Search results

1 – 10 of 128

Abstract

Purpose

Competency frameworks can support public procurement capacity development and performance. However, literature on connecting professionalisation with national procurement contexts is limited. This paper aims to explain and conceptualise recent Romanian experience with developing bespoke competency frameworks at national level for public procurement that reflect the features of the Romanian public procurement system. The approach used could guide in broad-brush, mutatis mutandis, other (national) public procurement systems with comparable features, mainly those seeking a shift from a rather administrative function of public procurement towards a strategic function.

Design/methodology/approach

This case study reflects on the methodology used for analysing the Romanian public procurement environment in EU context to develop bespoke professionalisation instruments, and on ways to integrate competency management approaches in Romanian public procurement culture. That methodological mix has been mainly qualitative and constructionist, within an applied research approach. It combined desk research with empirical research and included legal research in this context.

Findings

A principled, methodological and pragmatic approach tailored to the procurement environment in question is essential for developing competency frameworks capable to resonate to and address the specific practical needs of that procurement system.

Social implications

Competency frameworks can uphold societal objectives through public procurement.

Originality/value

Using valuable insights into the development of the Romanian public procurement competency frameworks, the paper provides a conceptual framework for instilling competency management approaches to public procurement professional development where the latter is governed by a rather distinct, public administration, paradigm. This conceptual framework can guide other public procurement systems and stimulate further research.

Article
Publication date: 2 April 2024

Rick Forster, Andrew Lyons, Nigel Caldwell, Jennifer Davies and Hossein Sharifi

The study sets out to demonstrate how a lifecycle perspective on complex, public-sector procurement projects can be used for making qualitative assessments of procurement policy…

Abstract

Purpose

The study sets out to demonstrate how a lifecycle perspective on complex, public-sector procurement projects can be used for making qualitative assessments of procurement policy and practice and reveal those procurement capabilities that are most impactful for operating effectively.

Design/methodology/approach

Agency theory, institutional theory and the lifecycle analysis technique are combined to abductively develop a framework to identify, analyse and compare complex procurement policies and practices in public sector organisations. Defence is the focal case and is compared with cases in the Nuclear, Local Government and Health sectors.

Findings

The study provides a framework for undertaking a lifecycle analysis to understand the challenges and capabilities of complex, public-sector buyers. Eighteen hierarchically-arranged themes are identified and used in conjunction with agency theory and institutional theory to explain complex procurement policy and practice variation in some of the UK’s highest-profile public buyers. The study findings provide a classification of complex buyers and offer valuable guidance for practitioners and researchers navigating complex procurement contexts.

Originality/value

The lifecycle approach proposed is a new research tool providing a bespoke application of theory by considering each lifecycle phase as an individual but related element that is governed by unique institutional pressures and principal-agent relationships.

Details

International Journal of Operations & Production Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 2 April 2024

Șerban Filipon and Violeta Simionescu

Competency frameworks can support public procurement capacity development and performance. However, literature on connecting professionalisation with national procurement contexts…

Abstract

Purpose

Competency frameworks can support public procurement capacity development and performance. However, literature on connecting professionalisation with national procurement contexts is limited. This paper aims to explain and conceptualise recent Romanian experience with developing bespoke competency frameworks at national level for public procurement that reflect the features of the Romanian public procurement system. The approach used could guide in broad-brush, mutatis mutandis, other (national) public procurement systems with comparable features, mainly those seeking a shift from a rather administrative function of public procurement towards a strategic function.

Design/methodology/approach

This case study reflects on the methodology used for analysing the Romanian public procurement environment in EU context to develop bespoke professionalisation instruments, and on ways to integrate competency management approaches in Romanian public procurement culture. That methodological mix has been mainly qualitative and constructionist, within an applied research approach. It combined desk research with empirical research and included legal research in this context.

Findings

A principled, methodological and pragmatic approach tailored to the procurement environment in question is essential for developing competency frameworks capable to resonate to and address the specific practical needs of that procurement system.

Social implications

Competency frameworks can uphold societal objectives through public procurement.

Originality/value

Using valuable insights into the development of the Romanian public procurement competency frameworks, the paper provides a conceptual framework for instilling competency management approaches to public procurement professional development where the latter is governed by a rather distinct, public administration, paradigm. This conceptual framework can guide other public procurement systems and stimulate further research.

Book part
Publication date: 19 March 2024

John Thomas Flynn and Lloyd Levine

A quick search of the headlines of major newspapers reveals a treasure trove of technology procurement gone wrong. While the private sector seems to adopt and implement new…

Abstract

A quick search of the headlines of major newspapers reveals a treasure trove of technology procurement gone wrong. While the private sector seems to adopt and implement new technology seamlessly and quickly to deliver for customers, the government struggles to accomplish technology purchases and integrations with the same ease. As governments in the United States are looking to retain their current workforce and attract the next generation of workers, the technological capabilities and ethos of governments will be paramount. With nearly every industry being transformed by technology and Generation T being the first generation to have an ingrained “technology first” mindset, the ability of governments to attract these workers depends, in large part, on the ability to transform their government technology culture, policies, and practices.

