Search results
1 – 10 of over 2000Mostafa Abbaszadeh, AliReza Bagheri Salec and Shurooq Kamel Abd Al-Khafaji
The space fractional PDEs (SFPDEs) play an important role in the fractional calculus field. Proposing a high-order, stable and flexible numerical procedure for solving SFPDEs is…
Abstract
Purpose
The space fractional PDEs (SFPDEs) play an important role in the fractional calculus field. Proposing a high-order, stable and flexible numerical procedure for solving SFPDEs is the main aim of most researchers. This paper devotes to developing a novel spectral algorithm to solve the FitzHugh–Nagumo models with space fractional derivatives.
Design/methodology/approach
The fractional derivative is defined based upon the Riesz derivative. First, a second-order finite difference formulation is used to approximate the time derivative. Then, the Jacobi spectral collocation method is employed to discrete the spatial variables. On the other hand, authors assume that the approximate solution is a linear combination of special polynomials which are obtained from the Jacobi polynomials, and also there exists Riesz fractional derivative based on the Jacobi polynomials. Also, a reduced order plan, such as proper orthogonal decomposition (POD) method, has been utilized.
Findings
A fast high-order numerical method to decrease the elapsed CPU time has been constructed for solving systems of space fractional PDEs.
Originality/value
The spectral collocation method is combined with the POD idea to solve the system of space-fractional PDEs. The numerical results are acceptable and efficient for the main mathematical model.
Details
Keywords
Guodong Ni, Qi Zhang, Yaqi Fang, Ziyao Zhang, Yaning Qiao, Wenshun Wang and Yongliang Deng
The purpose of this paper is to explore the correction mechanism of resilient safety culture on new generation of construction workers (NGCWs)' unsafe behavior and test the…
Abstract
Purpose
The purpose of this paper is to explore the correction mechanism of resilient safety culture on new generation of construction workers (NGCWs)' unsafe behavior and test the multiple mediation effects of job crafting and perceived work meaningfulness based on the context of Chinese construction industry in order to find a new way to effectively correct the NGCWs' unsafe behavior.
Design/methodology/approach
A theoretical model of correction mechanism was established based on literature research and theoretical deduction. An empirical study was employed based on confirmatory factor analysis and regression analysis with a sample of 404 NGCWs in China.
Findings
The results indicated that resilient safety culture can effectively correct NGCWs' unsafe behavior through job crafting and perceived work meaningfulness. Job crafting and perceived work meaningfulness can play independent and serial mediating roles between resilient safety culture and unsafe behavior.
Research limitations/implications
Research results only represent a short-term law about the correction mechanism of NGCWs' unsafe behavior based on a questionnaire study from China's construction industry. It is necessary to continue to implement a longitudinal study to test it in a relatively long period in future research. The findings also need to be verified based on the young construction workers in other countries.
Practical implications
This study provides a theoretical basis and feasible management reference for construction enterprises in China to correct NGCWs' unsafe behavior from the perspective of resilient safety culture. Furthermore, the construction of resilient safety culture in construction enterprises can help NGCWs better carry out job crafting and perceive the meaning of work.
Originality/value
This paper clarifies the correction mechanism of resilient safety culture on unsafe behavior of NGCWs, and further tests the independent mediating roles and a serial mediating role of job crafting and perceived work meaningfulness between resilient safety culture and unsafe behavior, which fills the research gap about the influence mechanism of resilient safety culture on young construction workers' unsafe behavior and enriches the theoretical system of unsafe behavior correction of construction workers.
Details
Keywords
Martin Evans, Peter Farrell, Emad Elbeltagi and Helen Dion
The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International…
Abstract
Purpose
The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International businesses, multinational AEC organisations, technical professionals, project and portfolio management organisations face global connectivity challenges between business units, especially during the outbreak of novel coronavirus pandemic, to manage construction megaprojects (CMPs). That raises the need to manage global connectivity as a main strategic goal of global organisations. This paper aims to investigate barriers to integrating lean construction (LC) practices and integrated project delivery (IPD) on CMPs towards the global integrated delivery (GID) transformative initiatives and develop future of work (FOW) global initiatives in contemporary multinational AEC organisations.
Design/methodology/approach
A two-stage quantitative and qualitative research approach is adopted. The qualitative research methodology consists of a literature review to appraise barriers to integrating LeanIPD&GID on CMPs. Barriers are arranged into six-factor clusters (FCs), with a conceptualisation of LeanIPD&GID, GID strategy placements and FOW global initiatives with multiple validations. This analysis also involved semi-structured interviews and focus group techniques. Stage two consisted of an empirical questionnaire survey that shaped the foundation of analysis and findings of 230 respondents from 23 countries with extensive cosmopolitan experience in the construction of megaprojects. The survey examined a set of 28 barriers to integrating LeanIPD&GID on CMPs resulting from a detailed analysis of extant literature after validation. Descriptive and inferential statistical tests were exploited for data analysis, percentage scoring analysis, principal component analysis (PCA) and eigenvalues were used to elaborate on clustered factors.
