Article
Publication date: 3 October 2008

Peter E.D. Love, Peter R. Davis, David J. Edwards and David Baccarini

Choosing the appropriate procurement system for construction projects is a complex and challenging task for clients particularly when professional advice has not been sought. To…

8229

Abstract

Purpose

Choosing the appropriate procurement system for construction projects is a complex and challenging task for clients particularly when professional advice has not been sought. To assist with the decision‐making process, a range of procurement selection tools and techniques have been developed by both academic and industry bodies. Public sector clients in Western Australia (WA) remain uncertain about the pairing of procurement method to bespoke construction project and how this decision will ultimately impact upon project success. This paper seeks to examine “how and why” a public sector agency selected particular procurement methods.

Design/methodology/approach

An analysis of two focus group workshops (with 18 senior project and policy managers involved with procurement selection) is reported upon.

Findings

The traditional lump sum (TLS) method is still the preferred procurement path even though alternative forms such as design and construct, public‐private‐partnerships could optimize the project outcome. Paradoxically, workshop participants agreed that alternative procurement forms should be considered, but an embedded culture of uncertainty avoidance invariably meant that TLS methods were selected. Senior managers felt that only a limited number of contractors have the resources and experience to deliver projects using the non‐traditional methods considered.

Practical implications

The research identifies a need to develop a framework that public sector clients can use to select an appropriate procurement method. Learning from previous experiences with regard to procurement selection will further provide public sector clients with knowledge about how to best deliver their projects.

Originality/value

The paper adds insight as to how public sector agencies select particular procurement methods.

Details

International Journal of Public Sector Management, vol. 21 no. 7
Type: Research Article
ISSN: 0951-3558

Keywords

Article
Publication date: 6 April 2010

Peter E.D. Love, Peter R. Davis and David Baccarini

The determination of the most appropriate procurement system for a capital works project is a challenging task for public sector clients considering the array of assessment…

1064

Abstract

Purpose

The determination of the most appropriate procurement system for a capital works project is a challenging task for public sector clients considering the array of assessment criteria that are considered and the procurement methods that are available. This is particularly pertinent to the Western Australian public sector where there has been a propensity to use traditional lump sum as the default procurement solution despite knowing that the selection of an inappropriate procurement method may lead to cost and time overruns, claims, and disputes on projects. This paper aims to present a six‐step procurement method evaluation approach that requires public sector agencies to consider in detail an array of options so as to obtain value for money.

Design/methodology/approach

A procurement evaluation approach is developed and is examined using a focus group of 12 participants comprising a public sector client, project team and key stakeholders. The focus group was used to examine the developed approach in the context of a real‐life capital works project.

Findings

The procurement method evaluation approach was deemed to be pragmatic and enabled decision makers to re‐evaluate outcomes from previous steps in the process. All focus group participants stated the six step process enabled a recommendation that was grounded in reflection and detailed evaluation.

Practical implications

The developed procurement approach has enabled the public sector client to evaluate the way in which it views procurement method selection and examines how “value for money” is obtained.

Originality/value

The six‐step procurement approach makes use of quantitative and qualitative techniques and is reliant on discourse and reflection in making a procurement method recommendation. Consequently, the approach enables public sector clients to account for the complexities often associated with procurement selection.

Details

International Journal of Public Sector Management, vol. 23 no. 3
Type: Research Article
ISSN: 0951-3558

Keywords

Article
Publication date: 29 May 2009

Peter R. Davis, Peter E.D. Love and David Baccarini

Traditional Lump Sum (TLS) methods have been the primary procurement method within Australia. Yet, their use is beginning to wane in states such as: Queensland, New South Wales…

4397

Abstract

Purpose

Traditional Lump Sum (TLS) methods have been the primary procurement method within Australia. Yet, their use is beginning to wane in states such as: Queensland, New South Wales and Victoria where Design and Construct, Construction Management and hybrids thereof have become the norm. Considering the demands of clients, the increasing propensity to use non‐traditional methods, the quality of drawings that are being produced, and the role of software applications such as Computer‐Aided Design in directly generating quantities, this paper seeks to examine the role Bills of Quantities (BoQs) serve and how effective they are as a pre‐contract and post‐contract tool.

