Publication date: 13 March 2024

Lina Gharaibeh, Kristina Eriksson and Björn Lantz

Perceived benefits of building information modelling (BIM) have been discussed for some time, but cost–benefit benchmarking has been inconsistent. The purpose of this paper is to…

Abstract

Purpose

Perceived benefits of building information modelling (BIM) have been discussed for some time, but cost–benefit benchmarking has been inconsistent. The purpose of this paper is to investigate BIM feasibility and evaluate investment worth to elucidate and develop the current understanding of BIM merit. The aim of the study is to propose a research agenda towards a more holistic perspective of BIM use incorporating quantifying investment return.

Design/methodology/approach

An in-depth examination of research patterns has been conducted to identify challenges in the assessment of the investment value and return on investment (ROI) for BIM in the construction industry. A total of 75 research articles were considered for the final literature review. An evaluation of the literature is conducted using a combination of bibliometric analysis and systematic reviews.

Findings

This study, which analysed 75 articles, unveils key findings in quantifying BIM benefits, primarily through ROI calculation. Two major research gaps are identified: the absence of a standardized BIM ROI method and insufficient exploration of intangible benefits. Research focus varies across phases, emphasizing design and construction integration and exploring post-construction phases. The study categorizes quantifiable factors, including productivity, changes and rework reduction, requests for information reduction, schedule efficiency, safety, environmental sustainability and operations and facility management. These findings offer vital insights for researchers and practitioners, enhancing understanding of ’BIM’s financial benefits and signalling areas for further exploration in construction.

Originality/value

The ’study’s outcomes offer the latest insights for researchers and practitioners to create effective approaches for quantifying ’BIM’s financial benefits. Additionally, the proposed research agenda aims to improve the current limited understanding of BIM feasibility and investment worth evaluation. Results of the study could assist practitioners in overcoming limitations associated with BIM investment and economic evaluations in the construction industry.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 18 April 2023

Raphael Lissillour, Yuting Cui, Khaled Guesmi, Weijian Chen and Qianran Chen

This study aims to empirically examine the relationships among perceived environmental uncertainty (EV), the level of knowledge distance (KD) and the impact of value network on…

Abstract

Purpose

This study aims to empirically examine the relationships among perceived environmental uncertainty (EV), the level of knowledge distance (KD) and the impact of value network on firm performance.

Design/methodology/approach

The quantitative analysis is based on data from 243 Chinese companies with engineering, procurement and construction (EPC) business in the context of the COVID-19 pandemic.

Findings

The two dimensions of value network [network centrality (NC) and network openness (NO)] have a different impact on firm performance [financial performance (FP) and market performance (MP)]. NC has a positive impact on FP, but not on MP. NO has a positive effect on MP, but not on FP. A reduced KD mediates the relationship between value network and firm performance. Moreover, it fully mediates the relationship between NC and MP, NO and FP. Finally, during the COVID-19 pandemic, only EV has a moderating effect on KD and MP.

Research limitations/implications

This study is limited in terms of data set because it relies on a limited amount of cross-sectional data from one specific country. Therefore, researchers are encouraged to test the proposed propositions further.

Practical implications

The present findings suggest that EPC professionals should pay more attention to the EV, which may be impacted by policy, technology and the economy. This research has actionable implications for the reform of EPC in the construction industry, and practical recommendations for EPC firms to improve their corporate performance.

Originality/value

The results measure the complementary effects of both dimensions of value network (NC and NO) on two distinct aspects of firm performance (MP and FP) and assess the moderating effect of EV and KD in the context of the COVID-19 pandemics.

Details

Journal of Knowledge Management, vol. 28 no. 1
Type: Research Article
ISSN: 1367-3270

Keywords

Article
Publication date: 30 May 2023

Tingting Li, Mohd Zamre Mohd Zahir and Hasani Mohd Ali

This study aims to make some contribution to the process of corporate compliance governance in China.

Abstract

Purpose

This study aims to make some contribution to the process of corporate compliance governance in China.

Design/methodology/approach

This paper adopts qualitative method, literature research, case analysis and comparative methods to explore the Chinese compliance governance model in the field of collusive bidding crimes.

Findings

In the process of criminal prosecution of enterprises suspected of committing crimes, the judicial authorities should promote the restoration of normal production and operation of corporate enterprises by promoting the construction of corporate compliance, which is conducive to solving the difficult problem of attribution of collusive bidding crimes. In addition, corporate compliance under prosecutorial supervision is also conducive to optimizing the regulatory path of collusive bidding and achieving more effective prevention and control of unit crimes in the mode of co-regulation between the state and corporate.

