Search results

1 – 10 of 394
Open Access
Article
Publication date: 28 February 2024

Hassan Th. Alassafi, Khalid S. Al-Gahtani, Abdulmohsen S. Almohsen and Abdullah M. Alsugair

Heating, ventilating, air-conditioning and cooling (HVAC) systems are crucial in daily health-care facility services. Design-related defects can lead to maintenance issues…

Abstract

Purpose

Heating, ventilating, air-conditioning and cooling (HVAC) systems are crucial in daily health-care facility services. Design-related defects can lead to maintenance issues, causing service disruptions and cost overruns. These defects can be avoided if a link between the early design stages and maintenance feedback is established. This study aims to use experts’ experience in HVAC maintenance in health-care facilities to list and evaluate the risk of each maintenance issue caused by a design defect, supported by the literature.

Design/methodology/approach

Following semistructured interviews with experts, 41 maintenance issues were identified as the most encountered issues. Subsequently, a survey was conducted in which 44 participants evaluated the probability and impact of each design-caused issue.

Findings

Chillers were identified as the HVAC components most prone to design defects and cost impact. However, air distribution ducts and air handling units are the most critical HVAC components for maintaining healthy conditions inside health-care facilities.

Research limitations/implications

The unavailability of comprehensive data on the cost impacts of all design-related defects from multiple health-care facilities limits the ability of HVAC designers to furnish case studies and quantitative approaches.

Originality/value

This study helps HVAC designers acquire prior knowledge of decisions that may have led to unnecessary and avoidable maintenance. These design-related maintenance issues may cause unfavorable health and cost consequences.

Open Access
Article
Publication date: 22 February 2022

AbdulLateef Olanrewaju and Hui Jing Alice Lee

Poor quality in building projects is high and increasing. Poor quality can increase the cost of a building by up to more than 50% and can delay a project by up to 50%. This…

6732

Abstract

Purpose

Poor quality in building projects is high and increasing. Poor quality can increase the cost of a building by up to more than 50% and can delay a project by up to 50%. This research investigated the poor quality of building elements/components.

Design/methodology/approach

The site operatives were requested to rate the frequency of poor quality in 25 building elements/components. The frequencies of the poor quality were scored on a five-point Likert scale, ranging from least often to extremely often. The survey forms were administered to construction site operatives by hand delivery.

Findings

The data revealed that poor quality occurred in more than 80% of the building projects completed. Approximately 40% of the cost of a building project is attributed to poor quality. In total, 70% of the respondents measured the poor quality of building elements as being high and frequent. The size and frequency of poor quality are higher in concrete, plaster, brick, foundations and roof trusses.

Practical implications

The research findings would help to reduce claims, disputes, maintenance costs and waste on sites.

Originality/value

This research provides fresh information on poor quality in building projects and provides a systemic process for anticipating poor quality in building projects. The findings also provide an option to increase maintenance span and a means to reduce claims and disputes in the construction sector.

Details

Frontiers in Engineering and Built Environment, vol. 2 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 17 November 2020

Renata Biadacz

The purpose of the study is to examine the research problem that represents an attempt to approximate the importance of quality costing in managing a modern enterprise using the…

7862

Abstract

Purpose

The purpose of the study is to examine the research problem that represents an attempt to approximate the importance of quality costing in managing a modern enterprise using the selected enterprises from small and medium-sized enterprises (SMEs) in Poland.

Design/methodology/approach

The primary goal of the research is a need to acquire knowledge about the use of quality cost accounts in enterprises operating in Poland. The research has been conducted in the SMEs of production and services. From October 2018 to December 2018, survey-based research was carried out in the selected SMEs of production and service in Poland. The targeted participants of the study are from the medium-sized enterprises, employing 50–250 people.

Findings

The pilot studies conducted in companies indicate that modern enterprises are focused on quality. Many enterprises declare to be continuously improving quality system and quality costing. However, generally, these are large companies that have implemented ISO standards, often part of international corporations. The survey result of the study shows that medium-sized enterprises still make little use of modern cost accounting variants. Based on the study, only 9.75% (39 enterprises) from a representative group of 400 companies from the sectors of manufacturing, services and production as well as service companies apply quality costing. Some of the other enterprises are only taking measures to implement quality cost accounting.

