.

Findings

The major goal of this study is to identify critical subsystems in manufacturing plants and to use an optimal decision-making process to adopt the best maintenance management system in the industry. The optimal findings of this proposed method demonstrate that in problematic conditions, the availability of SME machines can be enhanced by up to 73.25%, while in an ideal situation, the system's availability can be increased by up to 76.17%.

Originality/value

The proposed new optimal decision-support system for this preventive maintenance management in SMEs is based on these findings, and it aims to achieve maximum productivity with the least amount of expenditure in maintenance and service through an optimal planning and scheduling process.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 20 February 2024

Huy Minh Vo, Jyh-Bin Yang and Veerakumar Rangasamy

Construction projects commonly encounter complicated delay problems. Over the past few decades, numerous delay analysis methods (DAMs) have been developed. There is no consensus…

Abstract

Purpose

Construction projects commonly encounter complicated delay problems. Over the past few decades, numerous delay analysis methods (DAMs) have been developed. There is no consensus on whether existing DAMs effectively resolve delays, particularly in the case of complex concurrent delays. Thus, the primary objective of this study is to undertake a comprehensive and systematic literature review on concurrent delays, aiming to answer the following research question: Do existing delay analysis techniques deal with concurrent delays well?

Design/methodology/approach

This study conducts a comprehensive review of concurrent delays by both bibliometric and systematic analysis of research publications published between 1982 and 2022 in the Web of Science (WoS) and Scopus databases. For quantitative analysis, a bibliometric mapping tool, the VOSviewer, was employed to analyze 68 selected publications to explore the co-occurrence of keywords, co-authorship and direct citation. Additionally, we conducted a qualitative analysis to answer the targeted research question, identify academic knowledge gaps and explore potential research directions for solving the theoretical and practical problems of concurrent delays.

Findings

Concurrent delays are a critical aspect of delay claims. Despite DAMs developed by a limited number of research teams to tackle issues like concurrence, float consumption and the critical path in concurrent delay resolution, practitioners continue to face significant challenges. This study has successfully identified knowledge gaps in defining, identifying, analyzing and allocating liability for concurrent delays while offering promising directions for further research. These findings reveal the incompleteness of available DAMs for solving concurrent delays.

Practical implications

The outcomes of this study are highly beneficial for practitioners and researchers. For practitioners, the discussions on the resolution process of concurrent delays in terms of identification, analysis and apportionment enable them to proactively address concurrent delays and lay the groundwork for preventing and resolving such issues in their construction projects. For researchers, five research directions, including advanced DAMs capable of solving concurrent delays, are proposed for reference.

Originality/value

Existing research on DAMs lacks comprehensive coverage of concurrent delays. Through a scientometric review, it is evident that current DAMs do not deal with concurrent delays well. This review identifies critical knowledge gaps and offers insights into potential directions for future research.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 July 2023

Mohammed-Alamine El Houssaini, Abdellah Nabou, Abdelali Hadir, Souad El Houssaini and Jamal El Kafi

Ad hoc mobile networks are commonplace in every aspect of our everyday life. They become essential in many industries and have uses in logistics, science and the military…

Abstract

Purpose

Ad hoc mobile networks are commonplace in every aspect of our everyday life. They become essential in many industries and have uses in logistics, science and the military. However, because they operate mostly in open spaces, they are exposed to a variety of dangers. The purpose of this study is to introduce a novel method for detecting the MAC layer misbehavior.

Design/methodology/approach

The proposed novel approach is based on exponential smoothing for throughput prediction to address this MAC layer misbehavior. The real and expected throughput are processed using an exponential smoothing algorithm to identify this attack, and if these metrics exhibit a trending pattern, an alarm is then sent.

Findings

The effect of the IEEE 802.11 MAC layer misbehavior on throughput was examined using the NS-2 network simulator, as well as the approval of our novel strategy. The authors have found that a smoothing factor value that is near to 0 provides a very accurate throughput forecast that takes into consideration the recent history of the updated values of the real value. As for the smoothing factor values that are near to 1, they are used to identify MAC layer misbehavior.

Originality/value

According to the authors’ modest knowledge, this new scheme has not been proposed in the state of the art for the detection of greedy behavior in mobile ad hoc networks.

Details

International Journal of Pervasive Computing and Communications, vol. 20 no. 2
Type: Research Article
ISSN: 1742-7371

Keywords