Originality/value

Compliance governance corporate crime is at a nascent stage in China, and this study seeks to provide some reference for future compliance review governance in China through the analysis of specific business crime cases.

Details

Journal of Money Laundering Control, vol. 27 no. 2
Type: Research Article
ISSN: 1368-5201

Keywords

Article
Publication date: 20 September 2022

Sara Rankohi, Mario Bourgault and Ivanka Iordanova

Recent construction literature has been focusing more on integrative contracting approaches such as integrated project delivery (IPD). However, conceptual studies on integration…

Abstract

Purpose

Recent construction literature has been focusing more on integrative contracting approaches such as integrated project delivery (IPD). However, conceptual studies on integration in IPD literature are scattered and fragmented, that is, most of the studies only focused on the segmented dimension of integration. A systemic understanding of the concepts of integration in IPD project-based context is still lacking. To fill this gap, this paper analyzes two aspects of integration (dimensions and directions) in IPD literature and explores their extent in construction projects.

Design/methodology/approach

Grounded theory review and focus group discussion approaches were employed to perform a thorough conceptual review of the literature, frame the research into the theory and increase the fundamental understanding of the concept of integration in IPD literature.

Findings

In this study, IPD integrating techniques were identified and their integration dimensions and directions were discussed. Results show that integration in the project-based environment of IPD is a multidimensional construct. Based on organizational, contractual and operational characteristics of IPD projects, twenty-four integration mechanisms were identified and framed into seven clusters. The integration directions over project life-cycle were demonstrated in three contexts: (1) an on-site construction project, delivered traditionally, (2) an on-site construction project, delivered with IPD and (3) an off-site construction project, delivered with IPD.

Originality/value

This paper gathers the segments of integration into a comprehensive overview, which can help researchers and practitioners explore elements of IPD project success more precisely. A theoretical framework of integration clusters is developed, based on IPD literature. The impact of IPD on on-site versus off-site construction is illustrated from an integration direction perspective. Finally, future areas of studies for researchers and practitioners about the concept of integration in an IPD context are discussed. This paper provides a point of departure for future theoretical and empirical explorations.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 July 2023

Mohammad Omar Aburumman, Rateb Sweis and Ghaleb J. Sweis

The construction industry sector is developing rapidly, especially with the increasing pace of the Fourth Industrial Revolution in this sector. Construction projects can benefit…

Abstract

Purpose

The construction industry sector is developing rapidly, especially with the increasing pace of the Fourth Industrial Revolution in this sector. Construction projects can benefit from greater integration and collaboration between their technologies and processes to reap the advantages and keep pace with the recent significant technological and managerial techniques developments. Therefore, this study aims to delve into and investigate building information modeling (BIM) and Lean Construction (L.C.) with a concentration on the potential BIM–lean interactions synergy and integration in the Jordanian construction industry.

Design/methodology/approach

This study takes exploratory nature, followed by the deductive research approach, and is designed to be a mono-quantitative research methodology. Moreover, the sampling technique is non-probability convenience sampling, and the research strategy is implemented through a questionnaire used and analyzed by using Statistical Package for Social Science to conduct descriptive and inferential statistical analysis and verify the reliability and validity through proper tests.

Findings

The BIM–lean interactions synergy and integration findings revealed that eliminating waste (time, cost, resources), promoting continuous improvement (Kaizen) and standardizing as lean construction principles are the most significant and agreeable toward achieving BIM–lean interactions synergy. On the other hand, “High 3D Visualization Modelling” was the most significant BIM function, followed by “Rapid and Auto-Generation of Documents and Multiple Design Alternatives” and “Maintenance of Information and Design Model Integrity.” Moreover, based on the relative importance index (RII) values, “Lack of Technical Expertise in BIM-LEAN” is the most significant challenge with a 0.89 value of RII, followed by “Lack of Government Direction and Standard Guidelines” with a 0.88 value of RII and “Financial considerations” with a 0.83 value of RII.

Originality/value

This study will help provide a new detailed overview that investigates the effects and expected benefits of integrating BIM processes and technological functionalities with lean construction principles within a synergetic environment. Moreover, the study will increase the awareness of using new technologies and management approaches in the architectural, engineering and construction industry, seeking to achieve integration between these technologies to reach ideal results in terms of the outputs of construction operations.