Design/methodology/approach

Only limited empirical research has addressed the role and effectiveness of BoQs, particularly in Australia. With this in mind, the research adopted an exploratory approach to gain insights from industry practitioners about BoQs. A questionnaire survey was developed from the literature and used to solicit the opinions of practitioners about their role and effectiveness as a pre‐contract and post‐contract tool.

Findings

The distributed questionnaire survey resulted in 86 responses from industry practitioners – quantity surveyors, building contractors, and project managers. The findings fundamentally reveal that the use of Bill of Quantities prepared in accordance with the standard method of measurement is on the decline and only useful as a tool for post‐contract control.

Originality/value

The research has revealed that there is a need for industry to embrace alternative forms of measuring quantities in building projects. Abridged bills and builders' quantities are being increasingly demanded in Australia. Thus, it is suggested that this demand could drive the need for alternative forms of pricing in building projects and lead to the increasing use of non‐traditional methods of measurement.

Details

Structural Survey, vol. 27 no. 2
Type: Research Article
ISSN: 0263-080X

Keywords

Article
Publication date: 1 May 2004

David Baccarini, Geoff Salm and Peter E.D. Love

Information technology (IT) projects are renowned for their high failure rate. Risk management is an essential process for the successful delivery of IT projects. In‐depth…

18861

Abstract

Information technology (IT) projects are renowned for their high failure rate. Risk management is an essential process for the successful delivery of IT projects. In‐depth interviews with IT professionals from leading firms in Western Australia were undertaken to determine how IT risks were managed in their projects. The respondents ranked 27 IT risks in terms of likelihood and consequences to identify the most important risks. The top five risks, in order, were: personnel shortfalls; unreasonable project schedule and budget; unrealistic expectations; incomplete requirements; and diminished window of opportunity due to late delivery of software. The respondents overwhelmingly applied the treatment strategy of risk reduction to manage these risks. Furthermore, these strategies were primarily project management processes, rather than technical processes. This demonstrates that project management is a risk management strategy. Scope, quality management, and human resource management were solutions applied to several risks. In particular, managing stakeholders’ expectations is a specific risk treatment that helps to manage several key IT risks.

Details

Industrial Management & Data Systems, vol. 104 no. 4
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 11 January 2022

Michael Buhagiar, Julien Pollack and Sharon Coyle

Scholars are increasingly acknowledging the importance of conversations in the management of complex projects. Defining dialectics as “the art of purposeful conversation”, this…

Abstract

Purpose

Scholars are increasingly acknowledging the importance of conversations in the management of complex projects. Defining dialectics as “the art of purposeful conversation”, this paper aims to rationalise the somewhat disorganised field of dialectics by developing a categoreal scheme.

Design/methodology/approach

The authors refer to the current state of research into the conversational aspects of complex projects, and examine the historical development of, and philosophical and scholarly commentary on, the dialectical method.

Findings

The categories the authors propose are the Socratic, Conversational, Fichtean and Peircean. They differ in relation to the subject matter of the dialectic; their vulnerability to environmental influences; the degree of structure they require for optimal performance; and the situations in which they might most profitably be applied.

Research limitations/implications

A single categoreal scheme is rarely the last word, and the authors invite other scholars to explore the field in a similar way.

Practical implications

The scheme proposed here is intended to enhance the project manager's approach to conversations, by referring to the specific virtues and limitations of each of the categories.

Social implications

The informed use of dialectics may help to ameliorate the significant damage done to organisations and economies around the world by failed and underperforming projects.

Originality/value

The authors present the first categorisation of the field, with the aim of equipping the practitioner to think about dialectical approaches in a more systematic way.

