1 – 10 of 11Tristan Gerrish, Kirti Ruikar, Malcolm Cook, Mark Johnson and Mark Phillip
The purpose of this paper is to present a review of the implications building information modelling (BIM) is having on the building energy modelling (BEM) and design of buildings…
Abstract
Purpose
The purpose of this paper is to present a review of the implications building information modelling (BIM) is having on the building energy modelling (BEM) and design of buildings. It addresses the issues surrounding exchange of information throughout the design process, and where BIM may be useful in contributing to effective design progression and information availability.
Design/methodology/approach
Through review of current design procedures and examination of the concurrency between architectural and thermophysical design modelling, a procedure for information generation relevant to design stakeholders is created, and applied to a high-performance building project currently under development.
Findings
The extents of information key to the successful design of a buildings energy performance in relation to its architectural objectives are given, with indication of the level of development required at each stage of the design process.
Practical implications
BIM offers an extensible medium for parametric information storage, and its implementation in design development offers the capability to include BEM parameter-integrated construction information. The extent of information required for accurate BEM at stages of a building’s design is key to understanding how best to record performance information in a BIM environment.
Originality/value
This paper contributes to the discussion around the integration of concurrent design procedures and a common data environment. It presents a framework for the creation and dissemination of information during design, exemplifies this on a real building project and evaluates the barriers experienced in successful implementation.
Details
Keywords
Tristan Gerrish, Kirti Ruikar, Malcolm Cook, Mark Johnson and Mark Phillip
The aim of this paper is to demonstrate the use of historical building performance data to identify potential issues with the build quality and operation of a building, as a means…
Abstract
Purpose
The aim of this paper is to demonstrate the use of historical building performance data to identify potential issues with the build quality and operation of a building, as a means of narrowing the scope of in-depth further review.
Design/methodology/approach
The response of a room to the difference between internal and external temperatures is used to demonstrate patterns in thermal response across monitored rooms in a single building, to clearly show where rooms are under-performing in terms of their ability to retain heat during unconditioned hours. This procedure is applied to three buildings of different types, identifying the scope and limitation of this method and indicating areas of building performance deficiency.
Findings
The response of a single space to changing internal and external temperatures can be used to determine whether it responds differently to other monitored buildings. Spaces where thermal bridging and changes in use from design were encountered exhibit noticeably different responses.
Research limitations/implications
Application of this methodology is limited to buildings where temperature monitoring is undertaken both internally for a variety of spaces, and externally, and where knowledge of the uses of monitored spaces is available. Naturally ventilated buildings would be more suitable for analysis using this method.
Originality/value
This paper contributes to the understanding of building energy performance from a data-driven perspective, to the knowledge on the disparity between building design intent and reality, and to the use of basic commonly recorded performance metrics for analysis of potentially detrimental building performance issues.
Details
Keywords
Rizwana Shaheen Hussain, Kirti Ruikar, Marcus P. Enoch, Nigel Brien and David Gartside
Diminishing local government budgets and the need to reduce highway works activities necessitate cost effective and efficient processes. The purpose of this paper is to…
Abstract
Purpose
Diminishing local government budgets and the need to reduce highway works activities necessitate cost effective and efficient processes. The purpose of this paper is to investigate streamlining road works administrative processes to enhance coordinated working at Derby City Council.
Design/methodology/approach
Case study research of a local authority was undertaken using business process mapping. Specifically, Swimlane analysis enabled re-engineering of business processes from design stage, to works permit issuance. Process improvement recommendations were validated by nine industry experts through a focus group and semi-structured interviews. A logic map was developed for transferability to other councils, identifying key attributes for a successful administrative road works management process.
Findings
Research revealed inherent silo working and processes built around fragmented IT systems creating process inefficiency. Validation found numerous practices and management styles were culturally embedded and common across councils. Peer reviewed recommendations are made to improve working practices, including improving IT systems, removing process bottlenecks, and training staff.
Research limitations/implications
Whilst road works management policy is generally under-researched, its strategic and negative impacts are widely acknowledged. This study highlights the day-to-day operational problems which are interconnected to the strategic impact, bridging an important gap in knowledge, as well as adding to business process re-engineering literature.
Originality/value
The research adds to a limited body of road works management policy research, and also presents a high-level logic map for councils to adopt as appropriate.