Details

International Journal of Lean Six Sigma, vol. 15 no. 2
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 21 July 2023

Kari-Pekka Tampio, Harri Haapasalo and Jere Lehtinen

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This…

1025

Abstract

Purpose

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This study aims to create normative managerial statements as propositions from the client's perspective and to combine them into a set of activities enabling efficient organisation in the front-end phase of a hospital construction project.

Design/methodology/approach

Action design research (ADR) was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the other authors acted as “outside researchers”.

Findings

The authors created seven normative managerial propositions that were verified by the case project stakeholders and developed a managerial framework describing the client's essential stakeholder involvement and integration activities in the front-end phase of a hospital construction project based on these propositions. The authors have also depicted the subphases of the front-end phase: value definition phase in the client permanent organisation, value proposition phase in the client Programme Management Office (PMO) and finally development phase in the alliance organisation ending on the final investment decision.

Practical implications

The collaborative contract delivery model enables the early involvement and integration of stakeholders. It has been somewhat surprising to note the extent to which collaborative contracts change the client role in the project front-end. The results offer practical activities for how clients can manage front-end activities in collaborative contracts.

Originality/value

The case project offered a platform to analyse how the collaborative contract delivery model changes the emphasis of activities in the front-end of a project. One of the key benefits of collaborative contracts is that development, design and delivery occur partially in parallel, thereby enabling contributions from production to be included in the design and development. The benefit of having a real-life case under study provides the possibility to triangulate and analyse rich data, however limited by the qualitative case method.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Content available
Article
Publication date: 14 September 2023

Jiyang Yu, Hua Zhong and Marzia Bolpagni

The purpose of this paper is to analyse the current state of research on the integration of blockchain and building information modelling (BIM) in the Architecture, Engineering…

Abstract

Purpose

The purpose of this paper is to analyse the current state of research on the integration of blockchain and building information modelling (BIM) in the Architecture, Engineering, Construction and Operations (AECO) industry as a means of identifying gaps between the existing paradigm and practical applications for determining future research directions and improving the industry. The study aims to provide clear guidance on areas that need attention for further research and funding and to draw academic attention to factors beyond the technical dimension.

Design/methodology/approach

A mixed-method systematic review is used, considering multiple literature types and using a sociotechnical perspective-based framework that covers three dimensions (technic, process and context) and three research elements (why, what and how). Data are retrieved and analysed from the Web of Science and Scopus databases for the 2017–2023 period.

Findings

While blockchain has the potential to address security, traceability and transparency and complement the system by integrating supporting applications, significant gaps still exist between these potentials and widespread industry adoption. Current limitations and further research needs are identified, including designing fully integrated prototypes, empirical research to identify operational processes, testing and analysing operational-level models or applications and developing and applying a technology acceptance model for the integration paradigm. Previous research lacks contextual settings, real-world tests or empirical investigations and is primarily conceptual.

Originality/value

This paper provides a comprehensive, critical systematic review of the integration of blockchain with BIM in the construction industry, using a sociotechnical perspective-based framework which can be applied in future reviews. The study provides insight into the current state and future opportunities for policymakers and practitioners in the AECO industry to prepare for the transition in this disruptive paradigm. It also provides a phased plan along with a clear direction for the transition to more advanced applications.

Details

Construction Innovation , vol. 24 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 1 February 2022

Ayman Ahmed Ezzat Othman and Yomna Abdelghany El-Saeidy

The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design…

Abstract

Purpose

The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design process.

Design/methodology/approach

A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, the literature review was used to investigate CW, CW generated during the design process, the design process and ESI. Second, two construction projects were analysed to investigate the role of ESI towards reducing CW generated during the design waste. Third, a survey questionnaire was carried out with a representative sample of architectural design firms (ADFs) in Egypt to examine their perception and application of ESI towards reducing CW generated during the design process. Based on the results of the above, the research developed a framework to facilitate ESI during the design process to reduce CW.

Findings

Through literature review, the research highlighted the causes of CW generated during the design process and identified the benefits and challenges that encounter ESI in ADFs. Results of data analysis showed that “last-minute changes due to client requirements” was ranked the highest challenges of ESI in ADFs in Egypt followed by “lack of design experience”. Moreover, “providing technical information about materials and equipment and their capabilities” was ranked by respondents as the highest contributions of suppliers during the design process which leads to waste reduction followed by “better estimation of materials and costs”. Finally, respondents stated that “resistance of ADFs to include suppliers in the design phase” was ranked the highest challenge of ESI in the design process followed by “no clear guidelines or policies that organise ESI”.