Details

International Journal of Managing Projects in Business, vol. 15 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 9 November 2015

Som Sekhar Bhattacharyya, Sumi Jha and Christo Fernandes

The purpose of this paper is to determine the antecedents of speed to market (SM). Further, a model was established on SM with the organizational variables of enacting…

Abstract

Purpose

The purpose of this paper is to determine the antecedents of speed to market (SM). Further, a model was established on SM with the organizational variables of enacting organizational environment (EOE), organizational infrastructure (OI), project complexity (PC) and creation of collective mind (CCM).

Design/methodology/approach

This research was based on structured survey questionnaire data of 415 managers from private and public sector firms in India. The data analysis was carried out with SPSS 20 and AMOS 18 for structural equation modeling.

Findings

Research results indicated that the exogenous factors were EOE and OI. PC and CCM were the intervening variables and SM was the endogenous variables. The result indicated that there was significant positive relationship between EOE and PC, EOE and CCM. There was also a significant positive relationship between the variables EOE with PC, OI with PC and CCM with PC. Finally there existed a significant positive relationship between PC and SM and CCM and SM.

Research limitations/implications

This research study was one of the first research studies developing a model on SM with the exogenous variables of EOE and OI and the intervening variables of PC and CCM.

Practical implications

The managers in both public and private sector organizations looking to create and sustain competitive advantage by providing a fast and apt response to market demand by product development can use the inputs from the study. Organizations should be developed in such a manner to enrich the EOE and have a agile and flexible OI. This would help organizations in having CCM and undertake PC. A well-coordinated effort encompassing all these would help the organization to have a fast and steady SM.

Originality/value

This research was one of the very first studies relating SM with EOE, OI, PC and CCM in an emerging market context.

Details

Asia Pacific Journal of Marketing and Logistics, vol. 27 no. 5
Type: Research Article
ISSN: 1355-5855

Keywords

Article
Publication date: 13 January 2012

Phil Nixon, Megan Harrington and David Parker

This paper seeks to review the current literature in order to explore how performance of leadership in project management determines project outcomes. The specific causes of…

28909

Abstract

Purpose

This paper seeks to review the current literature in order to explore how performance of leadership in project management determines project outcomes. The specific causes of project success or failure have been an area of much debate in the project management literature. Performance of leadership has been cited as a critical success factor, determining either the success or failure of a project.

Design/methodology/approach

An extensive literature review has been undertaken to explore our understanding of how project leadership performance impacts on project outcome.

Findings

The mechanisms through which leadership may impact on outcomes are considered. Implications include the need for project managers to prioritize training in leadership skills, and the need for continuous professional improvement to enhance leadership outcomes. No single leadership model is appropriate throughout the duration of the project. Performance, therefore, must be modified to align with the stages of the project duration.

Research limitations/implications

While the literature has given meaningful insights into leadership of projects, there has been little research into performance management of project leadership. The work is the basis of developing a research agenda and establishing a conceptual framework. The opportunity exists, based on this work, for carrying out research on project leadership performance and its effect on project outcomes.

Practical implications

Insightful learning has been achieved into project leadership and the failing of practitioners in appropriate training and development at various stages of the projects life cycle.

Social implications

Projects and project‐based management, delivered nationally and internationally, are of significant importance to organizations. Increasing understanding of the implications of leadership performance, therefore, is of critical importance.

Originality/value

The literature review has identified significant limitation in project leadership performance management. It is anticipated that this work will trigger further research.

Details

International Journal of Productivity and Performance Management, vol. 61 no. 2
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 25 August 2021

Michael C.P. Sing, David J. Edwards, Arthur W.T. Leung, Henry Liu and Chris J. Roberts

The accuracy and reliability of subjectively assessing a construction project's complexity at the pre-construction stage is questionable and relies upon the project manager's…

Abstract

Purpose

The accuracy and reliability of subjectively assessing a construction project's complexity at the pre-construction stage is questionable and relies upon the project manager's tacit experiences, knowledge and background. The purpose of this paper is to develop a scientifically robust analytical approach by presenting a novel classification mechanism for defining the level of project complexity in terms of work contents (WCs), scope, building structures (BSs) and site conditions.