Details
Keywords
Maryam R. Nezami, Mark L.C. de Bruijne, Marcel J.C.M. Hertogh and Hans L.M. Bakker
Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern…
Abstract
Purpose
Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern infrastructures, requiring close collaboration of various infrastructure owners. To effectively manage and improve inter-organizational collaboration (IOC) in infrastructure construction projects, collaboration status should be assessed continually. This study identifies the assessment criteria, forming the foundation of a tool for assessing the status of IOC in interconnected infrastructure projects.
Design/methodology/approach
A systematic literature study and in-depth semi-structured interviews with practitioners in interconnected infrastructure construction projects in the Netherlands are performed to identify the criteria for assessing the status of IOC in infrastructure construction projects, based on which an assessment tool is developed.
Findings
The identified assessment criteria through the literature and the practitioner’s perspectives results in the designing and development of a collaboration assessment tool. The assessment tool consists of 12 criteria and 36 sub-criteria from three different categories of collaborative capacity: individual, relational, and organizational.
Originality/value
The assessment tool enables practitioners to monitor the status of IOC between infrastructure owners and assists them in making informed decisions to enhance collaboration. The assessment tool provides the opportunity to assess and analyze the status of collaboration based on three categories (i.e., individual, relational, and organizational).
Details
Keywords
Arturas Kaklauskas, Irene Lill, Dilanthi Amaratunga and Ieva Ubarte
This article’s purpose is to develop The Model for Smart, Self-learning and Adaptive Resilience Building (SARB).
Abstract
Purpose
This article’s purpose is to develop The Model for Smart, Self-learning and Adaptive Resilience Building (SARB).
Design/Methodology/Approach
Products and patents of methods and systems analysis was carried out in the fields of BIM application, Smart, Self-learning and Adaptive Resilience Building. Based on other researchers’ findings, The SARB Model was proposed.
Findings
Analysis of the literature showed that traditional decisions on the informational modelling do not satisfy all the needs of smart building technologies owing to their static nature. The SARB Model was developed to take care of its efficiency from the brief stage to the end of its service life.
Research Limitations/Implications
The SARB Model was developed to take care of its efficiency from the brief stage to the end of its service life. The SARB Model does have some limitations: (1) the processes followed require the collection of much unstructured and semi-structured data from many sources, along with their analyses to support stakeholders in decision-making; (2) stakeholders need to be aware of the broader context of decision-making and (3) the proposal is process-oriented, which can be a disadvantage during the model’s implementation.
Practical Implications
Two directions can be identified for the practical implications of the SARB Model. The initial expectation is the widespread installation of SARB Model within real estate and construction organisations. Furthermore, development of the SARB Model will be used to implement the ERASMUS+ project, “Advancing Skill Creation to ENhance Transformation—ASCENT” Project No. 561712-EPP-1-2015-UK-EPPKA2-CBHE-JP.
Originality/Value
The practical implications of this paper are valuable.
Details
Keywords
Josana Gabriele Bolzan Wesz, Carlos Torres Formoso and Patricia Tzortzopoulos
The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order…
Abstract
Purpose
The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order (ETO) building systems. This model was devised as an adaptation of the Last Planner® System for ETO multiple-project environments.
Design/methodology/approach
Design science research, also known as prescriptive research, was the methodological approach adopted in this research. An empirical study was carried out at the design department of a leading steel fabricator from Brazil, in which the proposed model was implemented in six different design teams.
Findings
The main benefits of the proposed model were shielding design work from variability, encouraging collaborative planning, creating opportunities for learning, increasing process transparency, and flexibility according to project status. Two main factors affected the effectiveness of the implementation process commitment and leadership of design managers, and training on design management and project planning and control core concepts and practices.
Research limitations/implications
Some limitations were identified in the implementation process: similarly to some previous studies (Ballard, 2002; Codinhoto and Formoso, 2005), the success of constraint analysis was still limited; some of the metrics produced (e.g. ABI, causes of planning failures) have not been fully used for process improvement; and systematic feedback about project status was not properly implemented and tested.
Originality/value
The main contributions of this study in relation to traditional design planning and control practices are related to the use of two levels of look-ahead planning, the introduction of a decoupling point between conceptual and detail design, the proposition of new metrics for the Last Planner® System, and understanding the potential role of visual management to support planning and control.