Research limitations/implications

The research has been conducted in randomly selected SMEs in the form of a questionnaire interview. In order to further analyze the construction of quality cost management (QCM) systems and the use of information from QCM by enterprises, case study method should be used more widely.

Practical implications

The results of the study provide useful help for companies that are quality-oriented and want to implement quality costing. The survey has been conducted in 400 enterprises, and the survey results of considered SMEs reveal the most important aspects of the application of quality costing.

Originality/value

The questionnaire used, the answers provided and the resulting conclusions fill the identified research gap. In the author's opinion, findings of research are relevant and useful, not only for accounting practice but also for theory. They show that although TQM and quality costing have been very popular in the literature since the 1990s, the degree of application of quality costing in practice (except for large, often international companies) is too low. So, the suitability of QCM in managing a modern enterprise from the SMEs should be promoted.

Details

The TQM Journal, vol. 33 no. 7
Type: Research Article
ISSN: 1754-2731

Keywords

Open Access
Article
Publication date: 2 September 2021

Sharmin Khan, Mohammad Saquib and Anwar Hussain

Quality in the construction industry is an important issue yet ignored during the initial stages of the life cycle of a project, that is, the design and construction stage. The…

5933

Abstract

Purpose

Quality in the construction industry is an important issue yet ignored during the initial stages of the life cycle of a project, that is, the design and construction stage. The contribution of stakeholders, especially the architects is generally suspended though it has huge significance in terms of cost and time related to quality. This research endeavors to examine the issues related to the design and construction stages of the project from architects' purview, to understand the relative importance of these issues in the Indian construction industry.

Design/methodology/approach

The study of qualitative data conducted formed a basis for online quantitative data collection that was further analyzed with the help of cross-tabulation and multiple correspondence analysis methods.

Findings

The study concludes that the budget of a project is a corresponding factor related to quality concern for architects. The study also established that the quality issues corresponding to high budgets are closely related to the construction stage and are identified as preparation of checklist, and bidding process of hiring the contractor on the lowest bid.

Research limitations/implications

The study is limited to analyzing the perspective of architects; however, other stakeholders of the construction industry may represent a different opinion.

Practical implications

This research emphasizes the importance of the client's role, and need for integration and coordination among stakeholders in the construction industry for effective quality control and management.

Originality/value

The research presents an exhaustive literature review on quality issues and its importance with respect to cost implications, standard practices, sustainability and the life cycle of the project.

Details

Frontiers in Engineering and Built Environment, vol. 1 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 12 March 2020

Maud Heijndermans, Alexander Maas, Diederik Dippel and Bianca Buijck

Many healthcare organizations are looking for methods, such as Lean, to reduce their costs and increase the productivity of their professionals. The Lean method looks at every…

1176

Abstract

Purpose

Many healthcare organizations are looking for methods, such as Lean, to reduce their costs and increase the productivity of their professionals. The Lean method looks at every step in every process to assess if this step adds value for the customer or not. The aim of this study was to explore the value adding and non-value adding process steps in stroke patient admission in an integrated care stroke service in the Netherlands.

Design/methodology/approach

This study focused on discharge of stroke patients from hospital acute treatment, and they were admitted for rehabilitation. According to the Grounded Theory, value stream mapping, organized interviews and expert meetings and coded was used. A configuration analysis was used to distinguish aggregates and configurations.

Findings

The most reported issues concerned in the paper are as follows: (1) insufficient internal logistics in the hospital, (2) miscommunication about medical readiness for discharge of the patient, (3) missing or delayed medical patient information, (4) overlapping discharge interviews, (5) unsafe transfer of sensitive information and (6) waiting lists and queuing up in rehabilitation facility.

Originality/value

At least six main areas of waste were identified in this stroke service, and they form the target for waste reducing activities. The results give insight in possible wastes in healthcare organizations and are therefore beneficial for other healthcare organizations which are planning to reduce wastes.