Findings
The research conceptualised LeanIPD&GID principles and proposed GID strategy placements for LeanIPD&GID transformative initiatives and FOW global initiatives. It concluded that the most significant barriers to integration of LeanIPD&GID on CMPs are “lack of mandatory building information modelling (BIM) and LC industry standards and regulations by governments”, “lack of involvement and support of governments”, “high costs of BIM software licenses”, “resistance of industry to change from traditional working practices” and “high initial investment in staff training costs of BIM”. PCA revealed the most significant FCs are “education and knowledge-related barriers”, “project objectives-related barriers” and “attitude-related barriers”. Awareness of BIM in the Middle East and North Africa (MENA) region is higher than LC and LC awareness is higher than IPD knowledge. Whilst BIM adoption in the MENA region is higher than LC; the second is still taking its first steps, whilst IPD has little implementation. LeanBIM is slightly integrated, whilst LeanIPD integration is almost not present.
Originality/value
The research findings, conclusion and recommendation and proposed GID strategy placements for LeanIPD&GID transformative initiatives to integrating LeanIPD&GID on CMPs. This will allow project key stakeholders to place emphasis on tackling LeanIPD&GID barriers identified in this research and commence GID strategies. The study has provided effective practical strategies for enhancing the integration of LeanIPD&GID transformative initiatives on CMPs.
Details
Keywords
Yuanwen Han, Jiang Shen, Xuwei Zhu, Bang An and Xueying Bao
This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects…
Abstract
Purpose
This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects, reveal the interaction mechanism of interface management risk and provide theoretical support for project managers to develop appropriate interface management risk response strategies.
Design/methodology/approach
This paper introduces the association rule mining technique to improve the complex network modeling method. Taking China as an example, based on the stakeholder perspective, the risk factors and significant accident types of interface management of high-speed rail construction projects are systematically identified, and a database is established. Then, the Apriori algorithm is used to mine and analyze the strong association rules among the factors in the database, construct the complex network, and analyze its topological characteristics to reveal the interaction mechanism of the interface management risk of high-speed rail construction projects.
Findings
The results show that the network is both scale-free and small-world, implying that construction accidents are not random events but rather the result of strong interactions between numerous interface management risks. Contractors, technical interfaces, mechanical equipment, and environmental factors are the primary direct causal factors of accidents, while owners and designers are essential indirect causal factors. The global importance of stakeholders such as owners, designers, and supervisors rises significantly after considering the indirect correlations between factors. This theoretically explains the need to consider the interactions between interface management risks.
Originality/value
The interaction mechanism between interface management risks is unclear, which is an essential factor influencing the decision of risk response measures. This study proposes a new methodology for analyzing interface management risk response strategies that incorporate quantitative analysis methods and considers the interaction of interface management risks.
Details
Keywords
Arti Sahu and S. Shanmugapriya
This research proposes a viable method of slab and shore load computation for the partial striking technique utilized in high-rise construction projects to optimize the use of…
Abstract
Purpose
This research proposes a viable method of slab and shore load computation for the partial striking technique utilized in high-rise construction projects to optimize the use of horizontal formwork. The proposed Partial Striking Simplified Method (PSSM) is designed to be utilized by industry practitioners to schedule the construction operations of casting floors in order to control the formwork costs incurred throughout the completion of a project.
Design/methodology/approach
The article presents the PSSM for calculating slab and shore loads in multi-story building construction. It introduces the concept of “clearing before striking,” where shore supports are partially removed after a few days of pouring fresh concrete. The PSSM procedure is validated through numerical analysis and compared to other simplified approaches. Additionally, a user-friendly Python program based on the PSSM procedure is developed to explore the capability of the PSSM procedure and is used to study the variations in slab load, shoring level, concrete grade and cycle time.
Findings
The study successfully developed a more efficient and reliable method for estimating the loads on shores and slabs using partial striking techniques for multi-story building construction. Compared to other simplified approaches, the PSSM procedure is simpler and more precise, as demonstrated through numerical analysis. The mean of shore and slab load ratios are 1.08 and 1.07, respectively, which seems to have a slight standard deviation of 0.29 and 0.21 with 3D numerical analysis. The Python program developed for load estimation is effective in exploring the capability of the proposed PSSM procedure. The Python program's ability to identify the floor under maximum load and determine the specific construction stage provides valuable insights for multi-story construction, enabling informed decision-making and optimization of construction methods.
