Search results
1 – 10 of 111
ASTM D01.56 on Printing Inks, a subcommittee of standards‐writing Committee D‐1 on Paint and Related Coatings and Materials, has announced the approval of five standard…
Abstract
ASTM D01.56 on Printing Inks, a subcommittee of standards‐writing Committee D‐1 on Paint and Related Coatings and Materials, has announced the approval of five standard test methods for the evaluation of printing inks and prints.
L. Bibby, S. Austin and D. Bouchlaghem
Over recent years there has been a significant drive away from traditional procurement routes where contractors find themselves with an increasing responsibility for the…
Abstract
Purpose
Over recent years there has been a significant drive away from traditional procurement routes where contractors find themselves with an increasing responsibility for the control of the design – a process they have had little experience in managing. Yet this is an area of significant opportunity for those contractors who can adapt quickly and effectively to the changing construction market. However, many current processes are insufficient to manage today's demanding and fast‐moving projects. This paper aims to address this issue
Design/methodology/approach
The paper reflects on the deployment of a design management training initiative to improve performance in a major UK civil and building design and construction company. It investigates the impact of the training initiative, critical practices and a suite of 25 tools on design management performance across the company. The methodology included a structured questionnaire, design management maturity assessment, semi‐structured interviews and a case study.
Findings
The paper highlights benefits delivered by the initiative as well as the practices and tools crucial to successful design management. A range of implementation barriers that affect the success of design management practices is also highlighted together with strategies used on a design and build project to overcome them.
Originality/value
The paper should be helpful to those involved in design management and the development of tools and practices to improve the performance of companies and project teams.
Details
Keywords
This study aims to examine the effects of participating in physical activities on female college graduates' starting salaries. We used an instrumental variable (IV…
Abstract
This study aims to examine the effects of participating in physical activities on female college graduates' starting salaries. We used an instrumental variable (IV) approach to address the possible endogeneity problem. By using the Taiwan Higher Education Dataset, we discovered that participating in physical activities during college increased an individual's earnings by 3.06%. The significant positive effect of physical activity on salary demonstrated in this study is consistent with that in other relevant studies. This study also discovered that both the intensity and the persistence of participation in physical activities affected salary outcomes. Individuals earned 0.17%–2.41% more if they exercised for an additional hour per week, suggesting the importance of the intensity of participation in physical activities. In addition, persistent participation in physical activities was associated with a 3.08% higher salary.
Details
Keywords
Sammy K.M. Wan and Mohan M. Kumaraswamy
Coordinating interdependencies between concurrent activities is a special challenge in managing increasingly complex building services projects. Effective coordination at…
Abstract
Purpose
Coordinating interdependencies between concurrent activities is a special challenge in managing increasingly complex building services projects. Effective coordination at the pre‐installation stage is key to minimising field conflicts between building services systems. This study aims to investigate the significant causes of production shortcomings traceable to the pre‐installation stage, and to what extent these in turn probably contribute to higher volumes of construction debris.
Design/methodology/approach
Following relevant previous research and preliminary studies of production shortcomings in the building services subsector in Hong Kong, a series of structured interviews with practitioners were formulated and analysed. The findings lead to deductive reasoning in developing suitable approaches for this subsector.
Findings
The study reveals that “poor coordination among different trades and processes”, and “frequent design changes and/or errors” are seen as two of the major causes of production shortcomings in the pre‐installation stage. This paper proposes and discusses improvement strategies based on conceptual models of an “intra‐inter dependent teamwork concept”, a “dynamic coordination buffer” and a “BS coordination facilitator” in order to reduce the identified critical causes.
Research limitations/implications
Although further research is needed, the findings in this paper can be a useful reference for other regions as the study methodology may be replicated.
Originality/value
In the search for solutions and improvements, a number of proven industrial management principles are incorporated in new conceptual models. These are expected to help alleviate the identified causes as critical design or related uncertainties are resolved through earlier coordination. This should in turn also reduce the volume of construction debris that can arise from current shortcomings in the pre‐installation stage of building services.
Details