Details

Journal of Integrated Care, vol. 28 no. 2
Type: Research Article
ISSN: 1476-9018

Keywords

Open Access
Article
Publication date: 9 April 2018

Jafar Rezaei, Roland Ortt and Paul Trott

The purpose of this paper is to examine high-tech small-to-medium-sized enterprises (SMEs) supply chain partnerships. Partnerships are considered at the level of business function…

13036

Abstract

Purpose

The purpose of this paper is to examine high-tech small-to-medium-sized enterprises (SMEs) supply chain partnerships. Partnerships are considered at the level of business function rather than the entire organisation. Second, the drivers of SMEs to engage in partnerships are assessed to see whether functions engage in partnerships for different reasons. Third, performance per function is assessed to see the differential effect of partnerships on the function’s performance.

Design/methodology/approach

In this study, the relationship between the drivers of SMEs to engage in partnerships, four types of partnerships (marketing and sales, research and development (R&D), purchasing and logistics, and production) and four types of functional performances of firms (marketing and sales, R&D, purchasing and logistics, and production) are examined. The data have been collected from 279 SMEs. The proposed hypotheses are tested using structural equation modelling.

Findings

The results indicate that there are considerable differences between business functions in terms of the degree of involvement in partnerships and the effect of partnerships on the performance of these functions. This paper contributes to research by explaining the contradictory results of partnerships on SMEs performance.

Practical implications

This study helps firms understand which type of partnership should be established based on the firm’s drivers to engage in supply chain partnership; and which partnership has a significant effect on which type of business performance of the firm.

Originality/value

The originality of this study is to investigate the relationship between different drivers to engage in supply chain partnership and different types of partnerships and different functional performance of firm in a single model.

Details

International Journal of Productivity and Performance Management, vol. 67 no. 4
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 13 June 2016

Diego Tlapa, Jorge Limon, Jorge L García-Alcaraz, Yolanda Baez and Cuauhtémoc Sánchez

The purpose of this paper is to extend the understanding of Six Sigma (SS) and the underlying dimensions of its critical success factors (CSF) via an analysis of the effects of…

4406

Abstract

Purpose

The purpose of this paper is to extend the understanding of Six Sigma (SS) and the underlying dimensions of its critical success factors (CSF) via an analysis of the effects of top management support (TMS), implementation strategy (IS), and collaborative team (CT) on project performance (PP) in Mexican manufacturing companies.

Design/methodology/approach

Based on a SS literature review, a survey was conducted to capture practitioners’ viewpoints about CSFs for SS implementation and their impact on performance in manufacturing companies. A factor analysis and structural equation modeling were conducted in order to identify and analyze causal relationships.

Findings

The results suggest that CSFs grouped in the constructs TMS, IS, and CT have a positive impact on PP as measured by cost reduction, variation reduction, and quality improvement.

Research limitations/implications

Although the empirical data collected supported the proposed model, results might differ among organizations in different countries. In addition, the study did not analyze a unique performance metric; instead, general PP dimensions were used.

Practical implications

Boosting the TMS, IS, and CT enhances positive PP of SS in manufacturing companies.

Originality/value

IS as a construct has not been studied exhaustively; this work contributes to a better understanding of it and its impact on PP. Additionally, studies of SS in Latin America are limited, so this study gives a complementary vision to practitioners and researchers about it.

Details

Industrial Management & Data Systems, vol. 116 no. 5
Type: Research Article
ISSN: 0263-5577

Keywords

Open Access
Article
Publication date: 8 August 2023

Elisa Verna, Gianfranco Genta and Maurizio Galetto

The purpose of this paper is to investigate and quantify the impact of product complexity, including architectural complexity, on operator learning, productivity and quality…

Abstract

Purpose

The purpose of this paper is to investigate and quantify the impact of product complexity, including architectural complexity, on operator learning, productivity and quality performance in both assembly and disassembly operations. This topic has not been extensively investigated in previous research.

Design/methodology/approach

An extensive experimental campaign involving 84 operators was conducted to repeatedly assemble and disassemble six different products of varying complexity to construct productivity and quality learning curves. Data from the experiment were analysed using statistical methods.

