Search results

1 – 10 of 332
Article
Publication date: 12 July 2023

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu, David J. Edwards and Eric Asamoah

Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide…

Abstract

Purpose

Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide decision-making on risk allocation in PPP power projects in Ghana.

Design/methodology/approach

A total of 67 risk factors and 9 risk allocation criteria were established from literature and ranked in a two-round Delphi survey using questionnaires. The fuzzy synthetic evaluation method was used in developing the risk allocation model.

Findings

The model’s output variable is the risk allocation proportions between the public body and private body based on their capability to manage the risk factors. Out of the 37 critical risk factors, the public sector was allocated 12 risk factors with proportions = 50%, while the private sector was allocated 25 risk factors with proportions = 50%.

Originality/value

To the best of the authors’ knowledge, this research presents the first attempt in Ghana at endeavouring to develop a QRAM for PPP power projects. There is confidence in the model to efficiently allocate risks emanating from PPP power projects.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 27 April 2022

Ewald Kuoribo, Peter Amoah, Ernest Kissi, David John Edwards, Jacob Anim Gyampo and Wellington Didibhuku Thwala

Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work…

Abstract

Purpose

Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work outside of their geographical spectrum; however, the multicultural dissimilarities of construction workforces within the project management team (and how these may impact upon project productivity performance) have been given scant academic attention. To bridge this knowledge gap, this paper aims to analyse the effects of a multicultural workforce on construction productivity.

Design/methodology/approach

The epistemological positioning of the research adopted mixed philosophies (consisting of both interpretivism and postpositivism) to undertake a deductive and cross-sectional survey to collate primary quantitative data collected via a closed-ended structured questionnaire. Census sampling and convenience sampling techniques were adopted to target Ghana’s construction workforce and their opinions of the phenomenon under investigation. Out of 96 questionnaires administered, 61 were retrieved. The data obtained were analysed by using mean score ranking, relative important index, one sample t-test and multiple regression. The reliability of the scale was checked by using Cronbach’s alpha coefficient.

Findings

From the t-test analysis, 11 variables sourced from extant literature, and the null hypothesis for the study was not rejected and all factors (except high cost of training and improper gender diversity management) were affirmed as negative effects of the multicultural workforce on construction productivity. Using multiple regression analysis, six of the independent variables were shown to impact upon productivity. The goodness of fit was verified by collinearity and residual analysis. The model’s validation revealed a relatively high predictive accuracy (R2 = 0. 589), implying that the results could be generalized. In culmination, these findings suggest that the predictors can be used to accurately predict the effects of multicultural workforce on construction productivity performance.

Practical implications

The findings indicate that multicultural workforce/teams have a substantial effect on overall construction productivity in the construction sector; consequently, stakeholders must address this issue to enhance productivity across the sector.

Originality/value

The current study significantly contributes to our understanding of how multicultural workers/teams affect construction productivity in the construction business perspective and how to respond to the negative menace.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 March 2022

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards

In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The…

Abstract

Purpose

In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The public–private partnership (PPP) model has been identified as an option to address the challenges in the power sector. The purpose of this research paper is to critically explore the reasons for entering into PPP power projects in Ghana by the public and private parties.

Design/methodology/approach

Questionnaires were used to elicit responses from respondents using a two-round Delphi survey. From 60 respondents contacted in round one, 48 responses were obtained, and these 48 respondents further took part in round two. Mean score ranking was used to rank the reasons for entering into PPP power projects, while analysis of variance (ANOVA) was run to test significant difference in perceptions among the respondents.

Findings

From round 2 of the Delphi survey, the significant reasons for public sector entering into PPP power projects were as follows: achieving improved value for money, access to additional capital, increased certainty of projects and greater efficiency of project delivery services. For private sector, most significant reasons were as follows: obtaining of investment support, improvement in private sector’s international image and synergy with public sector. From ANOVA analysis, there were significant different perceptions among some of factors on the respondent profile variables and the reasons for entering into PPP power projects, while other factors did not have significant different perception.

Originality/value

Significant reasons for both public and private sectors identified would be incorporated by the government when PPP policy guidelines and laws are reviewed. This will aid in the effective implementation of PPP for power projects.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 27 July 2022

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards

Demand for private investment in infrastructure, notably in the power sector remains high, and this is anticipated to expand with the passage of time. Very little research…

Abstract

Purpose

Demand for private investment in infrastructure, notably in the power sector remains high, and this is anticipated to expand with the passage of time. Very little research currently exists on the power sector and specifically the private sector influencing factors (PSIFs) for entering into public–private partnerships (PPPs). The purpose of this study is to explore influencing factors for private sector participation in PPP power projects in Ghana.