Practical implications
High-rise construction in Indian cities is booming, though this trend is not shared by all the country's major metropolitan areas. The growing construction sector in urban cities demands rapid construction for efficient utilization of formwork to control the construction costs of project. The proposed procedure is the best option to optimize the formwork construction cost, construction cycle time, the suitable formwork system with optimum cost, concrete grade for the adopted level of shoring in partaking and many more.
Originality/value
The proposed PSSM reduces the calculation complexity of the existing simplified method. This is done by considering the identical slab stiffness and identical shore layout for uniform load distribution throughout the structure. This procedure utilizes a two-step load distribution calculation for clearing phase. Initially, the 66% prop load of highest floor level is distributed uniformly over the lower interconnected slabs. In the second step, the total prop load is removed equally from all slabs below it. This makes the load distribution user-friendly for the industry expert.
Details
Keywords
Junwei Zheng, Yu Gu, Peikai Li, Lan Luo and Guangdong Wu
The development of project managers and leadership has been highlighted as crucial for improving project success and performance, resulting in a rise of interest in project…
Abstract
Purpose
The development of project managers and leadership has been highlighted as crucial for improving project success and performance, resulting in a rise of interest in project leadership research over the last two decades. While several qualitative reviews have been conducted, there have been limited quantitative and systematic reviews on project leadership. This study fills this gap by portraying the knowledge landscape and tracking the evolution of project leadership research from 1998 to 2022 through bibliometric approaches.
Design/methodology/approach
Based on 816 records, including 793 articles extracted and selected from the Web of Science database and specific journals, and 23 articles selected from three non-SCI/SSCI indexed journals, the authors used CiteSpace and bibliometrix R-package to depict visualizations of the trajectory of co-cited references, the landscape of co-occurred keywords and emerging trends in project leadership via reference co-citation analysis, keyword co-occurrence analysis and thematic mapping.
Findings
The bibliometric analyses enabled the authors to understand the conceptual aspects of project leadership and its theoretical background. Three stages of the intellectual bases were identified and tracked: the infancy phase (1998–2007), the growth phase (2008–2014) and the new development phase (2015–2022). The results of keyword co-occurrence analysis indicated that the research focus evolved from investigating traits and competences to examining the effects of traditional leadership behaviors, and then considering context-specific leadership. The findings of thematic mapping and theoretical interpretation illustrate the potential directions of the competence comparison, new and appropriate leadership, and the interaction between leadership and context.
Originality/value
This study advanced the field by providing a systematic review of project leadership, developing potential future directions for project leadership research and providing practical implications for career development and training.
Details
Keywords
This study collected the bibliographic data of 2034 journal articles published in 2000–2021 from Web of Science (WoS) core collection database and adopted two bibliometric…
Abstract
Purpose
This study collected the bibliographic data of 2034 journal articles published in 2000–2021 from Web of Science (WoS) core collection database and adopted two bibliometric analysis methods, namely historiography and keyword co-occurrence, to identify the evolution trend of construction risk management (CRM) research topics.
Design/methodology/approach
CRM has been a key issue in construction management research, producing a big number of publications. This study aims to undertake a review of the global CRM research published from 2000 to 2021 and identify the evolution of the research topics relating to CRM.
Findings
This study found that risk analysis methods have shifted from simply ranking risks in terms of their relative importance or significance toward examining the interrelationships among risks, and that the objects of CRM research have shifted from generic construction projects toward specified types of construction projects (e.g. small projects, underground construction projects, green buildings and prefabricated projects). In addition, researchers tend to pay more attention to an individual risk category (e.g. political risk, safety risk and social risk) and integrate CRM into cost, time, quality, safety and environment management functions with the increasing adoption of various information and communication technologies.
Research limitations/implications
This study focused on the journal articles in English in WoS core collection database only, thus excluding the publications in other languages, not indexed by WoS and conference proceedings. In addition, the historiography focused on the top documents in terms of document strength and thus ignored the role of the documents whose strengths were a little lower than the threshold.
Originality/value
This review study is more inclusive than any prior reviews on CRM and overcomes the drawbacks of mere reliance on either bibliometric analysis results or subjective opinions. Revealing the evolution process of the CRM knowledge domain, this study provides an in-depth understanding of the CRM research and benefits industry practitioners and researchers.
Details
Keywords
Jeffrey Boon Hui Yap, Karen Pei Han Lee and Chen Wang
High rate of accidents continue to plague the construction industry. The advancements in safety technologies can ameliorate construction health and safety (H&S). This paper aims…
Abstract
Purpose
High rate of accidents continue to plague the construction industry. The advancements in safety technologies can ameliorate construction health and safety (H&S). This paper aims to explore the use of emerging technologies as an effective solution for improving safety in construction projects.
