Search results

1 – 2 of 2
Article
Publication date: 21 July 2023

Tillmann Boehme, Joshua Fan, Thomas Birtchnell, James Aitken, Neil Turner and Eric Deakins

Delivering housing to resource-constrained communities (RCCs) is a complex process beset with difficulties. The purpose of this study is to use a complexity lens to examine the…

Abstract

Purpose

Delivering housing to resource-constrained communities (RCCs) is a complex process beset with difficulties. The purpose of this study is to use a complexity lens to examine the approach taken by a social enterprise (SE) in Australia to develop and manage a housebuilding supply chain for RCCs.

Design/methodology/approach

The research team used a longitudinal case study approach from 2017 to 2022, which used mixed methods to understand the phenomenon and gain an in-depth understanding of the complex issues and problem-solving undertaken by an SE start-up.

Findings

Balancing mission logic with commercial viability is challenging for an SE. The supply chain solution that evolved accommodated the particulars of geography and the needs of many stakeholders, including the end-user community and government sponsors. Extensive and time-consuming socialisation and customisation led to a successful technical design and sustainable supply chain operation.

Practical implications

Analysing supply chain intricacies via a complexity framework is valuable for scholars and practitioners, assisting in designing and developing supply chain configurations and understanding their dynamics. Meeting the housing construction needs of RCCs requires the SE to place societal focus at the centre of the supply chain rather than merely being a system output. The developed business model complements the engineering solution to empower a community-led housing construction supply chain.

Originality/value

This longitudinal case study contributes to knowledge by providing rich insights into the roles of SEs and how they develop and operate supply chains to fit with the needs of RCCs. Adding a contextual response dimension to an established complexity framework helped to explain how hybrid organisations balance commercial viability demands with social mission logic by amending traditional supply chain and governance practices. The case provides insights into supply chain configuration, needed changes and potential impacts when an SE as a focal actor inserts into a traditional for-profit construction supply chain.

Details

Supply Chain Management: An International Journal, vol. 29 no. 1
Type: Research Article
ISSN: 1359-8546

Keywords

Article
Publication date: 4 October 2022

Shumank Deep, Thayaparan Gajendran, Marcus Jefferies, Venkata Suresh Uggina and Sanjay Patil

Research on strategic procurement was mostly focussed on the clients' and main contractors' perspectives, while limited work had been done from a subcontractor's perspective. The…

Abstract

Purpose

Research on strategic procurement was mostly focussed on the clients' and main contractors' perspectives, while limited work had been done from a subcontractor's perspective. The paper hypothesises that “strategic capability” influences the latent constructs of power, dependence and collaboration in the main contractor–subcontractor relationship. Therefore, the purpose of this study is to investigate the influence of a subcontractor's strategic capabilities on power, dependence and collaboration.

Design/methodology/approach

A survey questionnaire was developed and distributed amongst the subcontractors in Australia, and 212 complete responses were received. Then second order confirmatory factor analysis and partial least square structure equation modelling (PLS-SEM) analysis were performed to test the hypothesised relationships.

Findings

The findings support “strategic capabilities” as a construct expressive of a subcontractor's unique market position and good business reputation. The findings also suggest that strategically capable subcontractors enhance their potential for forming partnerships with main contractors through dependence (StratC. → Dep., β = 0.84; Effect Size (ES) = 0.713; p < 0.01), collaboration (StratC. → Collab., β = 0.84; ES = 0.697; p < 0.01) and bargaining power (StratC. → Pow., β = 0.83; ES = 0.672; p < 0.01).

Originality/value

The study is one of its kind to explore the impact of a subcontractor's strategic capability on their bargaining power, dependability and ability to form collaborations. Furthermore, results indicate that the “strategic capabilities” of subcontractors can strongly influence their ability to create “dependence”, foster “collaboration” and exert “power” over a main contractor. The findings can help improve the strategic procurement decision-making processes of both subcontractors and main contractors to build better business relationships.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Access

Year

Last 12 months (2)

Content type

1 – 2 of 2