Design/methodology/approach

Using purposive and snowball sampling techniques, questionnaires were used to gather responses from experts in the PPP power sector domain in a two-round Delphi survey. Reliability analysis was conducted using Cronbach’s alpha coefficient and level of agreement tested using Kendall’s concordance. Mean score ranking, analysis of variance (ANOVA) and Chi-square test were the main analysis conducted on the influencing factors.

Findings

The most significant PSIFs were: obtaining of investment support; improvement in private sector’s international image; synergy with public sector; sharing of risks; and gaining of profits. From ANOVA results, all the influencing factors had no significant different perception between the number of years in PPP practice and the motivations for the private sector entering into PPP power projects. Using Chi-square, the association between the variables indicated they were statistically significant.

Practical implications

The findings in this study are significant for multinational power generation firms that seek to enter the Ghanaian energy sector to help fill the generation gap and deficit.

Originality/value

The output of this research contributes to the checklist of influencing factors for private sector participation in PPP power projects and enhances the development of PPP practice.

Details

Journal of Facilities Management , vol. 22 no. 2
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 9 April 2024

Evans Kwesi Mireku, Ernest Kissi, Ivy Maame Adwoa Abu, Alex Acheampong and Nana Kwame Peprah Armah

The construction sector is recognized for subjecting its workers to various psychological pressures and mental stressors. As a result, it is crucial to explore and discover…

Abstract

Purpose

The construction sector is recognized for subjecting its workers to various psychological pressures and mental stressors. As a result, it is crucial to explore and discover effective strategies to support these workers in managing and enduring these demanding circumstances. Mental toughness is a concept that has been advocated to aid individuals in coping and adapting to pressures and challenges. Therefore, it is imperative to explore strategies critical to developing mental toughness among construction professionals. Thus, the purpose of this study is to identify critical strategies for the development of mental toughness among construction professionals.

Design/methodology/approach

A comprehensive literature review was conducted using Google Scholar, Scopus, ScienceDirect and PubMed databases to identify the strategies for the development of mental toughness. These identified strategies were used to develop a structured closed-ended questionnaire to aid in data collection. Of the 317 questionnaires distributed, 207 were collected and used for data analysis. The data were analysed using mean score ranking and one sample t-test.

Findings

The study highlighted 12 critical strategies for the development of mental toughness among construction professionals. These include recognizing and rewarding achievements, taking time for self-care, organizing mental training programs, using positive self-talk, embracing a growth mindset, providing social support/developing a strong support network, creating a challenging training environment, engaging in regular physical exercise, fostering a mastery motivational climate, setting clear but challenging goals, practicing mental imagery and practicing reflection on setbacks and failures. The analysis results indicated that all of the strategies, except one (which involves practicing reflection on setbacks and failures), displayed significance. By incorporating these strategies, construction firms and the industry as a whole can empower their workforce to cope and/or overcome the various demands and stressors that work and life places on them.

Research limitations/implications

The study highlights the significance of recognizing and rewarding achievements, fostering a growth mindset and implementing mental training programs to cultivate mental toughness among construction professionals. Moreover, promoting self-care practices and offering social support are essential strategies for enhancing mental resilience in the construction industry. By adopting these evidence-based approaches, construction organizations can create a mentally tough workforce capable of handling the challenges and demands of the industry effectively.

Originality/value

This study contributes significantly to the general body of knowledge in mental health management among employees in the construction industry. It does set the pace for the development of the general well-being of construction professionals in the achievement of mental toughness goals.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 10 March 2022

Huimin Li, Chenchen Xu, Yongchao Cao and Chengyi Zhang

The purpose of this paper is twofold: first, it explores the influencing factors of the government’s trust decision-making in the private sector; second, it explores how these…

Abstract

Purpose

The purpose of this paper is twofold: first, it explores the influencing factors of the government’s trust decision-making in the private sector; second, it explores how these influencing factors affect the government’s trust decisions.

Design/methodology/approach

A theoretical model was established, and a questionnaire survey was conducted among 152 professionals. The collected datas were analyzed by the structural equation modeling (SEM) method.