Design/methodology/approach
Following a detailed literature review, a questionnaire survey was developed encompassing ten technologies for safety management and ten safety enablers using technologies in construction. A total of 133 responses were gathered from Malaysian construction practitioners. The collected quantitative data were subjected to descriptive and inferential statistical analyses to determine the meaningful relationships between the variables.
Findings
Findings revealed that the most effective emerging technologies for safety management are: building information modelling (BIM), wearable safety technologies and robotics and automation (R&A). The leading safety enablers are related to improve hazard identification, reinforce safety planning, enhance safety inspection, enhance safety monitoring and supervision and raise safety awareness.
Practical implications
Safety is immensely essential in transforming the construction industry into a robustly developed industry with high safety and quality standards. The adoption of safety technologies in construction projects can drive the industry towards the path of Construction 4.0.
Originality/value
The construction industry has historically been slow to adopt new technology. This study contributes to advancing the body of knowledge in the area of incorporating emerging technologies to further construction safety science and management in the context of the developing world. By taking cognisance of the pertinent emerging technologies for safety management and the safety enablers involved, construction safety can be enhanced using integrated technological solutions.
Details
Keywords
As climate change impacts residential life, people typically use heating or cooling appliances to deal with varying outside temperatures, bringing extra electricity demand and…
Abstract
Purpose
As climate change impacts residential life, people typically use heating or cooling appliances to deal with varying outside temperatures, bringing extra electricity demand and living costs. Water is more cost-effective than electricity and could provide the same body utility, which may be an alternative choice to smooth electricity consumption fluctuation and provide living cost incentives. Therefore, this study aims to identify the substitute effect of water on the relationship between climate change and residential electricity consumption.
Design/methodology/approach
This study identifies the substitute effect of water and potential heterogeneity using panel data from 295 cities in China over the period 2004–2019. The quantile regression and the partially linear functional coefficient model in this study could reduce the risks of model misspecification and enable detailed identification of the substitution mechanism, which is in line with reality and precisely determines the heterogeneity at different consumption levels.
Findings
The results indicate that residential water consumption can weaken the impact of cooling demand on residential electricity consumption, especially in low-income regions. Moreover, residents exhibited adaptive asymmetric behaviors. As the electricity consumption level increased, the substitute effects gradually get strong. The substitute effects gradually strengthened when residential water consumption per capita exceeds 16.44 tons as the meeting of the basic life guarantee.
Originality/value
This study identifies the substitution role of water and heterogeneous behaviors in the residential sector in China. These findings augment the existing literature and could aid policymakers, investors and residents regarding climate issues, risk management and budget management.
Details
Keywords
Jingkuang Liu, Yuqing Li, Ying Li, Chen Zibo, Xiaotong Lian and Yingyi Zhang
The purpose of this study is to discuss the principles and factors that influence the site selection of emergency medical facilities for public health emergencies. This paper…
Abstract
Purpose
The purpose of this study is to discuss the principles and factors that influence the site selection of emergency medical facilities for public health emergencies. This paper discusses the selection of the best facilities from the available facilities, proposes the capacity of new facilities, presents a logistic regression model and establishes a site selection model for emergency medical facilities for public health emergencies in megacities.
Design/methodology/approach
Using Guangzhou City as the research object, seven alternative facility points and the points' capacities were preset. Nine demand points were determined, and two facility locations were selected using genetic algorithms (GAs) in MATLAB for programing simulation and operational analysis.
Findings
Comparing the results of the improved GA, the results show that the improved model has fewer evolutionary generations and a faster operation speed, and that the model outperforms the traditional P-center model. The GA provides a theoretical foundation for determining the construction location of emergency medical facilities in megacities in the event of a public health emergency.
Research limitations/implications
First, in this case study, there is no scientific assessment of the establishment of the capacity of the facility point, but that is a subjective method based on the assumption of the capacity of the surrounding existing hospitals. Second, because this is a theoretical analysis, the model developed in this study does not consider the actual driving speed and driving distance, but the speed of the unified average driving distance and the driving distance to take the average of multiple distances.
Practical implications
The results show that the method increases the selection space of decision-makers, provides them with stable technical support, helps them quickly determine the location of emergency medical facilities to respond to disaster relief work and provides better action plans for decision makers.
Social implications
The results show that the algorithm performs well, which verifies the applicability of this model. When the solution results of the improved GA are compared, the results show that the improved model has fewer evolutionary generations, faster operation speed and better model than the intermediate model GA. This model can more successfully find the optimal location decision scheme, making that more suitable for the location problem of megacities in the case of public health emergencies.
Originality/value
The research findings provide a theoretical and decision-making basis for the location of government emergency medical facilities, as well as guidance for enterprises constructing emergency medical facilities.
Details