In this chapter, the authors examine the administrative branch and observe two key components at the root of most technology failures: poor organizational structure in the bureaucracy and the lack of an empowered Chief Information/Technology Officer. Building upon case studies from Massachusetts and California, this chapter looks at the factors related to failure or success to understand the technology procurement culture. The chapter concludes by presenting four key “best practice” principles of public policy and administration that can be implemented by almost any governmental entity to improve their acquisition and implementation of technology.

Details

Technology vs. Government: The Irresistible Force Meets the Immovable Object
Type: Book
ISBN: 978-1-83867-951-4

Keywords

Article
Publication date: 16 April 2024

Venkataramanaiah Saddikuti, Surya Prakash, Vijaydeep Siddharth, Kanika Jain and Sidhartha Satpathy

The primary objective of this article is to examine current procurement, inventory control and management practices in modern healthcare, with a particular focus on the…

23

Abstract

Purpose

The primary objective of this article is to examine current procurement, inventory control and management practices in modern healthcare, with a particular focus on the procurement and management of surgical supplies in a prominent public, highly specialized healthcare sector.

Design/methodology/approach

This study was conducted in three phases. In Phase 1, the study team interacted with various hospital management stakeholders, including the surgical hospital store, examined the current procurement process and identified challenges. Phase 2 focused on selecting items for a detailed study and collected the qualitative and quantitative details of the store department of the healthcare sector chosen. A detailed study analyzed revenue, output/demand, inventory levels, etc. In Phase 3, a decision-making framework is proposed, and inventory control systems are redesigned and demonstrated for the selected items.

Findings

It was observed that the demand for many surgical items had increased significantly over the years due to an increase in disposable/disposable items, while inventories fluctuated widely. Maximum inventory levels varied between 50 and 75%. Storage and availability were important issues for the hospital. It is assumed the hospital adopts the proposed inventory control system. In this case, the benefits can be a saving of 62% of the maximum inventory, 20% of the average stock in the system and optimal use of storage space, improving the performance and productivity of the hospital.

Research limitations/implications

This study can help the healthcare sector administration to develop better systems for the procurement and delivery of common surgical items and efficient resource allocation. It can help provide adequate training to store staff. This study can help improve management/procurement policies, ordering and delivery systems, better service levels, and inventory control of items in the hospital business context. This study can serve as a pilot study to further investigate the overall hospital operations.

Practical implications

This study can help the healthcare sector administration develop better systems for procuring and delivering common surgical items and efficient resource allocation. It can help provide adequate training to store staff. This study can help improve management/procurement policies, ordering and delivery systems, better service levels and inventory control of items in the hospital business context. This study can serve as a pilot study to further investigate the overall hospital operations.

Originality/value

This study is an early attempt to develop a decision framework and inventory control system from the perspective of healthcare inventory management. The gaps identified in real hospital scenarios are investigated, and theoretically based-inventory management strategies are applied and proposed.

Details

Journal of Advances in Management Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0972-7981

Keywords

Article
Publication date: 15 December 2023

Preeti Jain and Amit Kumar Gupta

As digital procurement continues to transform heavily as a value center and create new business models by linking businesses with a web of external partners, the full path to…

Abstract

Purpose

As digital procurement continues to transform heavily as a value center and create new business models by linking businesses with a web of external partners, the full path to achieving such an all-encompassing thing is unknown. Thus, the study aims to explore the research gap through an exhaustive bibliometric and systematic literature review on the Digital procurement theme in the supply chain domain.

Design/methodology/approach

This study is a qualitative and quantitative analysis of this field, using performance analysis and science mapping to examine 583 articles published from 2002 to 2021.

Findings

A systematic literature review indicated core topics on “sustainable or green procurement” and “emerging landscape of technology” in the field of study.

Research limitations/implications

Though the Scopus database used for the analysis is the largest, it may not have complete coverage of all published articles in the field of study; thus, this study is a representation of only a sample rather than its entire population.

Originality/value

Outcome is based on the review of the past 20 years’ contribution on the topic starting from 2002 to 2021.