Findings

The study identified four critical factors that influence the government’s decision to trust the private sector in public-private-partnership (PPP) projects. All the four factors have a positively correlated impact on the government’s trust decision-making. The structural equation path analysis shows that the most important factor affecting the government’s trust decision-making is the trustee’s (private sector) trustworthy characteristics, and the path coefficient is 0.92. The path coefficients of risk perception and the trustor’s trust tendency are 0.83 and 0.74, respectively. The influence of the legal system environment on government trust decision-making is moderate, with a path coefficient of 0.68.

Originality/value

This paper contributes to the literature in two aspects. First, the factors influencing decision-making to government trust in the private sector in PPP projects have been identified. Second, a comprehensive view of the mechanism of government trust in the private sector in PPP projects has been theorized by the SEM method.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 26 April 2024

Sujoy Biswas and Arjun Mukerji

The purpose of this study is to examine the buyers’ preferences influencing the purchase of privately developed affordable housing in Kolkata and to determine whether unsold…

Abstract

Purpose

The purpose of this study is to examine the buyers’ preferences influencing the purchase of privately developed affordable housing in Kolkata and to determine whether unsold houses result from misalignment with these preferences.

Design/methodology/approach

The literature review and user-opinion survey identified 119 independent variables that indicate buyers’ preferences. A questionnaire survey of 383 households in affordable housing units from 32 housing complexes in Kolkata recorded buyers’ preferences and satisfaction against the independent variables grouped under five levels of characteristics. The product weights of variables derived from the rank sum method and percentage satisfaction give the Utility Score. Multivariate regression and univariate linear regressions were conducted to determine the significance of each Level of characteristics and each variable, identifying the significant variables that would affect the sale of affordable houses.

Findings

The multivariate regression analysis has indicated that 68.56% of the variation in the percentage of unsold houses was explained by the five utility scores, which affirms that misalignment with buyers’ preferences significantly affects the sale of privately developed affordable houses. Furthermore, building and neighbourhood-level utility show the highest significance as predictors, while city-level and miscellaneous utility have moderate significance, but housing complex-level utility lacks statistical significance.

Originality/value

This study addresses a research gap in privately developed affordable housing in Kolkata, enhancing understanding of buyer preferences in this segment.

Details

International Journal of Housing Markets and Analysis, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1753-8270

Keywords

Article
Publication date: 18 April 2024

John Aliu, Ayodeji Emmanuel Oke, Isaac I. Akinwumi, Rislan Abdulazeez Kanya and Lydia Uyi Ehiosun

This study aimed to investigate and analyze the level of awareness and adoption of distributed ledger technologies (DLTs) within the Nigerian construction industry. The focus was…

Abstract

Purpose

This study aimed to investigate and analyze the level of awareness and adoption of distributed ledger technologies (DLTs) within the Nigerian construction industry. The focus was on addressing the current state of DLT utilization, identifying challenges and opportunities and proposing strategies to enhance the integration of DLTs into the construction processes and practices of Nigerian professionals and organizations.

Design/methodology/approach

The research was underpinned by a robust theoretical and conceptual framework, drawing from established theories of technology adoption. A comprehensive literature review guided the identification of various DLT types. This informed the development of a well-structured questionnaire, which was then distributed to Nigerian construction professionals. The collected data underwent analysis using percentages, frequencies, mean scores, the Kruskal–Wallis H-test and the Shapiro–Wilk test.

Findings

A significant finding of this study reveals a generally low awareness and implementation of DLT among construction professionals in Nigeria. These findings emphasize the urgent need for comprehensive strategies to bridge the gap between awareness and adoption of DLT within the Nigerian construction industry.

Practical implications

Industry associations, regulatory bodies and educational institutions can collaborate to develop specialized programs aimed at familiarizing professionals with the benefits and applications of DLTs. Additionally, technology providers and policymakers can leverage these findings to design user-friendly interfaces and guidelines for seamless DLT integration into construction processes.

Originality/value

This study contributes to the existing body of knowledge by providing a comprehensive assessment of the awareness and adoption of DLTs specifically within the Nigerian construction industry. While the global recognition of DLT’s potential in construction is acknowledged, this research delves into a regional context, shedding light on the specific opportunities within Nigeria. Furthermore, the study’s identification of a gap between awareness and implementation highlights a critical area for future exploration and development in the field of construction technology adoption.

Details

Technological Sustainability, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2754-1312

Keywords

1 – 10 of 332