Design/methodology/approach

Empiricism is adopted to deductively analyze variables obtained from secondary data within extant literature and primary project data to develop project type classifications. Specifically, and from an operational perspective, a two-stage “waterfall process” was adopted. In stage one, the research identified 56 variables affecting project complexity from literature and utilized a structured questionnaire survey of 100 project managers to measure the relevance of these. A total of 27 variables were revealed to be significant and exploratory factor analysis (EFA) is adopted to cluster these variables into six-factor thematic groups. In stage two, data from 62 real-life projects (including the layout and structural plans) were utilized for computing the factor score using the six-factor groups. Finally, hierarchical cluster analysis (HCA) is adopted to classify the projects into collected distinctive groups and each of a similar nature and characteristics.

Findings

The developed theoretical framework (that includes a novel complex index) provides a robust “blueprint platform” for main contractors to compile their project complexity database. The research outputs enable project managers to generate a more accurate picture of complexity at the pre-construction stage.

Originality/value

While numerous research articles have provided a comprehensive framework to define project complexity, scant empirical works have assessed it at the pre-construction stage or utilized real-life project samples to classify it. This research addresses this knowledge gap within the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 November 2019

Juan Maria Sagarna Garcia and David Pereira Jerez

The purpose of this paper is to provide insights about the approaches and techniques of professionals that nowadays are designing Digital Products and Services (DPS) in the…

Abstract

Purpose

The purpose of this paper is to provide insights about the approaches and techniques of professionals that nowadays are designing Digital Products and Services (DPS) in the European agriculture. The emphasis is paid on the integration of end-users and participatory approaches such as agile, considering its current influence.

Design/methodology/approach

A survey was conducted to professionals of businesses and entities from 14 European countries. A balanced sample of replies was achieved between private–public background, size of the business or experience of experts. Afterwards, the collection of answers and the opinions of professionals were compared with the state of the art referred in the literature. It allowed checking its soundness and critically discusses the results.

Findings

From the raw analysis of responses, professionals show awareness about the importance of end-user involvement and they are eager to incorporate innovative farmers and early adopters to collect the best requirements for products and services. They also declare knowledge and uptake in their companies of new approaches, such as agile. Confronting results with literature, the discussion highlights some inconsistencies and possibilities for leveraging. Types of end-users considered should be enlarged. Their superficial participation must also be avoided.

Originality/value

There is a lack of research on procedures for projects in agro-food sector. Due to the momentum in the digital transformation of agriculture, there are many project teams working in developing DPS and are relevant to discuss about proper methodologies for improving success.

Article
Publication date: 5 May 2020

De-Graft Owusu-Manu, Frank Ato Ghansah, Amos Darko, Richard Ohene Asiedu and David John Edwards

The purpose of this study is to investigate the insurable risks that impacted the operations on complex construction projects in developing countries using Ghana as a case study.

Abstract

Purpose

The purpose of this study is to investigate the insurable risks that impacted the operations on complex construction projects in developing countries using Ghana as a case study.

Design/methodology/approach

In this study, structured questionnaires were used to collect relevant information from the top management of construction and insurance firms in Ghana, comprising 50 industry professionals. The study adopted the χ2 and independent samples’ t test to interpret the responses from participants.

Findings

The study revealed the major risks that severely impacted the operations on complex construction projects, including strikes and labour disputes, long waiting time for approval of test samples, damages to property during construction, delay in payment to contractor for work done, poor construction method, pressure to deliver project on an accelerated schedule, labour shortage, permits delayed or take longer than expected, inaccurate materials estimating, change in weather pattern, low productivity of subcontractors and inadequate contractor experience.

Practical implications

The study is expected to contribute to increase in the awareness of the insurable risks and policies that project participants are exposed to, which will serve as a decision-making tool for contract formation.

Originality/value

This study assists in managing construction and insurance firms to note the major risk in managing a complex construction project. In addition to knowing the major risks identified, the study investigates the insurable risk by managing both construction and insurance firms.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of 26