Details

Journal of Global Operations and Strategic Sourcing, vol. 17 no. 1
Type: Research Article
ISSN: 2398-5364

Keywords

Article
Publication date: 18 April 2024

C.R. Vishnu, Proshayan Chatterjee, Sai Pradyumna Maddali and Temidayo O. Akenroye

The public distribution system (PDS) is an Indian food security system established to manage the distribution of food grains at affordable prices. As a result of the population…

Abstract

Purpose

The public distribution system (PDS) is an Indian food security system established to manage the distribution of food grains at affordable prices. As a result of the population explosion, the long-established PDS system finds it challenging to maintain operational efficiency, quality, trust and transparency. This paper explores the possibility of leveraging blockchain technology to overcome these operational hurdles.

Design/methodology/approach

Through a literature review and expert interactions, the present research identifies critical success factors in terms of enablers and barriers that influence the adoption of blockchain technology in PDS. Furthermore, we propose two independent interpretive structural models (ISM) and MICMAC to characterize these attributes.

Findings

The research identifies 15 distinct enablers and ten barriers that influence the diffusion of the latest technology in the sector at focus. The analyses disclose the interrelationships/dependencies among these enablers and between barriers, along with their individual driving power and dependence power.

Practical implications

The research showcases the importance of automating the system and illustrates how the features of blockchain technology can assist in augmenting stakeholder satisfaction levels. However, poor or nonexistent government regulations and patronage are found to be the major impediments to adoption. The research also delineates the cost implications of this barrier through its interrelationships with other barriers.

Originality/value

Interesting inferences are drawn from the models that offer actionable insights for the industry, government and technologists for improving PDS performance. Such interventions will ensure national food security through enhanced trust and transparency, which can further improve efficiency and effectiveness.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Abstract

Details

Technology vs. Government: The Irresistible Force Meets the Immovable Object
Type: Book
ISBN: 978-1-83867-951-4

Article
Publication date: 1 April 2024

Zoubeir Lafhaj, Slim Rebai, Olfa Hamdi, Rateb Jabbar, Hamdi Ayech and Pascal Yim

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of…

Abstract

Purpose

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of construction project monitoring and management. This research aims to enhance efficiency, transparency and trust within the dynamic and collaborative environment of the construction industry by leveraging the decentralized, secure and immutable nature of blockchain technology.

Design/methodology/approach

This paper employs a comprehensive approach encompassing the formulation of the COPULA model, the development of a digital solution using the ethereum blockchain and extensive testing to assess performance in terms of execution cost, time, integrity, immutability and security. A case analysis is conducted to demonstrate the practical application and benefits of blockchain technology in real-world construction project monitoring scenarios.

Findings

The findings reveal that the COPULA framework effectively addresses critical issues such as centralization, privacy and security vulnerabilities in construction project management. It facilitates seamless data exchange among stakeholders, ensuring real-time transparency and the creation of a tamper-proof communication channel. The framework demonstrates the potential to significantly enhance project efficiency and foster trust among all parties involved.

Research limitations/implications

While the study provides promising insights into the application of blockchain technology in construction project monitoring, future research could explore the integration of COPULA with existing project management methodologies to broaden its applicability and impact. Further investigations into the solution’s scalability and adaptation to various construction project types and sizes are also suggested.

Originality/value

This research offers a comprehensive blockchain solution specifically tailored for the construction industry. Unlike prior studies focusing on theoretical aspects, this paper presents a practical, end-to-end solution encompassing model formulation, digital implementation, proof-of-concept testing and validation analysis. The COPULA framework marks a significant advancement in the digital transformation of construction project monitoring, providing a novel approach to overcoming longstanding industry challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 11 March 2024

Anna Hallberg, Ulrika Winblad and Mio Fredriksson

The build-up of large-scale COVID-19 testing required an unprecedented effort of coordination within decentralized healthcare systems around the world. The aim of the study was to…

Abstract

Purpose

The build-up of large-scale COVID-19 testing required an unprecedented effort of coordination within decentralized healthcare systems around the world. The aim of the study was to elucidate the challenges of vertical policy coordination between non-political actors at the national and regional levels regarding this policy issue, using Sweden as our case.

Design/methodology/approach

Interviews with key actors at the national and regional levels were analyzed using an adapted version of a conceptualization by Adam et al. (2019), depicting barriers to vertical policy coordination.

Findings

Our results show that the main issues in the Swedish context were related to parallel sovereignty and a vagueness regarding responsibilities and mandates as well as complex governmental structures and that this was exacerbated by the unfamiliarity and uncertainty of the policy issue. We conclude that understanding the interaction between the comprehensiveness and complexity of the policy issue and the institutional context is crucial to achieving effective vertical policy coordination.

Originality/value

Many studies have focused on countries’ overall pandemic responses, but in order to improve the outcome of future pandemics, it is also important to learn from more specific response measures.

Details

Journal of Health Organization and Management, vol. 38 no. 9
Type: Research Article
ISSN: 1477-7266

Keywords

1 – 10 of 128