Findings

The human learning factor of productivity increases superlinearly with the increasing architectural complexity of products, i.e. from centralised to distributed architectures, both in assembly and disassembly, regardless of the level of overall product complexity. On the other hand, the human learning factor of quality performance decreases superlinearly as the architectural complexity of products increases. The intrinsic characteristics of product architecture are the reasons for this difference in learning factor.

Practical implications

The results of the study suggest that considering product complexity, particularly architectural complexity, in the design and planning of manufacturing processes can optimise operator learning, productivity and quality performance, and inform decisions about improving manufacturing operations.

Originality/value

While previous research has focussed on the effects of complexity on process time and defect generation, this study is amongst the first to investigate and quantify the effects of product complexity, including architectural complexity, on operator learning using an extensive experimental campaign.

Details

Journal of Manufacturing Technology Management, vol. 34 no. 9
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 9 April 2024

Krisztina Demeter, Levente Szász, Béla-Gergely Rácz and Lehel-Zoltán Györfy

The purpose of this paper is to investigate how different manufacturing technologies are bundled together and how these bundles influence operations performance and, indirectly…

Abstract

Purpose

The purpose of this paper is to investigate how different manufacturing technologies are bundled together and how these bundles influence operations performance and, indirectly, business performance. With the emergence of Industry 4.0 (I4.0) technologies, manufacturing companies can use a wide variety of advanced manufacturing technologies (AMT) to build an efficient and effective production system. Nevertheless, the literature offers little guidance on how these technologies, including novel I4.0 technologies, should be combined in practice and how these combinations might have a different impact on performance.

Design/methodology/approach

Using a survey study of 165 manufacturing plants from 11 different countries, we use factor analysis to empirically derive three distinct manufacturing technology bundles and structural equation modeling to quantify their relationship with operations and business performance.

Findings

Our findings support an evolutionary rather than a revolutionary perspective. I4.0 technologies build on traditional manufacturing technologies and do not constitute a separate direction that would point towards a fundamental digital transformation of companies within our sample. Performance effects are rather weak: out of the three technology bundles identified, only “automation and robotization” have a positive influence on cost efficiency, while “base technologies” and “data-enabled technologies” do not offer a competitive advantage, neither in terms of cost nor in terms of differentiation. Furthermore, while the business performance impact is positive, it is quite weak, suggesting that financial returns on technology investments might require longer time periods.

Originality/value

Relying on a complementarity approach, our research offers a novel perspective on technology implementation in the I4.0 era by investigating novel and traditional manufacturing technologies together.

Details

Journal of Manufacturing Technology Management, vol. 35 no. 9
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 6 May 2022

Geraldo Maciel Santos Filho and Luiz Eduardo Simão

This technological article deals with a case study to implement an improvement to reduce the machine setup of an industrial process, in addition to the development of people using…

2238

Abstract

Purpose

This technological article deals with a case study to implement an improvement to reduce the machine setup of an industrial process, in addition to the development of people using the A3 methodology for problem-solving.

Design/methodology/approach

As a research method, action research was used in a single-case study applied to a motorcycle production company, using the concept of the A3 report for problem-solving as the theoretical basis.

Findings

The implementation of the improvement in the process resulted in a reduction of 70.4% of the preparation time (setup) of the machines, thus eliminating the need to add a third production shift.

Research limitations/implications

It has been applied to only one company, so it lacks a feasibility check to be implemented in other companies.

Practical implications

Regarding its practical contribution, the authors first consider that the proposed method can also be applied in small and medium-sized companies (SMEs), since the investment in this problem-solving approach is low without necessarily implementing the lean production system that, it is usually complex, time-consuming and requires the allocation of a substantial amount of resources by companies. The second practical contribution of this work is that the proposed A3 problem-solving methodology can serve as a guide for managers to implement or improve different industrial and service processes.

Originality/value

It has been applied to only one company, so it lacks a feasibility check to be implemented in other companies.

Details

Revista de Gestão, vol. 30 no. 2
Type: Research Article
ISSN: 1809-2276

Keywords

1 – 10 of 394