Research limitations/implications

Because of the conceptual nature of the proposed framework, it has to be tested and validated to ensure its capability to overcome the challenges of ESI as an approach for reducing CW generated during the design process.

Practical implications

This research presents a practical solution to the problem of CW generated during the design process through ESI.

Originality/value

The research discussed the causes of CW originated from the design process and the benefits and challenges of ESI in ADFs. It investigated the perception and application of ESI in ADFs in Egypt. The proposed framework which was designed to facilitate the integration of suppliers in the early stages of the project life cycle represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 6 February 2024

Ayodeji Emmanuel Oke, John Aliu, Doyin Helen Agbaje, Andrew Ebekozien, Douglas Omoregie Aghimien, Feyisetan Leo-Olagbaye and Clinton Aigbavboa

The purpose of this study is to identify and evaluate the primary constraints that quantity surveying firms in Nigeria encounter while integrating indoor environmental quality…

Abstract

Purpose

The purpose of this study is to identify and evaluate the primary constraints that quantity surveying firms in Nigeria encounter while integrating indoor environmental quality (IEQ) principles into building designs.

Design/methodology/approach

The study used a quantitative approach by administering a well-structured questionnaire to 114 quantity surveyors. The collected data were analyzed using methods such as frequencies, percentages, mean item scores, Kruskal–Wallis test and exploratory factor analysis.

Findings

The top five ranked constraints were limited access to funding or financing options, limited availability of green materials, limited availability of insurance for sustainable buildings, limited availability of sustainable design resources and limited diversity and inclusivity within the design profession. Based on the factor analysis, the study identified six clusters of constraints: structural-related constraints, technical-related constraints, financial-related constraints, capacity-related constraints, legal-related constraints and culture-related constraints.

Practical implications

This study has several practical implications for quantity surveying firms, policymakers and industry stakeholders involved in building design and construction in Nigeria. The findings of this study can also inform future research on the integration of IEQ principles into building designs.

Originality/value

By identifying and structuring the clusters of constraints faced by quantity surveying firms in Nigeria when implementing IEQ principles, this study provides a novel approach to understanding the challenges associated with IEQ implementation in the building sector. This understanding can guide policymakers, industry stakeholders and quantity surveying firms in developing effective strategies to overcome these constraints and promote IEQ principles in building design and construction.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 3 November 2023

Qiuwen Ma, Sai On Cheung and Shan Li

Integrated project delivery (IPD) project that does not use multiparty agreement is identified as IPD-ish. The use of IPD-ish arrangement by incorporating integration practices in…

Abstract

Purpose

Integrated project delivery (IPD) project that does not use multiparty agreement is identified as IPD-ish. The use of IPD-ish arrangement by incorporating integration practices in conventional contract can be viewed as the part of the adoption process of IPD. Moreover, inappropriate integration practices invite new forms of risks and the absence of multiparty agreement adds to the challenges of risk management in IPD-ish projects. This study discusses such challenges and proposes the use of joint risk management to address the potential pitfalls in IPD-ish arrangement.

Design/methodology/approach

A mixed research method was applied. First, the criticality of IPD-ish general and integration-specific risks was examined through a survey. Second, a real IPD-ish project was used to exemplify the use of joint risk management (JRM) to manage IPD-ish risks.

Findings

Two types of risks, namely integration risks (IRs) and general risks (GRs), are identified in IPD-ish projects. Two major findings for the IRs: (1) the most critical IRs are related to unbalanced incentivization and inefficient multidisciplinary teams; and (2) only team formation related pre-contract JRM strategies affect IRs. As for the GRs, the most critical ones are associated with design issues and can be effectively mitigated by post-contract JRM.

Originality/value

Using IPD-ish arrangement is an inevitable part of implementation of full IPD. This happens as many change-averse owners would like to test the integration principles using a conventional contract that they are familiar with. In fact, success in IPD-ish would pave the path for further adoption of IPD. This study offers insight into categorization of risks in IPD-ish projects. Appropriate use of post-contract and organization related pre-contract JRM would improve the chance of teasing out the values of IPD through IPD-ish arrangements. Care should be taken to introduce some contracting integration initiatives, such as risk/reward sharing incentive.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article