Details
Keywords
Felipe Albuquerque, Alvair Silveira Torres and Fernando Tobal Berssaneti
In recent years, innovative methodologies of product development such as lean product development (LPD) and agile project management (APM) have emerged. Even though previous…
Abstract
Purpose
In recent years, innovative methodologies of product development such as lean product development (LPD) and agile project management (APM) have emerged. Even though previous research studies focused on these subjects, only few of them were focused on traditional industries, as civil construction. The purpose of this paper is to cover a part of this gap by estimating the potential of the application of these two new approaches (LPD and APM) in the construction industry, more specifically on the design stage.
Design/methodology/approach
For this, a case study has been conducted in order to understand if some of LPD and APM tools and practices had already been used, and also to evaluate the potential application of these new methodologies. Three Brazilian companies have been evaluated, all of them were exclusive executors of the design stage and presented distinct characteristics (size, structure, business model, etc.).
Findings
The results show that there is currently little adherence to LPD and APM practices within the companies studied. In terms of potential application of these new methodologies, the study has identified evidence regarding technical similarities between the reported cases and others mentioned in literature. However, the interviewees’ reception of these concepts was mostly pessimistic, showing considerable resistance to changes in the current process.
Originality/value
According to the analysis, the study identified that the main challenge/hampering to the implementation of these tools in the cases studied herein are the functional organizational structures, the customer–supplier relationships and the internal cultural resistance to change.
Details
Keywords
Christian Nnaemeka Egwim, Hafiz Alaka, Eren Demir, Habeeb Balogun and Saheed Ajayi
This study aims to develop a comprehensive conceptual framework that serves as a foundation for identifying most critical delay risk drivers for Building Information Modelling…
Abstract
Purpose
This study aims to develop a comprehensive conceptual framework that serves as a foundation for identifying most critical delay risk drivers for Building Information Modelling (BIM)-based construction projects.
Design/methodology/approach
A systematic review was conducted using Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) to identify key delay risk drivers in BIM-based construction projects that have significant impact on the performance of delay risk predictive modelling techniques.
Findings
The results show that contractor related driver and external related driver are the most important delay driver categories to be considered when developing delay risk predictive models for BIM-based construction projects.
Originality/value
This study contributes to the body of knowledge by filling the gap in lack of a conceptual framework for selecting key delay risk drivers for BIM-based construction projects, which has hampered scientific progress toward development of extremely effective delay risk predictive models for BIM-based construction projects. Furthermore, this study's analyses further confirmed a positive effect of BIM on construction project delay.
Details
Keywords
Laura Saukko, Kirsi Aaltonen and Harri Haapasalo
The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.
Abstract
Purpose
The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.
Design/methodology/approach
A theoretical construct of, referred in this study as integration capability framework is elaborated following a systematic literature review. Thereafter, an integration capability self-assessment model, based on maturity thinking, is derived from the theoretical framework. The self-assessment model is further developed and tested for validity within five inter-organizational project networks in cooperation with industry practitioners, representing construction, industrial engineering, and mining sectors.
Findings
The results show that inter-organizational projects can use the developed model in self-assessing the maturity levels of various integration mechanisms, thus the state of integration capability at any point in time during inter-organizational projects.
Originality/value
This study is an attempt to identify how the integration capability dimensions can be self-assessed in inter-organizational projects, through the maturity levels of various integration mechanisms. The results offer insights for both academics and project management practitioners.
Details
Keywords
Carl Marnewick and Annlizé L. Marnewick
Project managers face decisions every day and those decisions result in an “either or” situation. This is also true when it comes to the choice of a project management approach…
Abstract
Purpose
Project managers face decisions every day and those decisions result in an “either or” situation. This is also true when it comes to the choice of a project management approach, i.e. predictive versus iterative. A case is made in this article that project managers should be ambidextrous and apply practices that are beneficial to the project, irrespective of the origin of the practices.
Design/methodology/approach
This study is based on a questionnaire focussing on six themes. The results of 290 projects were analysed using ANOVA and boxplots to test for skewness and variances.
Findings
Based on the analysis of 117 practices, most of these projects could be classified as either hybrid or iterative projects. The results indicate that irrespective of the classification of the projects or the industry, projects are managed using a hybrid approach, with a tendency to incorporate more iterative practices than predictive practices.
Originality/value
This article contributes to the current debate on which approach is the best given certain circumstances.
Details